- power equipment
- overhaul
- maintenance
- system account
- plan
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 58
- 238000004590 computer program Methods 0.000 title claims abstract description 27
- 238000012423 maintenance Methods 0.000 claims abstract description 371
- 238000012216 screening Methods 0.000 claims description 8
- 230000008569 process Effects 0.000 abstract description 8
- 230000006870 function Effects 0.000 description 9
- 238000007726 management method Methods 0.000 description 9
- 238000007689 inspection Methods 0.000 description 6
- 238000010586 diagram Methods 0.000 description 5
- 238000012986 modification Methods 0.000 description 5
- 230000004048 modification Effects 0.000 description 5
- 230000008859 change Effects 0.000 description 4
- 238000012545 processing Methods 0.000 description 4
- 238000004891 communication Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- 238000004458 analytical method Methods 0.000 description 2
- 238000013473 artificial intelligence Methods 0.000 description 2
- 230000004044 response Effects 0.000 description 2
- 230000003068 static effect Effects 0.000 description 2
- OKTJSMMVPCPJKN-UHFFFAOYSA-N Carbon Chemical compound [C] OKTJSMMVPCPJKN-UHFFFAOYSA-N 0.000 description 1
- 238000004364 calculation method Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000012217 deletion Methods 0.000 description 1
- 230000037430 deletion Effects 0.000 description 1
- 229910021389 graphene Inorganic materials 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The application relates to a method, a system, a computer device, a computer readable storage medium and a computer program product for generating an overhaul plan of an electric power device, and relates to the technical field of electric power. The method comprises the following steps: determining a plurality of power equipment maintenance projects and a maintenance period of each power equipment maintenance project based on the power equipment maintenance criterion information; determining a power equipment maintenance project corresponding to each system account according to the authority information of each system account, generating a power equipment maintenance plan of each system account, and issuing the power equipment maintenance plan of each system account to each system account; when the maintenance attribute information of any one of the power equipment maintenance projects in the power equipment maintenance schedule of any one of the system accounts is changed, the power equipment maintenance schedule of the system account is updated. By adopting the method, the complexity of the process of making the overhaul plan can be reduced.
Description
Technical Field
The present application relates to the field of power technology, and in particular, to a method, a system, a computer device, a computer readable storage medium and a computer program product for generating a power equipment maintenance plan.
Background
The power system is composed of various power equipment, and the fault of one power equipment can affect the whole operation of the power system, so that the power equipment needs to be overhauled to ensure the stable operation of the power system.
In the related art, a maintenance plan of the power equipment is usually manually formulated. However, the power equipment composing the power system is numerous, and the maintenance schedule of the power equipment under different types and different working environments is also different, so that the complexity of the process of making the maintenance schedule is high.
Disclosure of Invention
Based on this, it is necessary to provide a power equipment maintenance schedule generation method, system, computer device, computer-readable storage medium, and computer program product capable of reducing the complexity of the maintenance schedule creation process, in order to solve the technical problem of the complexity of the maintenance schedule creation process.
In a first aspect, the present application provides a method for generating a power equipment maintenance plan, which is applied to a power equipment maintenance plan generating system, where a plurality of system accounts exist under the power equipment maintenance plan generating system, and the method includes:
Determining a plurality of power equipment maintenance projects and maintenance periods of each power equipment maintenance project based on the power equipment maintenance criterion information stored by the power equipment maintenance plan generation system; each electric power equipment maintenance project corresponds to one electric power equipment to be overhauled;
Determining at least one power equipment maintenance item corresponding to each system account in the plurality of power equipment maintenance items according to authority information of each system account under the power equipment maintenance plan generation system, generating a power equipment maintenance plan of each system account based on the at least one power equipment maintenance item corresponding to each system account and a maintenance period of the at least one power equipment maintenance item, and issuing the power equipment maintenance plan of each system account to each system account; the power equipment overhaul plan of each system account at least comprises overhaul attribute information of at least one power equipment overhaul project and at least one power equipment overhaul project corresponding to the system account;
and updating the power equipment overhaul plan of the system account under the condition that overhaul attribute information of any one power equipment overhaul project in the power equipment overhaul plan of any one system account is changed.
In one embodiment, the service attribute information for each power equipment service item includes at least the service period, historical service time, and projected service time for the power equipment service item;
The updating the power equipment maintenance schedule of the system account under the condition that the maintenance attribute information of any one of the power equipment maintenance projects in the power equipment maintenance schedule of any one of the system accounts is changed comprises the following steps:
Determining a new estimated overhaul time of each power equipment overhaul project in the power equipment overhaul plan of each system account according to the updated historical overhaul time of the power equipment overhaul project and the overhaul period of the power equipment overhaul project under the condition that the historical overhaul time of the power equipment overhaul project changes;
And updating the predicted overhaul time of the power equipment overhaul plan into the new predicted overhaul time to finish updating the power equipment overhaul plan.
In one embodiment, the overhaul attribute information of each electric power equipment overhaul project at least further comprises an overhaul state of the electric power equipment overhaul project, wherein the overhaul state is used for representing overhaul conditions of the electric power equipment overhaul project before corresponding expected overhaul time;
the method further comprises the steps of:
For each power equipment maintenance project in a power equipment maintenance plan of each system account, keeping a maintenance state of the power equipment maintenance unexpired when the current moment is not later than the expected maintenance time of the power equipment maintenance project;
And under the condition that the current time is later than the predicted overhaul time, updating the overhaul state of the electric power equipment overhaul to be out of date.
In one embodiment, the method further comprises:
under the condition that an unexpired overhaul project query request initiated by any one system account is received, screening out the unexpired overhaul project from all the unexpired overhaul projects of the power equipment overhaul plan of the system account, wherein the corresponding overhaul state is the unexpired overhaul project;
And transmitting the screened power equipment overhaul project and overhaul attribute information of the screened power equipment overhaul project to the system account.
In one embodiment, the method further comprises:
Under the condition that an over-period overhaul project query request initiated by any one system account is received, screening out the corresponding overhaul state as the over-period overhaul project from all the electric equipment overhaul projects of the electric equipment overhaul plan of the system account;
And transmitting the screened power equipment overhaul project and overhaul attribute information of the screened power equipment overhaul project to the system account.
In one embodiment, the method further comprises:
Under the condition that a power equipment overhaul criterion file uploaded by a system account with criterion information updating authority is received, updating the power equipment overhaul criterion information based on the power equipment overhaul criterion file to obtain new power equipment overhaul criterion information;
And updating the power equipment maintenance plan of each system account based on the new power equipment maintenance criterion information.
