The Cranleigh line was a railway line in England that connected Guildford in Surrey, with Horsham in West Sussex. Construction of the line was started by an independent company, the Horsham and Guildford Direct Railway, but management failures delayed construction, and the company was taken over by the London, Brighton and South Coast Railway (LBSCR). The LBSCR completed the construction of the line and it was opened in 1865; it was nearly 16 miles in length.
At Guildford the trains relied on using the station and approach route of the London and South Western Railway (LSWR). There was competitive tension between the LSWR and the LBSCR, and at the time Guildford station was already congested, so that access negotiations were not easy. The hopes of the original promoters that the line would become a trunk route for traffic from the Midlands to the Sussex Coast were not fulfilled, and low usage due to the agricultural nature of the terrain the line served resulted in continuous financial losses.
When British Railways considered the future of loss-making services in the mid-1960s, the line came under scrutiny. The line was closed as part of the Beeching cuts on 14 June 1965.
The London and Brighton Railway opened its main line between those places in 1841, [1] and had already opened a branch line, more simply constructed, to Shoreham in 1840. [2] The London and Brighton Railway merged with other companies to form the London, Brighton and South Coast Railway (LBSCR) in 1846. [3]
In 1848 the LBSCR built a branch line from Three Bridges, on the Brighton main line, to Horsham, then an insignificant town. There the railway remained for some years, during which Horsham grew in importance. [4] The next development was the construction of the Mid-Sussex Railway, opened in 1859. At first the Mid-Sussex Railway was to link Horsham and Petworth, but it later became part of a main line connection between London and the South Coast. [5]
In 1861 a line from Horsham to Shoreham was opened, known as the Steyning Line. This gave a link to Brighton, leaving the Mid-Sussex line at Itchingfield Junction, three miles south of Horsham. [6]
Meanwhile, Guildford, as the county town of Surrey was already of considerable importance. The London and Southampton Railway opened its main line throughout in 1840 [7] and had changed its name to the London and South Western Railway in 1839. [8] It passed Guildford several miles away, to the north, with a station at Woking (at the time named Woking Common). A branch line to Guildford was opened in 1845, [9] and this was extended to a Godalming station by a nominally independent company, opening in 1849. [10] In addition, the LSWR opened a branch line from Guildford via Tongham to Farnham, also in 1849. [11]
Another railway route opened in 1849, the Reading, Guildford and Reigate Railway. In the Guildford area it relied on running powers over the LSWR lines, from Shalford Junction south of Guildford, through Guildford station, and then as far as Ash Junction on the Farnham line. These running powers had been authorised by Parliament. The Reading Guildford and Reigate Railway was an affiliate of the South Eastern Railway (SER), whose main focus was from London into Kent and East Sussex. However the connection it now had to Reading gave the possibility of an alliance with the Great Western Railway, which ran through Reading on its main line between London and Bristol, with connecting lines to South Wales and (under construction) to the West Midlands.
In the early decades of the nineteenth century, access to tidal water was a significant benefit to a population centre, enabling heavy materials to be brought in and taken away by coastal shipping. In the case of Guildford this had been achieved since 1816 by the Wey and Arun Canal. The canal proprietors saw that they were losing business to the railways and they decided that conversion of part of their canal to a railway would be worthwhile. The sixteen miles between Guildford and Pulborough could be converted for about £8,000 a mile, and would give access to the navigable section of the River Arun, and to the English Channel at Littlehampton. They met with the directors of the LBSCR in August 1859, evidently hoping for financial collaboration, but the LBSCR invited them to develop their idea into a more definite proposal. They failed to do so. [12]
Another scheme of a railway between Guildford and Horsham was being formulated at the same time, and a Bill was submitted to Parliament in the 1860 session, for a Horsham and Guildford Direct Railway (H&GDR). As the proposal presumed a connection with the LBSCR at Horsham, and no negotiation had taken place on the matter, the LBSCR opposed the Bill at first, to protect its interests. An approach from the promoters of the new railway, asking whether the LBSCR would work the line when built, met with approval and an agreement was concluded on 21 June 1860. The Horsham and Guildford Direct Railway Act gained the Royal Assent on 6 August 1860. [13] [14] Powers were given to make working arrangements with the LBSCR and the nominally independent Mid-Sussex Railway, with which the new line would make a junction. The LBSCR was allowed to contribute £75,000 to the capital of the new company. [12] [15]
The line would also make a junction with the LSWR south of Guildford and the Act authorised running powers on the LSWR. This was not specified in much detail, and the company had to negotiate with the LSWR. Initially the LSWR rebuffed the approach, stating that it would want the LBSCR to be a party to any talks, as there was a territorial exclusivity agreement in force between the two larger companies. Dating from 1860, the LSWR and the LBSCR had agreed not to develop or encourage new lines into areas considered to be the territory of each other. The Horsham and Guildford line would cross the agreed boundary. [12]
