Fall River Depot | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
General information | |||||||||||
Location | Pearce Street east of Davol Street Fall River, Massachusetts | ||||||||||
Coordinates | 41°42′50″N71°9′15″W / 41.71389°N 71.15417°W | ||||||||||
Line(s) | Fall River Secondary | ||||||||||
Platforms | 1 side platform | ||||||||||
Tracks | 2 | ||||||||||
Connections | SRTA: 102 [1] | ||||||||||
Construction | |||||||||||
Parking | 513 spaces | ||||||||||
Bicycle facilities | 8 spaces | ||||||||||
Accessible | Yes | ||||||||||
Other information | |||||||||||
Fare zone | 8 [2] | ||||||||||
History | |||||||||||
Opened | c. 1870 (previous station) | ||||||||||
Opening | May 2025 (planned) | ||||||||||
Closed | September 5, 1958 (previous station) | ||||||||||
Previous names | Bowenville | ||||||||||
Passengers | |||||||||||
2030 (projected) | 390 daily boardings [1] : 2–66 | ||||||||||
Planned services | |||||||||||
| |||||||||||
|
Fall River station (Fall River Depot) is an under-construction MBTA Commuter Rail station in Fall River, Massachusetts. The station is being constructed as part of the South Coast Rail project and is expected to open in May 2025.
The Fall River Railroad opened from Myricks to Fall River on June 9, 1845, and to the Old Colony Railroad at South Braintree in December 1846. [3] [4] : 403 They merged as the Old Colony and Fall River Railroad in 1854. [4] : 403 As the Old Colony and Newport Railway, it opened a line from Fall River south to Newport, Rhode Island in 1864. [4] : 416 The Dighton and Somerset Railroad opened in 1866, joining the Fall River mainline at Somerset Junction, north of Fall River. [4] : 393
Bowenville station opened in the north part of Fall River around 1870. [5] [6] [7] [8] The railroad changed names again to become the Old Colony Railroad in 1872. The Old Colony constructed a station building at Bowenville, located on the east side of the tracks between Turner Street and Old Colony Street, in 1874. [9] A branch of the Providence, Warren and Bristol Railroad (known as the Fall River, Warren and Providence Railroad) opened over the new Slade's Ferry Bridge on December 5, 1875, connecting to the Fall River mainline north of Bowenville; the branch provided electrified passenger service between Providence and Fall River from 1900 to 1934. [3] [10]
A new station designed by Bradford Gilbert opened in 1892 between Lincoln Avenue and Pearce Street, just north of the existing Bowenville station. Named Fall River, it became the main station for the city. [11] [12] The station was raised 8 feet (2.4 m) as part of a 1902–1905 project that eliminated eleven grade crossings in the city. [12]
Service to Providence, and to Taunton over the Dighton and Somerset, both ended in 1932. [4] : 172, 395 Newport service ended in 1938 due to the 88 stations case; Ferry Street station was closed until around 1950, leaving Fall River as a terminal. [4] : 416 Fall River service was suspended from 1949 to 1952, and ultimately ended on September 5, 1958. [13]
In September 2008, MassDOT released 18 potential station sites for the South Coast Rail project, including Fall River Depot off Davol Street. [14] A 2009 conceptual design called for a single 730 ft (220 m) side platform serving the west track, with a second track allowing freight trains to pass the high-level platform; a two-story parking deck would be located on the west side of the tracks. [15] Plans released as part of the Final Environmental Impact Report in 2013 were nearly identical. [16] A 2009 corridor plan called for mixed-use transit-oriented development around the new station. [17] On June 11, 2010, the state took ownership of the Fall River Subdivision and several other CSX lines as part of a sale agreement. [18]
In 2017, the project was re-evaluated due to cost issues. A new proposal released in March 2017 called for early service via Middleborough by 2024, followed by full service via Stoughton by 2029. [19] The January 2018 Draft Supplemental Environmental Impact Report reconfigured the planned parking lot configuration, as part of the previously planned deck site had been developed for use by a business. A parking lot on the west side of the tracks will be constructed during Phase 1, with a possible eastern lot (on the site of an existing retail structure) to be added later. [1] : 44
The MBTA awarded a $159 million contract for construction of the Fall River Secondary portion of the project, including Fall River station, in May 2020. Service was then planned to begin in November 2023. [20] [21] Two former industrial buildings were demolished in 2020 to make room for the station and its parking lot. [22] [23] The station was 32% complete by February 2022, with 96% of platform foundations and some retaining walls in place. [24] Construction of the station reached 90% completion in October 2022, with the platform and canopies in place. [25] [26] [27] Substantial completion of the Fall River Secondary work was announced in December 2022. [28] Opening was delayed to mid-2024 in September 2023. [29] In June 2024, the opening of the project was delayed to May 2025. Fall River station was complete by that time. [2]
The MBTA Commuter Rail system serves as the commuter rail arm of the Massachusetts Bay Transportation Authority's (MBTA's) transportation coverage of Greater Boston in the United States. Trains run over 394 mi (634 km) of track to 135 stations. It is operated under contract by Keolis, which took over operations on July 1, 2014, from the Massachusetts Bay Commuter Railroad Company (MBCR).