In a second aspect, the present application also provides a power equipment maintenance plan generating system, where there are a plurality of system accounts under the power equipment maintenance plan generating system, including:
The maintenance project determining module is used for determining a plurality of power equipment maintenance projects and maintenance periods of each power equipment maintenance project based on the power equipment maintenance criterion information stored by the power equipment maintenance plan generating system; each electric power equipment maintenance project corresponds to one electric power equipment to be overhauled;
The maintenance plan generation module is used for determining at least one power equipment maintenance item corresponding to each system account in the plurality of power equipment maintenance items according to authority information of each system account under the power equipment maintenance plan generation system, generating a power equipment maintenance plan of each system account based on the at least one power equipment maintenance item corresponding to each system account and a maintenance period of the at least one power equipment maintenance item, and issuing the power equipment maintenance plan of each system account to each system account; the power equipment overhaul plan of each system account at least comprises overhaul attribute information of at least one power equipment overhaul project and at least one power equipment overhaul project corresponding to the system account;
and the overhaul plan updating module is used for updating the electric equipment overhaul plan of any one of the system accounts under the condition that the overhaul attribute information of any one of the electric equipment overhaul projects in the electric equipment overhaul plan of any one of the system accounts is changed.
In a third aspect, the present application also provides a computer device comprising a memory and a processor, the memory storing a computer program, the processor implementing the following steps when executing the computer program:
determining a plurality of power equipment maintenance projects and maintenance periods of each power equipment maintenance project based on the power equipment maintenance criterion information stored by the power equipment maintenance plan generation system; each electric power equipment maintenance project corresponds to one electric power equipment to be overhauled; a plurality of system accounts are arranged under the power equipment overhaul plan generation system;
Determining at least one power equipment maintenance item corresponding to each system account in the plurality of power equipment maintenance items according to authority information of each system account under the power equipment maintenance plan generation system, generating a power equipment maintenance plan of each system account based on the at least one power equipment maintenance item corresponding to each system account and a maintenance period of the at least one power equipment maintenance item, and issuing the power equipment maintenance plan of each system account to each system account; the power equipment overhaul plan of each system account at least comprises overhaul attribute information of at least one power equipment overhaul project and at least one power equipment overhaul project corresponding to the system account;
and updating the power equipment overhaul plan of the system account under the condition that overhaul attribute information of any one power equipment overhaul project in the power equipment overhaul plan of any one system account is changed.
In a fourth aspect, the present application also provides a computer readable storage medium having stored thereon a computer program which when executed by a processor performs the steps of:
determining a plurality of power equipment maintenance projects and maintenance periods of each power equipment maintenance project based on the power equipment maintenance criterion information stored by the power equipment maintenance plan generation system; each electric power equipment maintenance project corresponds to one electric power equipment to be overhauled; a plurality of system accounts are arranged under the power equipment overhaul plan generation system;
Determining at least one power equipment maintenance item corresponding to each system account in the plurality of power equipment maintenance items according to authority information of each system account under the power equipment maintenance plan generation system, generating a power equipment maintenance plan of each system account based on the at least one power equipment maintenance item corresponding to each system account and a maintenance period of the at least one power equipment maintenance item, and issuing the power equipment maintenance plan of each system account to each system account; the power equipment overhaul plan of each system account at least comprises overhaul attribute information of at least one power equipment overhaul project and at least one power equipment overhaul project corresponding to the system account;
and updating the power equipment overhaul plan of the system account under the condition that overhaul attribute information of any one power equipment overhaul project in the power equipment overhaul plan of any one system account is changed.
In a fifth aspect, the application also provides a computer program product comprising a computer program which, when executed by a processor, performs the steps of:
determining a plurality of power equipment maintenance projects and maintenance periods of each power equipment maintenance project based on the power equipment maintenance criterion information stored by the power equipment maintenance plan generation system; each electric power equipment maintenance project corresponds to one electric power equipment to be overhauled; a plurality of system accounts are arranged under the power equipment overhaul plan generation system;
Determining at least one power equipment maintenance item corresponding to each system account in the plurality of power equipment maintenance items according to authority information of each system account under the power equipment maintenance plan generation system, generating a power equipment maintenance plan of each system account based on the at least one power equipment maintenance item corresponding to each system account and a maintenance period of the at least one power equipment maintenance item, and issuing the power equipment maintenance plan of each system account to each system account; the power equipment overhaul plan of each system account at least comprises overhaul attribute information of at least one power equipment overhaul project and at least one power equipment overhaul project corresponding to the system account;
and updating the power equipment overhaul plan of the system account under the condition that overhaul attribute information of any one power equipment overhaul project in the power equipment overhaul plan of any one system account is changed.
The above-described power equipment overhaul plan generation method, system, computer device, computer-readable storage medium, and computer program product, first determining a plurality of power equipment overhaul projects and an overhaul period of each power equipment overhaul project based on power equipment overhaul criterion information stored by the power equipment overhaul plan generation system; each electric power equipment maintenance project corresponds to one electric power equipment to be overhauled; then, according to authority information of each system account under the power equipment overhaul plan generation system, determining at least one power equipment overhaul project corresponding to each system account in a plurality of power equipment overhaul projects, generating a power equipment overhaul plan of each system account based on at least one power equipment overhaul project corresponding to each system account and an overhaul period of at least one power equipment overhaul project, and issuing the power equipment overhaul plan of each system account to each system account; the power equipment overhaul plan of each system account at least comprises at least one power equipment overhaul project corresponding to the system account and overhaul attribute information of the at least one power equipment overhaul project; and updating the power equipment overhaul plan of the system account under the condition that overhaul attribute information of any one power equipment overhaul project in the power equipment overhaul plan of any one system account is changed. In this way, the power equipment maintenance plan system generates the power equipment maintenance criterion information and the authority information of each system account stored by the system, so that a power equipment maintenance plan corresponding to each corresponding power equipment maintenance project can be generated for each system account under the power equipment maintenance plan system, and the corresponding power equipment maintenance plan can be automatically updated under the condition that the maintenance attribute information of any one power equipment maintenance project is sent to change; the power equipment maintenance plan generating method based on the process can realize automatic generation and automatic updating of the power equipment maintenance plan, and further reduces the complexity of the maintenance plan making process.