Unsatisfactory talks dragged on, and the Horsham and Guildford company's directors showed themselves to be ineffective in finalising matters. At a board meeting on 8 March 1862 several H&GDR directors resigned; some other proposed board members turned out to be disqualified, having inadequate share holdings; and LBSCR nominees were elected, effectively taking over the company. [12]
The prevarication over working arrangements had led to inaction over actual construction; there was a time limit in the authorising Act of four years, expiring in August 1864, so construction became urgent. The construction contract was made on 16 April 1862. In reviewing the plans for the work, the HGDR Board -- now effectively the LBSCR -- expressed dissatisfaction with the route. Hood states that
the directors noted that the new plans showed considerable alteration to the parliamentary line in some places" and Mr Jacomb-Hood, the LBSCR engineer, was informed that the alterations were unsatisfactory to the Board. They also required a junction towards Horsham at Stammerham. It appears that despite their railway's title, Mr Jacombe-Hood had omitted a junction to link the railway with Horsham. Apparently only the southward spur directly to the Shoreham line was included. He explained to the Board on 28 March 1862 that he entirely forgot that he had been informed of the line's route by Mr Woods, the H&GDR company engineer.
The LBSCR endorsed changes to the route on 1 April 1862 and Woods was dismissed. [note 1] [16]
There was continuing concern over the slow progress of construction, and on 11 May 1863 it was reported that the land for six miles of the route between Cranleigh and Guildford had not yet been purchased. [16]
On 29 July 1862 the two companies had formally agreed that the LBSCR would absorb the H&GDR company. The uncompleted railway was sold to the LBSCR for £123,000. This was authorised by the LBSCR Additional Powers Act of 29 July 1864. [note 2] [13] [17] [18] [19]
On 2 May 1865 Frederick Bannister, now the engineer to the line, reported that the line would be ready for opening on 1 June 1865. The Board of Trade Inspecting Officer, Colonel Yolland visited, probably in May 1865, and refused consent to open. Subsequent visits in July and August 1865 had the same outcome. The principal difficulty was the working arrangement at Guildford, and after prolonged negotiations, Yolland was satisfied, and the line opened for traffic on 2 October 1865. [20] [21] [22] [13]
The line was single throughout, worked on the staff and ticket system. Baynards was the only crossing point at first, although passing loops were provided later at Bramley in 1876 and Cranleigh in 1880. [15] The line was 15 miles 48 chains in length. [20] [23]
On 24 October 1865 the directors agreed on a LSWR proposal to enlarge part of Guildford station. Although Yolland had sanctioned the opening of the line, he had refused the opening of Rudgwick station intermediately, because it was on a 1 in 80 gradient; he required the gradient to be eased to no steeper than 1 in 130 for safety reasons; this was done, not without some difficulty, and Rudgwick station opened in November 1865. [20] [24] [22]
The southwards connecting spur at Stammerham (known as Itchingfield South Fork) was intended to allow trains to run between Guildford and Shoreham directly, but in fact very little such traffic presented itself, and the LBSCR closed the section on 1 August 1867. [25] [15] [26]
The activity of the railway settled into ordinary rural transport requirements, coal and cattle feed inward, and agricultural produce and some limited local mineral production out. As Hood says, "The coming of the railway to these districts … did not make any great difference to the development of a profitable railway system... or to the general economy of the area." [27]
In 1902 Christ's Hospital school moved to premises near Stammerham Junction. This together with an expectation that Horsham would expand westwards towards the Junction led the LBSCR to invest £30,000 in building a new station, that was to become Christ's Hospital station. The substantial red brick station reflecting the LBSCR's aspirations for the area was constructed using bricks supplied by the nearby Southwater Brickworks. The station premises were built in very considerable proportions and a local newspaper observed that "Some surprise at the size of the station is however natural considering the part that it will ostensibly serve." [28] Five through tracks were laid which served seven facing platforms. Three platforms were set aside to the Cranleigh line and two other platforms served passengers on the main line. The expansion of residential Horsham into the area did not take place. [29]
The 1955 Modernisation Plan of British Railways led to the introduction of more modern locomotives: chiefly Ivatt Class 2 2-6-2T locomotives built by British Railways after 1948. The coaching stock was also modernised. [30]
Already in the 1930s there had been a decline in use of the line as passengers and traders turned to road transport. The decline was more pronounced still after World War II, and in 1963 the Beeching Report included the line in the list of routes expected to be closed. The line was said to be losing £46,000 annually. Although a public hearing for protests took place, the Minister of Transport gave assent to the closure proposal and the line closed on 14 June 1965. [31]
The trackbed is owned and managed by Surrey and West Sussex County Councils. It is now used as a part of the long-distance public footpath, the Downs Link.