Route 128 station is a passenger rail station located at the crossing of the Northeast Corridor and Interstate 95/US Route 1/Route 128 at the eastern tip of Dedham and Westwood, Massachusetts, United States. The station is shared by Amtrak and the Massachusetts Bay Transportation Authority (MBTA). It is served by most MBTA Commuter Rail Providence/Stoughton Line trains, as well as by all Amtrak Northeast Regional and Acela intercity trains. The station building, platforms, and parking garage are all fully accessible. It is the 23rd busiest Amtrak station in the country and the fifth busiest in New England.
South Attleboro station is an MBTA Commuter Rail Providence/Stoughton Line station in Attleboro, Massachusetts. It is located under Newport Avenue in the South Attleboro neighborhood, just north of the Rhode Island border. The station has two side platforms serving the two tracks of the Northeast Corridor, formerly connected by a footbridge to a park-and-ride lot; only the north platform is in use.
Foxboro station is an MBTA Commuter Rail station in Foxborough, Massachusetts, located adjacent to Gillette Stadium and the Patriot Place shopping center. The station has a single side platform serving the main track of the Framingham Secondary. It is the terminus of a branch of the Franklin/Foxboro Line service, and is served by trains from Boston via the Franklin/Foxboro Line and from Providence via the Providence/Stoughton Line during events at Gillette Stadium.
Braintree station is an intermodal transit station in Braintree, Massachusetts. It serves the MBTA's Red Line and the MBTA Commuter Rail Old Colony Lines as well as MBTA buses.
The Greenbush Line is a branch of the MBTA Commuter Rail system which serves the South Shore region of Massachusetts. The 27.6-mile (44.4 km) line runs from downtown Boston, Massachusetts through the cities and towns of Quincy, Braintree, Weymouth, Hingham, Cohasset, and Scituate to the Greenbush neighborhood in southern Scituate. There are ten stations along the line. From South Station, to Quincy Center, service operates in conjunction with the Old Colony Lines commuter rail service via the Old Colony Main Line. From Weymouth Landing/East Braintree to Greenbush, trains utilize the Greenbush Branch, the former South Shore Railroad line that was later incorporated into the Old Colony Railroad.
Readville station is a Massachusetts Bay Transportation Authority (MBTA) commuter rail station located in the Readville section of the Hyde Park neighborhood of Boston, Massachusetts. It is served by the MBTA Commuter Rail Fairmount, Franklin/Foxboro, and Providence/Stoughton Lines. Readville is the outer terminus for most Fairmount service, though some trips continue as Franklin/Foxboro Line trains. The station is located at a multi-level junction, with the Attleboro Line tracks at ground level and the Dorchester Branch above. Franklin/Foxboro Line trains that run on the Northeast Corridor use a connecting track with a separate platform. An MBTA maintenance and storage yard and a CSX Transportation freight yard are located near the station.
Mansfield station is an MBTA Commuter Rail station in Mansfield, Massachusetts. Located in downtown Mansfield, it serves the Providence/Stoughton Line. With 1,966 weekday boardings in a 2018 count, Mansfield is the third-busiest station on the system outside Boston.
