Baltimore Belt Line | |||
---|---|---|---|
Overview | |||
Status | Operational | ||
Owner | Baltimore and Ohio Railroad (Original) CSX Transportation (Current) | ||
Locale | Baltimore, Maryland, United States | ||
History | |||
Electrified via overhead rail | 1895 | ||
Electrification removed | 1952 | ||
Technical | |||
Track gauge | 4 ft 8+1⁄2 in (1,435 mm) standard gauge | ||
Electrification | formerly electrified | ||
|
The Baltimore Belt Line was constructed by the Baltimore and Ohio Railroad (B&O) in the early 1890s to connect the railroad's newly constructed line to Philadelphia and New York City/Jersey City with the rest of the railroad at Baltimore, Maryland. It included the Howard Street Tunnel, the Mount Royal Station for B&O's Royal Blue Line passenger trains, and the first mainline railroad electrification in the United States. CSX Transportation currently operates the line as part of its Baltimore Terminal Subdivision.
The B&O's original connection to New York in Baltimore was through surface street transfers to the old Philadelphia, Wilmington and Baltimore Railroad (PW&B), with passenger / freight cars (also known then as rail carriages) pulled by horses along the east–west running East Pratt Street route, first between the B&O's old Pratt Street Depot at Pratt and South Charles Streets, then later using the new terminal and B.& O.'s general headquarters of Camden Street Station (built 1857–1865) to the PW&B's President Street Station (built 1849–1850) at President and Fleet Streets, east of the harbor past the waterfront piers from the early 1830s to early 1870s. This transfer process was also used because of ordinances passed by the Baltimore City Council in 1831 prohibiting the use of early steam locomotives within the city limits on downtown streets in the more primitive years of early American railroading. [2] In 1884, the PW&B was purchased and absorbed by the Pennsylvania Railroad (PRR), the growing dominant regional line in the Northeast states and a major rival of the B&O, and the PRR cut off the connection to the East Coast seaboard's main line. The B&O then proceeded to build its Philadelphia Branch (formally known as the Baltimore and Philadelphia Railroad) to connect to the Philadelphia and Reading Railroad, in turn connecting with the Central Railroad of New Jersey for B&O's New York service across the Hudson River to Manhattan. The combination also provided a connection to the Staten Island Railway, which served as the terminal switching company for the B&O's New York freight service across the Hudson River or Upper New York Bay to Manhattan. New B&O president Charles F. Mayer made the Belt Line a priority by the 1870s, and recruited young railroader Samuel Rea to work on it as Chief Engineer. [3] [4]
Connecting the new Philadelphia Branch to the rest of the B&O system was a considerable engineering challenge. A new surface line across the center of town was politically impossible and prohibitively expensive. Building around the outskirts of town would have required massive regrading and bridging, as the terrain is extremely hilly and the line would cut across every watershed flowing into the harbor. As a temporary expedient, traffic was handled through Baltimore on carfloats across the Patapsco River / Baltimore harbor and port from Canton to Locust Point, but it was clear that a direct connection would have to be built.
The route the B&O chose started from the existing end of the track at Camden Street Station, at the west end of "The Basin" (modern Inner Harbor) of the Northwest Branch of the Patapsco River. A tunnel was constructed directly under Howard Street, heading north–south until just before it crossed the existing PRR line.
At the north portal of the tunnel, Mount Royal was constructed between 1891 and 1896. The track then curved around the northwest corner of the center city going east, passed through six other (much shorter) tunnels, continuing across the northern outskirts of downtown, curving around the Northeast corner of the old City, finally heading southeast to meet the already constructed line just north of the Canton neighborhood and connecting with the East Coast route. The cost of construction drove the Baltimore & Ohio Railroad into bankruptcy shortly after the line opened in 1895, 68 years after the line was founded in 1827 as America's first passenger / freight railroad.