Drawings
In order to more clearly illustrate the embodiments of the present application or the technical solutions in the related art, the drawings that are needed in the description of the embodiments of the present application or the related technologies will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present application, and other related drawings may be obtained according to these drawings without inventive effort to those of ordinary skill in the art.
FIG. 1 is a flow diagram of a method of generating a power equipment overhaul plan in one embodiment;
FIG. 2 is a flow chart of steps for updating a power equipment overhaul plan of a system account in the event that overhaul attribute information of any one of the power equipment overhaul items in the power equipment overhaul plan of any one of the system accounts is changed, in one embodiment;
FIG. 3 is a flow chart of steps for updating an overhaul state of an electrical equipment overhaul project in one embodiment;
FIG. 4 is a flowchart illustrating steps for issuing unexpired power equipment service items and service attribute information thereof to a system account in one embodiment;
FIG. 5 is a schematic diagram of a viewing interface for a power equipment overhaul plan provided by a power equipment overhaul plan generation system in one embodiment;
FIG. 6 is a flowchart illustrating a step of issuing an over-period power equipment maintenance project and maintenance attribute information thereof to a system account according to an embodiment;
FIG. 7 is a flowchart illustrating steps for updating guidelines information for compliance of a power equipment maintenance plan generation system in one embodiment;
FIG. 8 is a block diagram of a power equipment overhaul plan generation system in one embodiment;
Fig. 9 is an internal structural diagram of a computer device in one embodiment.
Detailed Description
The present application will be described in further detail with reference to the drawings and examples, in order to make the objects, technical solutions and advantages of the present application more apparent. It should be understood that the specific embodiments described herein are for purposes of illustration only and are not intended to limit the scope of the application.
It should be noted that, the user information (including but not limited to user equipment information, user personal information, etc.) and the data (including but not limited to data for analysis, stored data, presented data, etc.) related to the present application are both information and data authorized by the user or sufficiently authorized by each party, and the collection, use and processing of the related data are required to meet the related regulations.
In one embodiment, as shown in fig. 1, a method for generating a power equipment maintenance plan is provided, and this embodiment is exemplified by applying the method to a power equipment maintenance plan system, where it can be understood that the power equipment maintenance plan system is mounted on a server and has corresponding application programs on each terminal, and a user uses the power equipment maintenance plan system through the application programs on each terminal. The server can be an independent physical server, a server cluster or a distributed system formed by a plurality of physical servers, or a cloud server for providing cloud computing service; the terminal may be, but is not limited to, various personal computers, notebook computers, smart phones, tablet computers, etc. In this embodiment, the method includes the steps of:
Step S102, determining a plurality of power equipment maintenance projects and a maintenance cycle of each power equipment maintenance project based on the power equipment maintenance criterion information stored in the power equipment maintenance plan generation system.
Wherein, a plurality of system accounts are arranged under the power equipment overhaul plan generation system; each system account corresponds to a user role, such as individual users, team users, department users, etc.
Wherein the power equipment overhaul criterion information stored by the power equipment overhaul plan generating system prescribes compliance criteria for the power equipment overhaul plan generating system to generate the power equipment overhaul plan; based on the electrical equipment overhaul criterion information, the electrical equipment overhaul plan generation system can determine which electrical equipment needs to be overhauled, which projects need to be overhauled for the electrical equipment, and which overhaul period to carry out overhaul.
Wherein, each electric equipment maintenance project corresponds to an electric equipment to be overhauled; further, one electrical device to be serviced may correspond to a plurality of electrical device service items, e.g., one or more components to be serviced of one electrical device to be serviced correspond to one electrical device service item.
The power equipment overhaul plan generating system stores power equipment overhaul criterion information which is required to be complied with by power equipment overhaul, and the power equipment overhaul criterion information can be files, rules and the like.
Wherein, the maintenance period is the interval time between two maintenance.
Specifically, the system determines, for each power device in the power system, a plurality of power device service items that need to be performed, and a service period for each power device service item, according to power device service compliance power device service criterion information.
Step S104, determining at least one power equipment maintenance project corresponding to each system account in a plurality of power equipment maintenance projects according to the authority information of each system account under the power equipment maintenance project generation system, generating the power equipment maintenance project of each system account based on the respective maintenance periods of the at least one power equipment maintenance project and the at least one power equipment maintenance project corresponding to each system account, and issuing the power equipment maintenance project of each system account to each system account.
The authority information is used for representing the management authority of the corresponding system account, and the authority information of the system account under the system is determined according to the user role corresponding to the system account; in practical application, the management authority of the system accounts corresponding to the individual users is limited to the system accounts of the individual users, the management authority of the system accounts corresponding to the team users comprises all the system accounts corresponding to the individual users under the corresponding team, and the management authority of the system accounts corresponding to the department users comprises all the system accounts corresponding to the team users and all the system accounts corresponding to the individual users under the corresponding department.
The power equipment overhaul plan of each system account at least comprises overhaul attribute information of at least one corresponding power equipment overhaul project and at least one corresponding power equipment overhaul project of the system account.
Wherein the service attribute information is used to characterize service conditions of the power equipment service project, such as service period, historical service time, predicted service time, service status and compliance criterion information for characterizing whether service is performed before the corresponding predicted service time, etc.
Specifically, the system determines at least one electric equipment maintenance item which a user of the system account should take charge of in a plurality of electric equipment maintenance items according to authority information of the system account, and generates a corresponding electric equipment maintenance schedule based on the at least one electric equipment maintenance item and a maintenance period of the at least one electric equipment maintenance item, wherein the schedule comprises the at least one electric equipment maintenance item and various maintenance attribute information of the at least one electric equipment maintenance item, and the schedule is used for representing the electric equipment maintenance schedule of the system account; the system then issues the power equipment service schedule to the system account, where a user of the system account may view the power equipment service schedule.
The power equipment overhaul schedule is shown in table 1.
Table 1 power equipment service schedule
In practical application, the system generates corresponding power equipment maintenance plans for system accounts with different authority information according to the fact that the corresponding authority information is from small to large; for example, the system first determines and generates a power equipment overhaul project corresponding to the system account of the individual user, and then, for each system account corresponding to the team user, the system generates a power equipment overhaul plan corresponding to the system account of the team user according to the power equipment overhaul plan of each system account corresponding to the individual user under the team corresponding thereto; next, the system generates, for each system account corresponding to the department user, a power equipment service plan corresponding to the system account of the department user from the power equipment service plan corresponding to the system account of the team user under its corresponding department.