Sharon station is an MBTA Commuter Rail station in Sharon, Massachusetts. It serves the Providence/Stoughton Line. The station has two separate entrances for inbound trains to Boston and for outbound trains to Providence and beyond. New platforms were constructed in 2014 to make the station accessible.
Stoughton station is an MBTA Commuter Rail station in downtown Stoughton, Massachusetts. It is the current terminus of the Stoughton Branch of the Providence/Stoughton Line. The station has a parking lot to serve local riders and those driving from further south, as Stoughton is close to the Massachusetts Route 24 expressway. Stoughton currently has one platform serving one track; the platform has a mini-high section for accessibility.
Brockton station is an MBTA Commuter Rail station in Brockton, Massachusetts. It serves the MBTA Middleborough/Lakeville Line and is a stop on the seasonal CapeFLYER service. The station has a single accessible full-length high-level platform that serves the line's two tracks. It is located adjacent to the BAT Centre, the primary hub for Brockton Area Transit Authority local bus service.
Middleborough/Lakeville station is an MBTA Commuter Rail station in Lakeville, Massachusetts, just south of the Middleborough border. It is the southern terminus of the Middleborough/Lakeville Line; it is also an intermediate stop for seasonal CapeFlyer service to Cape Cod. Middleborough/Lakeville has a single full-length high-level side platform serving the line's single track.
South Coast Rail is a project to build a new southern line of the MBTA Commuter Rail system along several abandoned and freight-only rail lines. The line will restore passenger rail service between Boston and the cities of Taunton, Fall River, and New Bedford, via the towns of Berkley, and Freetown, on the south coast of Massachusetts. It includes passenger service to some of the southern lines of the former Old Colony Railroad and the New York, New Haven and Hartford Railroad.
East Taunton station is a not-yet-opened MBTA Commuter Rail station in East Taunton, Massachusetts adjacent to the interchange between the Route 24 expressway and County Street. It is planned to open in 2025 as part of the first phase of the South Coast Rail project.
Freetown station is a future MBTA Commuter Rail station located in the Assonet village of Freetown, Massachusetts. It is planned to open in May 2025 as part of the first phase of the South Coast Rail project. The station will have a single side platform on the west side of the Fall River Secondary, along with a park and ride lot.
Battleship Cove is a proposed MBTA Commuter Rail station in Fall River, Massachusetts. It is planned to be the southern terminus of the Fall River branch of the South Coast Rail project, and will open in 2030 as part of the project's Phase II. The station will have no parking—it is intended for tourists visiting Battleship Cove and the Fall River waterfront, with Fall River station to the north serving commuters—and will be open seasonally. Previous passenger service to Fall River included stations at Fall River Wharf (1847–1937) and Ferry Street (1864–1958). The Wharf station was the terminus of the Fall River Line steamship service.
Church Street station is an under-construction MBTA Commuter Rail station located in northern New Bedford, Massachusetts, United States. It is planned to open in May 2025 as part of the first phase of the South Coast Rail project. The station will have a single side platform on the east side of the New Bedford Subdivision, along with a park and ride lot.
New Bedford station is an under-construction MBTA Commuter Rail station in New Bedford, Massachusetts. The station is being constructed as part of the South Coast Rail project and is expected to open in May 2025.
The Dighton and Somerset Railroad, currently referred to as the Dean Street Industrial Track, is a railroad that ran between Fall River and Braintree, Massachusetts. It opened in 1866; from the 1890s to the 1930s and again in the late 1950s, it was the primary rail route from Boston to the South Coast. Passenger service ended in stages with the final regular service in 1958, though freight service on two short segments continues into the 21st century. MBTA Commuter Rail service is proposed to be extended onto the northern part of the line around 2030 as part of the South Coast Rail project.
Middleborough station is an under-construction MBTA Commuter Rail station in Middleborough, Massachusetts. It is expected to open in May 2025 as part of the South Coast Rail project, replacing Middleborough/Lakeville station for regular service. The station will have a single side platform located inside the wye between the Middleborough Main Line and the Middleboro Secondary.
Media related to Fall River station at Wikimedia Commons