Initially there were plans to build three new stations in Baltimore, but concern for interference with freight haulage and expense eventually reduced this to a single station at Mount Royal Avenue, just west by the Jones Falls stream, which opened on September 1, 1896. Lower-level platforms were added later at the east end of B&O's Camden Street Station in 1897. [2] [5]
The Howard Street Tunnel, originally a 1.4-mile (2.3 km) long tunnel under Howard Street in downtown Baltimore, took four and a half years to build (1890–1895) and was the longest tunnel on the B&O's system. [6] Its construction cost $7 million (equivalent to more than $200 million in 2018) and required 2,400 workers. [7] In the mid-1980s, the tunnel's original length of 1.4 miles or 7,340 feet (2,237 m) was extended an additional three-tenths of a mile (480 m) further south of its original Camden Station portal when the B&O successor CSX Transportation's mainline track east of the Baltimore & Ohio Warehouse at Camden Yards was covered over for construction of Interstate 395. [8] The tunnel is brick-lined with iron-arched centerings. At the time of completion it was considered innovative for its use of electricity for illumination and powering of locomotives. Inside the tunnel, there was an underground platform for trains serving Camden Station. The Howard Street Tunnel is listed on the National Register of Historic Places. [9]
By this time the Pennsylvania Railroad line through Baltimore and points south had been in operation for twenty years. Due to the built-up nature of the area traversed and the hilly terrain, much of its line through town was in tunnels, which posed severe ventilation problems. Large chimneys were constructed above the Pennsylvania line, in a not entirely successful attempt to disperse the fumes from the coal-fired locomotives. However, by 1890 electric locomotion was beginning to appear possible, and in 1892 the B&O thus contracted with General Electric (GE) for electric locomotives, powerhouse equipment, and an electrical distribution system. [5] This equipment was delivered beginning in 1895, and the first train pulled by an electric locomotive operated through the Howard Street Tunnel on June 27, 1895. [10]
The grade on the electrified portion was downhill to Camden Station; therefore traffic heading southbound ("westbound", in B&O timetables), from Mount Royal Station, simply drifted through the tunnels. Since the engine was not working, the smoke produced was relatively light. Going upgrade northbound ("eastbound", in B&O timetables) the electric locomotives were coupled to the front of the train at Camden Station and pulled the entire train, including the steam locomotive, through the Howard Street tunnel. When northbound passenger trains stopped at Mt. Royal Station at the north end of the tunnel, the electric locomotive was uncoupled. Northbound freight trains were pulled by electric locomotives for another two miles, until reaching Huntingdon Avenue in east Baltimore. There the steam locomotive closed its cylinder cocks, took up the load, and the electric locomotive uncoupled on the fly, accelerating ahead to a pocket siding between the tracks. [5]
General Electric installed rotary converters in B&O's powerhouse near Mt. Royal Station, having a combined capacity of 5,000 kW to convert 13,200-volt, 3 phase, 25-cycle AC to 675 volts DC. In 1936, these rotary converters were replaced by mercury arc rectifiers. [11]
Initially power was supplied through a unique system in which a pickup shoe rode in a channel above and to one side of the track. This proved vulnerable to contamination from coal smoke, and after a short time it was replaced by a conventional third rail system. When the Howard Street track was made into a gantlet to allow higher clearances, the pickup contacts on one side were mounted on swinging arms to accommodate the varying distance to the third rail. The electrification was finally discontinued in 1952 when dieselization made it unnecessary. [5]
Throughout much of its history until the end of passenger trains in 1958, the line had relatively low passenger traffic, averaging six daily New York–Washington trains each way. Freight traffic was also limited by the scarcity of online industry east of Baltimore and B&O's lack of a connection across the Potomac River at Washington, D. C., to the southern railroads. The massive Pennsylvania main line carried most traffic to the northeast.