Step S106, when the maintenance attribute information of any one of the power equipment maintenance projects in the power equipment maintenance schedule of any one of the system accounts is changed, updating the power equipment maintenance schedule of the system account.
Specifically, after the user of the system account overhauls the power equipment, overhauling attribute information of a corresponding power equipment overhauling project, such as historical overhauling time, can be modified in a power equipment overhauling schedule of the system account; when the system detects that the overhaul attribute information of any one of the power equipment overhaul projects in the power equipment overhaul plan of any one of the system accounts is changed, the power equipment overhaul plan of the system account is updated, for example, the corresponding estimated overhaul time is updated.
In practical application, when updating the power equipment maintenance schedule of the system account, the system only updates the power equipment maintenance project with the corresponding maintenance attribute information changed in the power equipment maintenance schedule.
Further, since there may be an inclusion relationship between the power equipment maintenance plans of the system accounts of different user roles, for example, the power equipment maintenance plan of the system account corresponding to the team user is composed of the power equipment maintenance plans of the system account corresponding to the individual user, when updating the power equipment maintenance plan of a certain system account, the system also adaptively updates other power equipment maintenance plans associated with the power equipment maintenance plan; for example, when updating a power equipment maintenance schedule corresponding to a system account of an individual user, it is also necessary to update a power equipment maintenance schedule corresponding to a system account of a team user to which the individual user belongs and a power equipment maintenance schedule corresponding to a system account of a department user to which the individual user belongs.
In the above power equipment overhaul plan generation method, the system first determines a plurality of power equipment overhaul projects and an overhaul period of each power equipment overhaul project based on the power equipment overhaul criterion information stored in the power equipment overhaul plan generation system; each electric power equipment maintenance project corresponds to one electric power equipment to be overhauled; then, according to authority information of each system account under the power equipment overhaul plan generation system, determining at least one power equipment overhaul project corresponding to each system account in a plurality of power equipment overhaul projects, generating a power equipment overhaul plan of each system account based on at least one power equipment overhaul project corresponding to each system account and an overhaul period of at least one power equipment overhaul project, and issuing the power equipment overhaul plan of each system account to each system account; the power equipment overhaul plan of each system account at least comprises at least one power equipment overhaul project corresponding to the system account and overhaul attribute information of the at least one power equipment overhaul project; and updating the power equipment overhaul plan of the system account under the condition that overhaul attribute information of any one power equipment overhaul project in the power equipment overhaul plan of any one system account is changed. In this way, the system can generate a power equipment maintenance plan corresponding to each corresponding power equipment maintenance project for each system account under the power equipment maintenance planning system through the stored power equipment maintenance criterion information and the authority information of each system account, and can automatically update the corresponding power equipment maintenance plan under the condition that the maintenance attribute information of any one power equipment maintenance project is sent to change; the power equipment maintenance plan generating method based on the process can realize automatic generation and automatic updating of the power equipment maintenance plan, and further reduces the complexity of the maintenance plan making process.
In one exemplary embodiment, referring to table 1, the service attribute information of each power equipment service item includes at least a service period, a historical service time, and an expected service time of the power equipment service item.
As shown in fig. 2, in step S106, when the maintenance attribute information of any one of the power equipment maintenance items in the power equipment maintenance plan of any one of the system accounts is changed, the power equipment maintenance plan of the system account is updated, and specifically, the method includes the steps of:
Step S202, for each power equipment maintenance item in the power equipment maintenance schedule of each system account, determining a new predicted maintenance time of the power equipment maintenance item according to the updated historical maintenance time of the power equipment maintenance item and the maintenance period of the power equipment maintenance item when the historical maintenance time of the power equipment maintenance item changes.
Step S204, updating the predicted maintenance time of the power equipment maintenance plan to a new predicted maintenance time to finish updating the power equipment maintenance plan.
Specifically, after a user of the system account performs a certain power equipment maintenance project on the power equipment, the historical maintenance time of the power equipment maintenance project can be modified in the power equipment maintenance plan of the system account based on the maintenance time; the system detects that the historical overhaul time of any one of the power equipment overhaul projects in the power equipment overhaul plan of any one system account is changed, and the estimated overhaul time of the power equipment overhaul project is redetermined based on the updated historical overhaul time and the overhaul period of the power equipment overhaul project and is updated in the power equipment overhaul plan, so that the updating of the power equipment overhaul plan is realized.
In this embodiment, the system can automatically update the corresponding predicted maintenance time by automatically updating the corresponding predicted maintenance time under the condition of updating the historical maintenance time.
In an exemplary embodiment, the system allows a user to add or delete a power equipment maintenance project under a system account through the system account, and in the case that a project modification request initiated by the user through the system account is received, adds or deletes a corresponding power equipment maintenance project in a power equipment maintenance plan corresponding to the system account, thereby realizing updating of the power equipment maintenance plan.
In one exemplary embodiment, the system further allows a user to manually modify other overhaul attribute information of the power equipment overhaul project under the system account through the system account, and correspondingly updates the other overhaul attribute information of the power equipment overhaul project based on the modified overhaul attribute information when the user is detected to modify through the system account, thereby realizing updating of the power equipment overhaul plan.
In one exemplary embodiment, referring to table 1, the service attribute information of each power equipment service item further includes at least a service status of the power equipment service item, the service status being used to characterize a service condition of the power equipment service item prior to a corresponding projected service time, such as whether the service is performed prior to the corresponding projected service time.
As shown in fig. 3, the method for generating a power equipment maintenance plan provided by the application further includes the following steps for updating the maintenance state of a power equipment maintenance project:
step S302, for each power equipment maintenance item in the power equipment maintenance schedule of each system account, if the current time is not later than the estimated maintenance time of the power equipment maintenance item, maintaining the maintenance status of the power equipment maintenance as not expired.
And step S304, updating the overhauling state of the overhauling of the power equipment to be out-of-date under the condition that the current moment is later than the expected overhauling time.
Specifically, for each power equipment maintenance item in the power equipment maintenance schedule of each system account, the system always keeps the maintenance state of the power equipment maintenance unexpired when the current moment is earlier than or is in the expected maintenance time of the power equipment maintenance item, and updates the maintenance state of the power equipment maintenance unexpired when the current moment is detected to be later than the expected maintenance time of the power equipment maintenance item.
For example, referring to table 1, assuming that the current time is 2010-05-09, the system always keeps the overhaul state corresponding to the wire check of device a and the wire check of device B unexpired, and updates the overhaul state corresponding to the test start of device a to be exceeded.