At first the passenger services were four journeys each way daily. Although the trunk freight flows had not materialised, through special passenger excursion trains to south coast resorts were run. [23]
Writing in 1950 Vallance said that the service then was eight trains on weekdays, two on Sundays with an additional train between Guildford and Cranleigh for season ticket holders travelling daily to and from London. During the summer months the line also carried Sunday excursions to the Sussex coastal resorts; these trains had to reverse at Christs Hospital in each direction. In 1950 push and pull trains were the norm. [15]
In February 1957 the BBC filmed significant sections of action at Cranleigh for a television series version of The Railway Children. Shorter snatches were filmed on the line for a number of other films, including The Black Sheep of Whitehall (Will Hay, 1942, Baynards Level Crossing), They Were Sisters (1945, location unknown), Room At The Top (1959, doubtful, see note), The Horse Masters (1961, Baynards), The Grass Is Greener (1960, location unknown), Rotten to the Core (1965, Baynards and Christs Hospital) and The House at the End of the World (1965, location unknown). [note 3] [32] [30]
The West Coastway line is a railway line in England linking the conurbations of Brighton/Hove/Littlehampton and Southampton/Portsmouth, with 1.3 million people between them. It has short southward branches to Littlehampton and Bognor Regis, which offer direct services to and from London.
The Portsmouth Direct line is a railway route between Woking in Surrey and Portsmouth Harbour in Hampshire, England. It forms the principal route for passenger trains between London, Guildford and Portsmouth; connections are made to the ferry services which operate between Portsmouth and the Isle of Wight. The final section of line from Havant to Portsmouth is shared with other passenger routes.
Guildford railway station is at one of three main railway junctions on the Portsmouth Direct Line and serves the town of Guildford in Surrey, England. It is 30 miles 27 chains down the line from London Waterloo via Woking.
The Sutton and Mole Valley lines were constructed between 1847 and 1868 by the London, Brighton and South Coast Railway, the London and South Western Railway and the LBSCR-sponsored Horsham, Dorking and Leatherhead Railway.
Christ's Hospital railway station is near Horsham in West Sussex, England. It is 40 miles 7 chains (64.5 km) down the line from London Bridge via Redhill. It was opened in 1902 by the London, Brighton and South Coast Railway and was intended primarily to serve Christ's Hospital, a large private school which had moved to the area in that year. It now also serves the rural area to the west of Horsham.
Leatherhead railway station is in Leatherhead, Surrey, England. It is managed by Southern, with services provided by them and South Western Railway. It is 18 miles 2 chains (29 km) from London Waterloo.
Slinfold railway station was on the Cranleigh Line and served the village of Slinfold in West Sussex.