By the 1970s, however, both railroads were failing financially. The PRR had been merged into Penn Central in 1968, and two years later the new company declared bankruptcy. [12] The B&O became part of the Chessie System in 1973, which in turn was merged into CSX in 1980. [13]
In 1976 the PRR line became part of the newly formed Amtrak system. The line was subsequently called the Northeast Corridor (NEC), and its role as a freight line became relatively minor. The 1987 accident at Chase, Maryland, involving a Conrail locomotive led to further reductions in freight traffic on the NEC. The Belt Line (now operated by CSX) is therefore a key link in what has now become the principal rail freight line from Baltimore to Philadelphia and beyond. This segment of the CSX network is considered a chokepoint for freight train service from the Port of Baltimore to East Coast and Midwest markets. [14] See Baltimore Terminal Subdivision.
On July 18, 2001, a 60-car CSXT freight derailed in the Howard Street Tunnel, sparking a fire that burned for six days and blocked traffic for much longer. The Howard Street Tunnel fire called attention to the Belt Line, both as a risk to the surrounding structures and as a link in rail traffic. CSXT has implemented various improvements to increase the integrity of the link, but is limited by the shallow depth of the bore (only three feet or 0.91 meters below the surface at the south end) and the instability of the surrounding soil.
On April 30, 2014, a block-long portion of a retaining wall in a below-grade stretch of the Belt Line in southern Charles Village collapsed after a heavy rainstorm, sending part of East 26th Street and a number of cars onto the tracks. No one was injured but the tracks were blocked by debris, shutting down railroad operations as well as the city block directly above them. [15] On May 2, 2014, freight trains once again began running through the tunnels along this stretch of the Baltimore Belt Line. East 26th Street was reopened to vehicular traffic a year later.
Reconstructing the Howard Street Tunnel to accommodate double-stacked intermodal containers had been once thought to cost $1–3 billion. However, in April 2016, a $425 million plan was revealed that would create the needed 1.5 ft (0.46 m) of additional clearance in the tunnel by trimming and notching its arched ceiling, lowering its floor, and using steel crossties, which have a lower profile than wood crossties. The Maryland Department of Transportation subsequently applied for a $155 million FY2016 FASTLANE grant to help fund a project based on this lower-cost plan, but the grant was not received. In December 2016, MDOT reapplied for a FASTLANE grant of the same amount in the FY2017 round of funding. In addition to the federal funds expected from the grant, the State of Maryland would contribute $145M, and CSX $125M, towards the cost of the project. In expectation of the grant funding, CSX is investing $25M in the tunnel –$21M to improve its water discharge system, and $4M for engineering and design of the clearance improvements. The project, which would also increase the clearance at nine bridges north of the tunnel, would last 4–5 years (due to having to be scheduled around active rail traffic), create about 500 construction jobs, and would result in 178,000 containers per year being moved by rail from the Port of Baltimore instead of by truck. Maryland Governor Larry Hogan said that the state would explore other funding solutions if the FY2017 FASTLANE grant is not received. [16] [17] [18] [19] [20] On July 22, 2019, U.S. Transportation Secretary Elaine Chao announced the award of $125 million in federal infrastructure funding for the project. [21]
The Baltimore and Ohio Railroad was the first common carrier railroad and the oldest railroad in the United States with its first section opening in 1830. Merchants from Baltimore, which had benefited to some extent from the construction of the National Road early in the century, wanted to do business with settlers crossing the Appalachian Mountains. The railroad faced competition from several existing and proposed enterprises, including the Albany-Schenectady Turnpike, built in 1797, the Erie Canal, which opened in 1825, and the Chesapeake and Ohio Canal.
The Pennsylvania Railroad, legal name The Pennsylvania Railroad Company, also known as the "Pennsy", was an American Class I railroad that was established in 1846 and headquartered in Philadelphia. It was named for the commonwealth in which it was established. At its peak in 1882, the Pennsylvania Railroad was the largest railroad, the largest transportation enterprise, and the largest corporation in the world.