In this embodiment, the comparison between the current time and the expected maintenance time of the system can update the maintenance state of the maintenance equipment of the power equipment in time, so that the user can check and grasp the maintenance state of each maintenance item of the power equipment in time at any time.
In an exemplary embodiment, as shown in fig. 4, the power equipment overhaul plan generating method provided by the present application further includes the following steps for issuing unexpired power equipment overhaul items and overhaul attribute information thereof to a system account:
In step S402, when an unexpired maintenance item query request initiated by any one of the system accounts is received, a corresponding maintenance item whose maintenance status is unexpired is screened from the power equipment maintenance items of the power equipment maintenance plan of the system account.
And step S404, issuing the screened power equipment overhaul project and overhaul attribute information of the screened power equipment overhaul project to a system account.
Specifically, when a user of a system account needs to inquire a list comprising each unexpired power equipment overhaul item corresponding to the system account, an unexpired overhaul item inquiry request can be initiated to the system through the system account; after receiving the unexpired maintenance item inquiry request, the system takes the corresponding maintenance state as unexpired as a screening condition, screens out the unexpired maintenance items of the corresponding maintenance state from the power equipment maintenance items included in the power equipment maintenance plan of the system account, and issues the power equipment maintenance items and the maintenance attribute information thereof to the system account so that a user can check and timely master the unexpired power equipment maintenance items under the corresponding system account at any time.
In practical application, referring to fig. 5, the system provides a viewing interface for the power equipment maintenance plan, and each system account can view the corresponding power equipment maintenance plan through the viewing interface; the checking interface is provided with an overhaul state input control and a query control, the overhaul state input control is an input box or a drop-down selection box, so that a user can conveniently input an overhaul state to be used as a query condition, after clicking the query control, the system can screen by taking the overhaul state in the overhaul state input control as the query condition, and the screening result is displayed in real time through the checking interface.
Further, an export control is further arranged on the viewing interface, after the user clicks the export control, the system generates a list of all the electric equipment maintenance items and maintenance attribute information thereof currently displayed on the viewing interface, and the list is issued to the system account, so that the user can send the list to other users or view the list locally.
In this embodiment, the system provides a function of inquiring according to the overhaul states, so that a user can view and grasp the overhaul items of the electric power equipment in each overhaul state at any time.
In an exemplary embodiment, as shown in fig. 6, the method for generating a power equipment maintenance plan provided by the present application further includes the following steps for issuing an over-period power equipment maintenance project and maintenance attribute information thereof to a system account:
In step S602, when an over-period maintenance item query request initiated by any one of the system accounts is received, the corresponding over-period maintenance item is screened out from the power equipment maintenance items of the power equipment maintenance plan of the system account.
Step S604, the screened power equipment overhaul project and overhaul attribute information of the screened power equipment overhaul project are issued to a system account.
Specifically, when a user of a system account needs to inquire a list comprising all corresponding over-run power equipment overhaul items under the system account, an over-run overhaul item inquiry request can be initiated to the system through the system account; after receiving the over-period maintenance project query request, the system takes the corresponding maintenance state as the over-period as a screening condition, screens out the corresponding maintenance state as the over-period maintenance project of each power equipment from the power equipment maintenance projects included in the power equipment maintenance plan of the system account, and issues the power equipment maintenance projects and the maintenance attribute information thereof to the system account so that users can check and timely master unexpired power equipment maintenance projects under the corresponding system account at any time.
In this embodiment, the system provides a function of inquiring according to the overhaul states, so that a user can view and grasp the overhaul items of the electric power equipment in each overhaul state at any time.
In an exemplary embodiment, referring to fig. 5, a viewing interface of the system is further provided with an estimated maintenance time input control, where the estimated maintenance time input control is an input box or a drop-down selection box, so that a user can conveniently input a time or a time interval to be used as a query condition, after clicking the query control, the system screens with the time or the time interval in the estimated maintenance time input control as the query condition, screens a power equipment maintenance plan and maintenance attribute information thereof, where the corresponding estimated maintenance time accords with the time or the time interval in the estimated maintenance time input control, and the screening result is displayed in real time through the viewing interface.
In an exemplary embodiment, as shown in fig. 7, the power equipment maintenance plan generating method provided by the present application further includes the following steps for updating the criterion information of compliance of the power equipment maintenance plan generating system:
In step S702, in the case of receiving the power equipment overhaul criterion file uploaded by the system account with the criterion information updating authority, the power equipment overhaul criterion information is updated based on the power equipment overhaul criterion file, so as to obtain new power equipment overhaul criterion information.
Step S704, updating the power equipment maintenance plan of each system account based on the new power equipment maintenance criterion information.
The system allows a user to update stored power equipment maintenance criterion information, and assigns criterion information updating authority for a system account corresponding to the allowed user.
Specifically, when the user needs to update the rule information compliant by the power equipment maintenance plan generating system, uploading or importing a new power equipment maintenance rule file to the power equipment maintenance plan generating system through a system account with rule information updating authority; the power equipment overhaul plan generating system updates the power equipment overhaul criterion information according to the uploaded or imported new power equipment overhaul criterion file to obtain new power equipment overhaul criterion information, and updates the power equipment overhaul plan of each system account based on the new power equipment overhaul criterion information.
For example, when the power equipment service criterion information is a plurality of power equipment service criterion files, the system may add a new power equipment service criterion file thereto, or may replace one or more of the original power equipment service criterion files with the new power equipment service criterion file.
In this embodiment, the system updates the compliance criteria generated by the power equipment maintenance schedule by updating the power equipment maintenance criteria information, so that the power equipment maintenance schedule can be generated more efficiently and accurately.
In an exemplary embodiment, the system also allows a user to modify the power equipment service criterion information, such as deleting a certain power equipment service criterion file therein, through a system account.
In an exemplary embodiment, the operating rights of the system accounts of different rights information (role users) are different, for example, the system account corresponding to the individual user only allows viewing and deriving the power equipment overhaul plan, the system account corresponding to the team user allows modification of part of the information of the power equipment overhaul plan, for example, modification of historical overhaul time, the system account corresponding to the department user allows modification of all the information of the power equipment overhaul plan, for example, allows addition and deletion of the power equipment overhaul project, and the system account corresponding to the individual user and the system account corresponding to the team user below can be subjected to account management.