The Midhurst Railways were three branch lines which were built to serve the market town of Midhurst in the English county of West Sussex. The three lines were the Petersfield Railway, from Petersfield; the Mid-Sussex Railway extended by the Mid-Sussex and Midhurst Junction Railway, from Hardham Junction (Pulborough); and from Chichester. The Petersfield Railway opened in 1864, the promoting company having been absorbed by the London and South Western Railway (LSWR) in 1863. The Mid-Sussex lines reached Midhurst in 1866, after being absorbed by the London, Brighton and South Coast Railway (LBSCR) in 1862. The two lines did not connect, and there were two separate stations close by one another. The Chichester line took much longer to complete, and was opened in 1881, and a new LBSCR station was opened, replacing the first station. In 1925 the former LSWR line was connected to that station.
Baynards was a railway station on the Cranleigh Line, between Guildford, Surrey and Horsham, West Sussex, England. The station opened with the line on 2 October 1865.
The Steyning Line was a railway branch line that connected the West Sussex market town of Horsham with the port of Shoreham-by-Sea, with connections to Brighton. It was built by the London, Brighton and South Coast Railway, and opened in 1861. It was 20 miles in length. It followed the course of the River Adur for much of its extent and was alternatively known as the Adur Valley Line.
Bramley & Wonersh was a railway station on the Cranleigh Line. It served the villages of Bramley and Wonersh in Surrey.
Cranleigh was a railway station on the Cranleigh Line between Guildford and Horsham. It served the village of Cranleigh, Surrey in southern England.
Rudgwick railway station was on the Cranleigh Line. It served the village of Rudgwick in West Sussex until June, 1965.
The Portsmouth line is a secondary main line originally built by the London, Brighton and South Coast Railway and the London and South Western Railway between 1847 and 1868. It leaves the South London Line at Peckham Rye, with connections to the Victoria branch of the Brighton Main Line at Streatham, and continues via Sutton, Epsom and Dorking to join the Mid-Sussex Line at Horsham.
The Wimbledon and Dorking Railway (W&DR) was an early railway company in southern England. It was independently promoted with the intention of penetrating into West Sussex, but it only succeeded in getting authorisation as far as Epsom. It joined the Epsom and Leatherhead Railway there, and opened in 1859.
The Epsom and Leatherhead Railway (E&LR) was a railway company in Surrey, England. Promoted independently, it opened its short line in 1859 and was worked by the London and South Western Railway (LSWR). It was transferred to the joint ownership of the LSWR and the London, Brighton and South Coast Railway (LBSCR) in 1860. Those companies operated passenger trains to Waterloo and London Bridge station respectively. In 1867 the LBSCR built an extension line from Leatherhead to Dorking, with the declared intention of continuing to the Sussex coast. A new Leatherhead station was built on the new line, and the LSWR was obliged to build its own independent, new Leatherhead station; this was a terminus for some years.
The Horsham, Dorking and Leatherhead Railway (HD&LR) was an early railway company in southern England. It planned to fill in a gap in the network of the London, Brighton and South Coast Railway, shortening the route from London to coastal towns from Littlehampton to Portsmouth. It only obtained Parliamentary authorisation to build from Horsham to Dorking, and it sold its company to the LBSCR, which completed the construction, and itself built the remaining section from Dorking to Leatherhead.
Epsom Town railway station is a closed railway station that served the town of Epsom in Surrey, England. For many years, Epsom had two railway stations, one built by the LSWR in 1859, and this station, built by the LBSCR twelve years earlier. It was located on Upper High Street and is less than ten minutes' walk from the town's other station. It closed in 1929 when the former LSWR station was rebuilt and expanded to four platforms.
The Portsmouth to Brighton Railway was built by the London, Brighton and South Coast Railway and its immediate predecessor in several stages.
The Mid-Sussex railways were a group of English railway companies that together formed what became the Mid-Sussex line, from Three Bridges through Horsham to Littlehampton, in southern England. After 1938 the Southern Railway operated a regular electric train service ran from London to Bognor Regis and Portsmouth using the marketing brand "Mid-Sussex Line", leading to an informal consensus. The Mid-Sussex Railway company ran from Horsham to Petworth, and the Mid-Sussex Junction line of the London, Brighton and South Coast Railway (LBSCR) extended from the Petworth line to Littlehampton. The Three Bridges to Horsham branch of the LBSCR was at first the sole access from the north to the Mid-Sussex railways, although a line from Leatherhead was used later.