MARC is a commuter rail system in the Washington–Baltimore area. MARC is administered by the Maryland Transit Administration (MTA) and operated under contract by Alstom and Amtrak on track owned by CSX Transportation (CSXT) and Amtrak. In 2022, the system had a ridership of 2,815,900, or about 12,500 per weekday as of the second quarter of 2023, less than pre-COVID-19 pandemic weekday ridership of 40,000.
The Howard Street Tunnel fire was a 60-car CSX Transportation freight train derailment that occurred in the Howard Street Tunnel, a freight through-route tunnel under Howard Street in Baltimore, Maryland, on July 18, 2001. The derailment sparked a chemical fire that raged for five or six days and virtually shut down the downtown area. In the evening of the first day, a water main ruptured causing significant flooding in the streets above. The accident disrupted Northeast Corridor rail service. It also slowed Internet service in the US for several hours due to the destruction of a cable passing through the tunnel.
The Western Maryland Railway was an American Class I railroad (1852–1983) that operated in Maryland, West Virginia, and Pennsylvania. It was primarily a coal hauling and freight railroad, with a small passenger train operation.
The Baltimore and Potomac Railroad (B&P) operated from Baltimore, Maryland, southwest to Washington, D.C., from 1872 to 1902. Controlled by the Pennsylvania Railroad, it was the second railroad company to connect the nation's capital to the Northeastern States, and competed with the older Baltimore & Ohio Railroad.
The Philadelphia, Wilmington and Baltimore Railroad (PW&B) was an American railroad that operated independently from 1836 to 1881. Headquartered in Philadelphia, it was greatly enlarged in 1838 by the merger of four state-chartered railroads in three Mid-Atlantic states to create a single line between Philadelphia and Baltimore.
The Baltimore and Philadelphia Railroad was a railroad line built by the Baltimore and Ohio Railroad (B&O) from Philadelphia, Pennsylvania, to the Maryland-Delaware state line, where it connected with the B&O's Philadelphia Branch to reach Baltimore, Maryland. It was built in the 1880s after the B&O lost access to its previous route to Philadelphia, the Philadelphia, Wilmington and Baltimore Railroad (PW&B). The cost of building the new route, especially the Howard Street Tunnel on the connecting Baltimore Belt Line, led to the B&O's first bankruptcy. Today, the line is used by CSX Transportation for freight trains.
The Northern Central Railway (NCRY) was a Class I Railroad in the United States connecting Baltimore, Maryland, with Sunbury, Pennsylvania, along the Susquehanna River. Completed in 1858, the line came under the control of the Pennsylvania Railroad (PRR) in 1861, when the PRR acquired a controlling interest in the Northern Central's stock to compete with the rival Baltimore and Ohio Railroad (B&O).
Railroad electrification in the United States began at the turn of the 20th century and comprised many different systems in many different geographical areas, few of which were connected. Despite this situation, these systems shared a small number of common reasons for electrification.
Transportation in Pittsburgh, Pennsylvania is different than in many other major American cities. A large metropolitan area that is surrounded by rivers and hills, Pittsburgh has an infrastructure system that has been built out over the years to include roads, tunnels, bridges, railroads, inclines, bike paths, and stairways; however, the hills and rivers still form many barriers to transportation within the city.
The Frederick Branch is a railroad line in Frederick County, Maryland. It was built by the Baltimore and Ohio Railroad (B&O) in 1831, and is now owned by the Maryland Department of Transportation (MDOT). The 3.4 mi (5.5 km) branch extends between Frederick Junction – a wye with the Old Main Line Subdivision of CSX Transportation on the west side of the Monocacy River – and its terminus at East Street in downtown Frederick, Maryland. The wye at Frederick Junction was the first example of its kind in the United States and is still in use today.