In an exemplary embodiment, the system issues a power equipment overhaul plan corresponding to the month and the year for each system account according to the month and the year, so as to prompt a user corresponding to the system account to overhaul the power equipment overhaul project in the month and the year.
In order to more clearly clarify the power equipment maintenance schedule generation method provided by the embodiment of the present application, a specific embodiment will be described below specifically, but it should be understood that the embodiment of the present application is not limited thereto. In one exemplary embodiment, the application further provides a power equipment maintenance platform, which specifically has the following functions:
1. And (5) an overhaul plan analysis and statistics function.
According to the maintenance compliance standard accessed by the power equipment maintenance platform, the function comprehensively analyzes the operation and maintenance states of the power equipment by combining the maintenance conditions of the power equipment, and divides the maintenance states of the power equipment into three conditions of unexpired, unfinished and out-of-date through time calculation. Wherein, the unexpired is that the power equipment does not reach the maintenance time; the project is not completed in the same year, but not completed in an expiration month; the expiration time is the completion time that has exceeded the current year.
2. Hierarchical management functions.
In order to facilitate management of the overhaul plan, users of the platform are classified into three types of role users: personal users, team users, department users. Users with different roles have different rights, so that three-level management of staff, teams and departments is realized.
The personal user has the functions of checking equipment overhaul information, exporting reports and managing relevant personal information.
The team user needs to input the monthly fixed inspection time and the monthly fixed inspection condition of the electric power equipment managed by the team into the system so as to analyze and calculate the maintenance plan of the electric power equipment and the like through the platform. The role user has the authority of the personal user and the authority of modifying the equipment maintenance information, including the equipment checking time and the work order number.
The department users have the following rights besides the rights of the team users:
managing system users, including newly added users, editing user information, viewing users and deleting users;
Managing unit information of a power plant, including modifying the whole name and short name of the power plant, and importing and exporting equipment inspection information of a certain power plant;
Setting the updatable time of equipment checking information;
all attribute items of a certain piece of equipment inspection information can be edited, and the equipment inspection information can be added or deleted.
3. And a report output function.
The power equipment maintenance platform has the function of generating a maintenance schedule management table and a maintenance equipment information statistical table. A convenient channel is provided for an overhaul planner to check and manage equipment inspection information.
In the embodiment, the information management of the overhaul plan is realized by utilizing a modern advanced data processing technology, and the equipment overhaul information is released by utilizing the electric equipment overhaul platform, so that convenience is provided for an overhaul worker to inquire about the overhaul state of the electric equipment; the method overcomes the defects of the traditional management method and has the advantages of high response speed, low error rate and the like; the department overhaul information hierarchical management is realized, and users with various roles divide the work details, so that the lean management level is effectively improved; and outputting a response overhaul information report according to the use requirement.
It should be understood that, although the steps in the flowcharts related to the embodiments described above are sequentially shown as indicated by arrows, these steps are not necessarily sequentially performed in the order indicated by the arrows. The steps are not strictly limited to the order of execution unless explicitly recited herein, and the steps may be executed in other orders. Moreover, at least some of the steps in the flowcharts described in the above embodiments may include a plurality of steps or a plurality of stages, which are not necessarily performed at the same time but may be performed at different times, and the order of the execution of the steps or stages is not necessarily sequential, but may be performed in turn or alternately with at least some of the other steps or stages.
Based on the same inventive concept, the embodiment of the application also provides a power equipment maintenance plan generating system for realizing the power equipment maintenance plan generating method. The implementation of the solution to the problem provided by the system is similar to the implementation described in the above method, so the specific limitations in the embodiments of the power equipment maintenance plan generating system or systems provided below may be referred to the limitations of the power equipment maintenance plan generating method hereinabove, and will not be repeated herein.
In one exemplary embodiment, as shown in fig. 8, there is provided a power equipment overhaul plan generation system, comprising: a service project determination module 802, a service plan generation module 804, and a service plan update module 806, wherein:
A maintenance item determining module 802, configured to determine a plurality of power equipment maintenance items and a maintenance period of each power equipment maintenance item based on the power equipment maintenance criterion information stored in the power equipment maintenance plan generating system; each power equipment overhaul project corresponds to one power equipment to be overhauled.
The overhaul plan generating module 804 is configured to determine, from among a plurality of power equipment overhaul items, at least one power equipment overhaul item corresponding to each system account according to authority information of each system account under the power equipment overhaul plan generating system, generate a power equipment overhaul plan of each system account based on the at least one power equipment overhaul item corresponding to each system account and an overhaul period of the at least one power equipment overhaul item, and issue the power equipment overhaul plan of each system account to each system account; the power equipment overhaul plan of each system account at least comprises at least one power equipment overhaul project corresponding to the system account and overhaul attribute information of the at least one power equipment overhaul project.
And a maintenance schedule updating module 806, configured to update the power equipment maintenance schedule of the system account when the maintenance attribute information of any one of the power equipment maintenance projects in the power equipment maintenance schedule of any one of the system accounts changes.
In an exemplary embodiment, the service attribute information for each power equipment service item includes at least a service period, a historical service time, and an expected service time for the power equipment service item.
The maintenance schedule updating module 806 is further configured to determine, for each power equipment maintenance item in the power equipment maintenance schedule of each system account, a new estimated maintenance time of the power equipment maintenance item according to the updated historical maintenance time of the power equipment maintenance item and the maintenance period of the power equipment maintenance item when the historical maintenance time of the power equipment maintenance item changes; and updating the predicted overhaul time of the power equipment overhaul plan to a new predicted overhaul time to finish updating the power equipment overhaul plan.
In an exemplary embodiment, the service attribute information for each power equipment service item further includes at least a service status of the power equipment service item, the service status being used to characterize a service condition of the power equipment service item prior to a corresponding projected service time.
The overhaul plan updating module 806 is further configured to, for each power equipment overhaul project in the power equipment overhaul plan of each system account, keep the overhaul state of the power equipment overhaul unexpired if the current moment is not later than the estimated overhaul time of the power equipment overhaul project; and under the condition that the current moment is later than the expected overhaul time, updating the overhaul state of the electric power equipment overhaul to be out of date.
In an exemplary embodiment, the power equipment overhaul plan generating system further includes a query deriving module, configured to, when receiving an unexpired overhaul item query request initiated by any one of the system accounts, screen out a corresponding overhaul state as an unexpired power equipment overhaul item from each power equipment overhaul item of the power equipment overhaul plan of the system account; and transmitting the screened power equipment overhaul project and overhaul attribute information of the screened power equipment overhaul project to a system account.
