Jump to content

Line 1 (Fuzhou Metro)

From Wikipedia, the free encyclopedia
Line 1
Train number 115 entering Dongjiekou Station
Overview
StatusIn Operation
OwnerCity of Fuzhou
LocaleFuzhou, Fujian, China
Termini
Stations25
Websitehttp://www.fzmtr.com
Service
TypeRapid transit
SystemFuzhou Metro
Operator(s)Fuzhou Metro Co., Ltd.
Depot(s)Xindian Depot, Qingliangshan Depot
Rolling stock28 cars, type B
History
OpenedMay 18, 2016; 8 years ago (2016-05-18)
Technical
Line length29.84 km (18.5 mi)
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)
Electrification1500 V DC overhead wires
Operating speed80 km/h (50 mph)
Route map


Car 01151 with jasmine decorations

Line 1 of Fuzhou Metro (simplified Chinese: 福州地铁1号线; traditional Chinese: 福州地鐵1號線; pinyin: Fúzhōu Dìtiě Yī Hào Xiàn) is a north-south line of the Fuzhou Metro network in Fuzhou, Fujian Province, China. This line is the first operating metro line in the Fuzhou Metro system, inaugurated on May 18, 2016.[1] By June 2016, the south section, running from Sanchajie to Fuzhou South, is in operation.[2] The north section opened on 6 January 2017. This line is colored red on system maps.

The construction of Line 1 is divided into two phases. The first phase runs from Xiangfeng to Fuzhou South. This part of Line 1 is 24.89 km in length and has 21 stations. The second phase runs from Fuzhou South to Sanjiangkou with 4 stations. This part is 4.921 km long.[3]

Service Schedule

[edit]
Segment Commencement Length Station(s) Name
Sanchajie — Fuzhou South Railway Station 18 May 2016 9.76 km (6.06 mi) 9 Phase 1 (southern section)
Xiangfeng — Shangteng 6 January 2017 15.13 km (9.40 mi) 12 Phase 1 (northern section)
Anping — Sanjiangkou 27 December 2020 4.921 km (3.06 mi) 4 Phase 2

Route

[edit]

Line 1 is a metro rail line running from north to south in Fuzhou metropolitan area. It operates between Xiangfeng Station and Sanjiangkou Station, running through Fuzhou Railway Station, Dongjiekou Station, Nanmendou Station, Sanchajie Station, Chengmen Station, and Fuzhou South Railway Station, all of which are cities' major transportation junctions and proposed transfer stations with other subway lines.

Stations

[edit]
Station name Connections Distance
km
Jurisdiction
English Chinese
Xiangfeng 象峰 0.00 0.00 Jin'an
Xiushan 秀山 1.51 1.51
Luohanshan 罗汉山 0.97 2.48
Fuzhou Railway Station 福州火车站  F1  Fuzhou railway station FZS 1.65 4.13
Doumen 斗门 1.20 5.33
Shudou 树兜 0.80 6.13 Gulou
Pingshan 屏山 1.32 7.45
Dongjiekou 东街口  4  1.15 8.60
Nanmendou 南门兜  2  1.00 9.60
Chating 茶亭 0.95 10.55 Gulou/Taijiang
Dadao 达道 1.50 12.05 Taijiang
Shangteng 上藤 1.73 13.78 Cangshan
Sanchajie 三叉街  F1  1.05 14.83
Baihuting 白湖亭 1.43 16.26
Huluzhen 葫芦阵 1.30 17.56
Huangshan 黄山 0.97 18.53
Paixia 排下 1.05 19.58
Chengmen 城门  4  1.00 20.58
Sanjiaocheng 三角埕 1.00 21.58
Lulei 胪雷 1.47 23.05
Fuzhou South 福州火车南站  5  Fuzhou South railway station FYS 1.00 24.05
Anping 安平
Liangcuo 梁厝  6 
Xiayang 下洋  6 
Sanjiangkou 三江口

Operating hours

[edit]

During the first few months of operation, only the south section of Line 1 was in operation. The hours of operation during that time were from 7:00 to 20:20.

After the north section of the line opened, the hours of operation were extended. Nowadays, Line 1 begins operations at 6:30 and ends operations at 23:00.

Rolling stock

[edit]
Type Time of manufacturing Series Sets Assembly Notes
Type B 2014 - 2015 Fulong B2 28 Tc+Mp+M+M+Mp+Tc Designed by Tangshan Railway Vehicle, Manufactured by CNR Quanzhou.

See also

[edit]

References

[edit]
  1. ^ "福州地铁1号线南段开通试运营-文字报道-中华人民共和国交通运输部". www.moc.gov.cn. Retrieved 2016-06-14.
  2. ^ "福建首条地铁一期开通 福州正式迈入地铁时代 - 滚动热点 - 21CN.COM". news.21cn.com. Retrieved 2016-06-14.
  3. ^ 网易. "福州地铁1号线北段还差17米贯通 以三叉街站为界(图)_网易新闻". news.163.com. Retrieved 2016-06-14.
[edit]
KML is from Wikidata