The Baltimore & Annapolis Railroad was an American railroad of central Maryland built in the 19th century. The railroad, the second to serve Annapolis, ran between Annapolis and Clifford along the north shore of the Severn River. From Clifford, just north of the present day Patapsco Light Rail Stop, it connected with the B&O's Curtis Bay branch so that trains could travel to Baltimore. In 1921, when it was called the Annapolis and Baltimore Short Line, it was purchased by the larger Washington, Baltimore and Annapolis Electric Railway (WB&A), and then emerged from the WB&A's 1935 bankruptcy and closure as the Baltimore & Annapolis Railroad. B&A electric passenger operation between the two cities continued until 1950, at which time the rail line became solely a freight carrier, operating buses for passenger service. Freight service to Annapolis continued until June 1968 when the Severn River Trestle was declared unsafe. In the 1980s, the line was completely shut down. The right-of-way now serves as part of Baltimore's light rail system and as the Baltimore & Annapolis Trail.
The CSX Cumberland Subdivision is a railroad line owned and operated by CSX Transportation in the U.S. states of Maryland and West Virginia. The line runs from Brunswick, Maryland, west to Cumberland, Maryland, along the old Baltimore and Ohio Rail Road (B&O) main line. At its east end, the Cumberland Subdivision becomes the Metropolitan Subdivision; at its west end at Cumberland, Maryland it becomes the Cumberland Terminal Subdivision. It meets the Shenandoah Subdivision at Harpers Ferry, West Virginia, and the Lurgan Subdivision in Cherry Run, West Virginia.
The Pope's Creek Subdivision is a CSX Transportation railroad line in Maryland, running from Bowie to Morgantown where the Morgantown Generating Station is located and the Chalk Point Generating Station.
Camden Station, now also referred to as Camden Street Station, Camden Yards, and formally as the Transportation Center at Camden Yards, is a train station at the intersection of South Howard and West Camden Streets in Baltimore, Maryland, adjacent to Oriole Park at Camden Yards, behind the B&O Warehouse. It is served by MARC commuter rail service and local Light Rail trains.
The Royal Blue was the Baltimore and Ohio Railroad (B&O)'s flagship passenger train between New York City and Washington, D.C., in the United States, beginning in 1890. The Baltimore-based B&O also used the name between 1890 and 1917 for its improved passenger service between New York and Washington, collectively dubbed the Royal Blue Line. Using variants such as the Royal Limited and Royal Special for individual Royal Blue trains, the B&O operated the service in partnership with the Reading Railroad and the Central Railroad of New Jersey. Principal intermediate cities served were Philadelphia, Wilmington, and Baltimore. Later, as Europe reeled from the carnage of World War I and connotations of European royalty fell into disfavor, the B&O discreetly omitted the sobriquet Royal Blue Line from its New York passenger service and the Royal Blue disappeared from B&O timetables. Beginning in 1917, former Royal Blue Line trains were renamed: the Royal Limited, for example, became the National Limited, continuing west from Washington to St. Louis via Cincinnati. During the Depression, the B&O hearkened back to the halcyon pre-World War I era when it launched a re-christened Royal Blue train between New York and Washington in 1935. The B&O finally discontinued all passenger service north of Baltimore on April 26, 1958, including the Royal Blue.
The Baltimore and Potomac Tunnel is a double-tracked, masonry arch railroad tunnel on the Northeast Corridor in Baltimore, Maryland, just south of Pennsylvania Station. Opened in 1873, the tunnel is used by about 140 Amtrak and MARC passenger trains and two freight trains every day, as of 2008.
The Landover Subdivision is a railroad line owned and operated by CSX Transportation. It runs from the Anacostia section of Washington, D.C., to Landover, Maryland, serving as a freight train bypass of Washington Union Station.
The Baltimore Terminal Subdivision is a railroad line owned and operated by CSX Transportation in the U.S. state of Maryland. The line runs from Baltimore to Halethorpe along the original Baltimore and Ohio Railroad (B&O) line, one of the oldest rail lines in the United States and the first passenger railroad line. At its east (north) end, it connects with the Philadelphia Subdivision; its west (south) end has a junction with the Capital Subdivision and the Old Main Line Subdivision.
{{cite book}}
: CS1 maint: multiple names: authors list (link)