In an exemplary embodiment, the query deriving module is further configured to, when receiving an over-period overhaul item query request initiated by any one of the system accounts, screen out, from each power equipment overhaul item of the power equipment overhaul plan of the system account, a power equipment overhaul item whose corresponding overhaul state is over-period; and transmitting the screened power equipment overhaul project and overhaul attribute information of the screened power equipment overhaul project to a system account.
In an exemplary embodiment, the power equipment overhaul plan generating system further comprises a compliance criterion updating module, configured to, in a case where a power equipment overhaul criterion file uploaded by a system account with a criterion information updating authority is received, update power equipment overhaul criterion information based on the power equipment overhaul criterion file, and obtain new power equipment overhaul criterion information; and updating the power equipment overhaul plan of each system account based on the new power equipment overhaul criterion information.
The various modules in the above-described power plant overhaul plan generation system may be implemented in whole or in part by software, hardware, and combinations thereof. The above modules may be embedded in hardware or may be independent of a processor in the computer device, or may be stored in software in a memory in the computer device, so that the processor may call and execute operations corresponding to the above modules.
In one exemplary embodiment, a computer device is provided, which may be a server, the internal structure of which may be as shown in fig. 9. The computer device includes a processor, a memory, an Input/Output interface (I/O) and a communication interface. The processor, the memory and the input/output interface are connected through a system bus, and the communication interface is connected to the system bus through the input/output interface. Wherein the processor of the computer device is configured to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, computer programs, and a database. The internal memory provides an environment for the operation of the operating system and computer programs in the non-volatile storage media. The database of the computer device is used for storing maintenance planning data of the electric power equipment. The input/output interface of the computer device is used to exchange information between the processor and the external device. The communication interface of the computer device is used for communicating with an external terminal through a network connection. The computer program, when executed by a processor, implements a method of generating a power equipment overhaul plan.
It will be appreciated by persons skilled in the art that the architecture shown in fig. 9 is merely a block diagram of some of the architecture relevant to the present inventive arrangements and is not limiting as to the computer device to which the present inventive arrangements are applicable, and that a particular computer device may include more or fewer components than shown, or may combine some of the components, or have a different arrangement of components.
In an exemplary embodiment, a computer device is also provided, comprising a memory and a processor, the memory having stored therein a computer program, the processor implementing the steps of the method embodiments described above when the computer program is executed.
In one exemplary embodiment, a computer-readable storage medium is provided, on which a computer program is stored which, when being executed by a processor, carries out the steps of the method embodiments described above.
In an exemplary embodiment, a computer program product is provided, comprising a computer program which, when executed by a processor, implements the steps of the method embodiments described above.
Those skilled in the art will appreciate that implementing all or part of the above described methods may be accomplished by way of a computer program stored on a non-transitory computer readable storage medium, which when executed, may comprise the steps of the embodiments of the methods described above. Any reference to memory, database, or other medium used in embodiments provided herein may include at least one of non-volatile memory and volatile memory. The nonvolatile Memory may include Read-Only Memory (ROM), magnetic tape, floppy disk, flash Memory, optical Memory, high density embedded nonvolatile Memory, resistive random access Memory (RESISTIVE RANDOM ACCESS MEMORY, reRAM), magneto-resistive Memory (Magnetoresistive Random Access Memory, MRAM), ferroelectric Memory (Ferroelectric Random Access Memory, FRAM), phase change Memory (PHASE CHANGE Memory, PCM), graphene Memory, and the like. Volatile memory can include random access memory (Random Access Memory, RAM) or external cache memory, and the like. By way of illustration, and not limitation, RAM can be in various forms such as static random access memory (Static Random Access Memory, SRAM) or dynamic random access memory (Dynamic Random Access Memory, DRAM), etc. The databases referred to in the embodiments provided herein may include at least one of a relational database and a non-relational database. The non-relational database may include, but is not limited to, a blockchain-based distributed database, and the like. The processor referred to in the embodiments provided in the present application may be a general-purpose processor, a central processing unit, a graphics processor, a digital signal processor, a programmable logic unit, a data processing logic unit based on quantum computation, an artificial intelligence (ARTIFICIAL INTELLIGENCE, AI) processor, or the like, but is not limited thereto.
The technical features of the above embodiments may be arbitrarily combined, and all possible combinations of the technical features in the above embodiments are not described for brevity of description, however, as long as there is no contradiction between the combinations of the technical features, they should be considered as the scope of the present application.
The foregoing examples illustrate only a few embodiments of the application and are described in detail herein without thereby limiting the scope of the application. It should be noted that it will be apparent to those skilled in the art that several variations and modifications can be made without departing from the spirit of the application, which are all within the scope of the application. Accordingly, the scope of the application should be assessed as that of the appended claims.
Claims (10)
1. A power equipment maintenance plan generation method, applied to a power equipment maintenance plan generation system under which a plurality of system accounts are present, the method comprising:
Determining a plurality of power equipment maintenance projects and maintenance periods of each power equipment maintenance project based on the power equipment maintenance criterion information stored by the power equipment maintenance plan generation system; each electric power equipment maintenance project corresponds to one electric power equipment to be overhauled;
Determining at least one power equipment maintenance item corresponding to each system account in the plurality of power equipment maintenance items according to authority information of each system account under the power equipment maintenance plan generation system, generating a power equipment maintenance plan of each system account based on the at least one power equipment maintenance item corresponding to each system account and a maintenance period of the at least one power equipment maintenance item, and issuing the power equipment maintenance plan of each system account to each system account; the power equipment overhaul plan of each system account at least comprises overhaul attribute information of at least one power equipment overhaul project and at least one power equipment overhaul project corresponding to the system account;
and updating the power equipment overhaul plan of the system account under the condition that overhaul attribute information of any one power equipment overhaul project in the power equipment overhaul plan of any one system account is changed.
2. The method of claim 1, wherein the service attribute information for each power equipment service item includes at least the service period, a historical service time, and an expected service time for the power equipment service item;
The updating the power equipment maintenance schedule of the system account under the condition that the maintenance attribute information of any one of the power equipment maintenance projects in the power equipment maintenance schedule of any one of the system accounts is changed comprises the following steps:
Determining a new estimated overhaul time of each power equipment overhaul project in the power equipment overhaul plan of each system account according to the updated historical overhaul time of the power equipment overhaul project and the overhaul period of the power equipment overhaul project under the condition that the historical overhaul time of the power equipment overhaul project changes;
And updating the predicted overhaul time of the power equipment overhaul plan into the new predicted overhaul time to finish updating the power equipment overhaul plan.
3. The method of claim 2, wherein the service attribute information for each power equipment service item further comprises at least a service status of the power equipment service item, the service status being used to characterize a service condition of the power equipment service item prior to a corresponding projected service time;
the method further comprises the steps of:
For each power equipment maintenance project in a power equipment maintenance plan of each system account, keeping a maintenance state of the power equipment maintenance unexpired when the current moment is not later than the expected maintenance time of the power equipment maintenance project;
And under the condition that the current time is later than the predicted overhaul time, updating the overhaul state of the electric power equipment overhaul to be out of date.
4. A method according to claim 3, characterized in that the method further comprises:
under the condition that an unexpired overhaul project query request initiated by any one system account is received, screening out the unexpired overhaul project from all the unexpired overhaul projects of the power equipment overhaul plan of the system account, wherein the corresponding overhaul state is the unexpired overhaul project;
And transmitting the screened power equipment overhaul project and overhaul attribute information of the screened power equipment overhaul project to the system account.
5. A method according to claim 3, characterized in that the method further comprises:
Under the condition that an over-period overhaul project query request initiated by any one system account is received, screening out the corresponding overhaul state as the over-period overhaul project from all the electric equipment overhaul projects of the electric equipment overhaul plan of the system account;
And transmitting the screened power equipment overhaul project and overhaul attribute information of the screened power equipment overhaul project to the system account.
6. The method according to any one of claims 1 to 5, further comprising:
Under the condition that a power equipment overhaul criterion file uploaded by a system account with criterion information updating authority is received, updating the power equipment overhaul criterion information based on the power equipment overhaul criterion file to obtain new power equipment overhaul criterion information;
And updating the power equipment maintenance plan of each system account based on the new power equipment maintenance criterion information.
7. A power equipment overhaul plan generation system, wherein there are a plurality of system accounts under the power equipment overhaul plan generation system, the system comprising:
The maintenance project determining module is used for determining a plurality of power equipment maintenance projects and maintenance periods of each power equipment maintenance project based on the power equipment maintenance criterion information stored by the power equipment maintenance plan generating system; each electric power equipment maintenance project corresponds to one electric power equipment to be overhauled;
The maintenance plan generation module is used for determining at least one power equipment maintenance item corresponding to each system account in the plurality of power equipment maintenance items according to authority information of each system account under the power equipment maintenance plan generation system, generating a power equipment maintenance plan of each system account based on the at least one power equipment maintenance item corresponding to each system account and a maintenance period of the at least one power equipment maintenance item, and issuing the power equipment maintenance plan of each system account to each system account; the power equipment overhaul plan of each system account at least comprises overhaul attribute information of at least one power equipment overhaul project and at least one power equipment overhaul project corresponding to the system account;
and the overhaul plan updating module is used for updating the electric equipment overhaul plan of any one of the system accounts under the condition that the overhaul attribute information of any one of the electric equipment overhaul projects in the electric equipment overhaul plan of any one of the system accounts is changed.
8. A computer device comprising a memory and a processor, the memory storing a computer program, characterized in that the processor implements the steps of the method of any of claims 1 to 6 when the computer program is executed.
9. A computer readable storage medium, on which a computer program is stored, characterized in that the computer program, when being executed by a processor, implements the steps of the method of any of claims 1 to 6.
10. A computer program product comprising a computer program, characterized in that the computer program, when being executed by a processor, implements the steps of the method of any of claims 1 to 6.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202410955238.3A CN118710253A (en) | 2024-07-17 | 2024-07-17 | Power plant overhaul plan generation method, system, computer device, computer readable storage medium, and computer program product |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202410955238.3A CN118710253A (en) | 2024-07-17 | 2024-07-17 | Power plant overhaul plan generation method, system, computer device, computer readable storage medium, and computer program product |
Publications (1)
Publication Number | Publication Date |
---|---|
CN118710253A true CN118710253A (en) | 2024-09-27 |
Family
ID=92818150
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202410955238.3A Pending CN118710253A (en) | 2024-07-17 | 2024-07-17 | Power plant overhaul plan generation method, system, computer device, computer readable storage medium, and computer program product |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN118710253A (en) |
-
2024
- 2024-07-17 CN CN202410955238.3A patent/CN118710253A/en active Pending
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109446104A (en) | A kind of testing case management and device based on big data | |
CN115934680B (en) | One-stop big data analysis processing system | |
CN112801607A (en) | Management service platform and construction method | |
CN109800278A (en) | Data assets map application method, device, computer equipment and storage medium | |
CN111897866A (en) | Remote sensing monitoring pattern spot docking system and using method thereof | |
CN106651092A (en) | Configurable data change flow monitoring method | |
CN114218218A (en) | Data processing method, device and equipment based on data warehouse and storage medium | |
CN106780157B (en) | Ceph-based power grid multi-temporal model storage and management system and method | |
CN115730900A (en) | Project data processing method and device, computer equipment and storage medium | |
CN118710253A (en) | Power plant overhaul plan generation method, system, computer device, computer readable storage medium, and computer program product | |
CN115543428A (en) | Simulated data generation method and device based on strategy template | |
CN115658047A (en) | Method, device, equipment and storage medium for acquiring total carbon emission | |
CN118172122B (en) | Warehouse consumption value determining method, device, equipment, medium and program product | |
CN114676675B (en) | Data processing method, device, computer equipment and storage medium | |
CN117785939A (en) | Data analysis method and device based on rule engine and computer equipment | |
CN116738960B (en) | Document data processing method, system, computer equipment and storage medium | |
CN116880927A (en) | Rule management method, device, computer equipment and storage medium | |
CN118519719A (en) | Resource processing method, apparatus, computer device, readable storage medium, and program product | |
CN117314383A (en) | Man-hour management system | |
CN117194542A (en) | Objectified data management method based on heterogeneous storage technology | |
CN117742924A (en) | Intelligent station energy management and control system task generation method, device and equipment | |
CN116561074A (en) | Method, device, computer equipment and storage medium for grouping resource data | |
CN114048273A (en) | Data warehouse engine | |
CN116842107A (en) | Real-time data warehouse construction method, device, equipment and storage medium | |
Zhang et al. | Design of Enterprise Economic Dynamic Management System Based on Spark Technology |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |