CN110442626A - Seismic data junction method and device - Google Patents
Seismic data junction method and device Download PDFInfo
- Publication number
- CN110442626A CN110442626A CN201910565772.2A CN201910565772A CN110442626A CN 110442626 A CN110442626 A CN 110442626A CN 201910565772 A CN201910565772 A CN 201910565772A CN 110442626 A CN110442626 A CN 110442626A
- Authority
- CN
- China
- Prior art keywords
- data
- seismic
- acquisition
- performance data
- item
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 65
- 238000003860 storage Methods 0.000 claims description 34
- 238000012544 monitoring process Methods 0.000 claims description 32
- 230000015654 memory Effects 0.000 claims description 26
- 238000004519 manufacturing process Methods 0.000 claims description 19
- 238000004590 computer program Methods 0.000 claims description 13
- 238000012545 processing Methods 0.000 claims description 12
- 230000005540 biological transmission Effects 0.000 claims description 9
- 235000013399 edible fruits Nutrition 0.000 claims description 9
- 238000013500 data storage Methods 0.000 claims description 8
- 210000000352 storage cell Anatomy 0.000 claims description 8
- 238000004364 calculation method Methods 0.000 claims description 2
- 230000006698 induction Effects 0.000 description 14
- 230000008569 process Effects 0.000 description 9
- 238000010586 diagram Methods 0.000 description 7
- 230000006870 function Effects 0.000 description 5
- 241001269238 Data Species 0.000 description 4
- 230000000694 effects Effects 0.000 description 4
- 230000001052 transient effect Effects 0.000 description 4
- 230000008859 change Effects 0.000 description 3
- 238000004891 communication Methods 0.000 description 3
- 238000010276 construction Methods 0.000 description 3
- 238000013480 data collection Methods 0.000 description 3
- 230000008901 benefit Effects 0.000 description 2
- 238000005259 measurement Methods 0.000 description 2
- 238000010606 normalization Methods 0.000 description 2
- 238000000547 structure data Methods 0.000 description 2
- 238000013461 design Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 230000014759 maintenance of location Effects 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 238000003908 quality control method Methods 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 238000003325 tomography Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/25—Integrating or interfacing systems involving database management systems
- G06F16/252—Integrating or interfacing systems involving database management systems between a Database Management System and a front-end application
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/25—Integrating or interfacing systems involving database management systems
- G06F16/258—Data format conversion from or to a database
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/10—Services
- G06Q50/26—Government or public services
Landscapes
- Engineering & Computer Science (AREA)
- Databases & Information Systems (AREA)
- Theoretical Computer Science (AREA)
- Business, Economics & Management (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Tourism & Hospitality (AREA)
- Data Mining & Analysis (AREA)
- General Engineering & Computer Science (AREA)
- General Health & Medical Sciences (AREA)
- Educational Administration (AREA)
- Health & Medical Sciences (AREA)
- Economics (AREA)
- Development Economics (AREA)
- Human Resources & Organizations (AREA)
- Marketing (AREA)
- Primary Health Care (AREA)
- Strategic Management (AREA)
- General Business, Economics & Management (AREA)
- Geophysics And Detection Of Objects (AREA)
Abstract
The invention discloses a kind of seismic data junction method and device, which includes: according to preset multiple performance data types and the corresponding data acquisition item acquisition seismic data of each performance data type;Corresponding performance data applying unit is sent by the seismic data according to performance data type needed for each performance data applying unit in preset multiple performance data applying units and/or data acquisition item.The present invention solve the prior art difference physical prospecting work unit generation seismic prospecting performance data format it is lack of standardization cause data application unit be difficult to effectively using acquisition performance data the technical issues of.
Description
Technical field
The present invention relates to earthquake monitoring fields, in particular to a kind of seismic data junction method and device.
Background technique
The junction of seismic prospecting performance data is also in space state at present.Different physical prospecting work units in actual production
The performance data type disunity of generation, data format are lack of standardization, and the data source between different data application unit is caused not united
One, each data application unit is difficult to effectively utilize the performance data of acquisition after data filing.
The present invention proposes a kind of seismic data junction method and dress to solve at least one above-mentioned technical problem
It sets.
Summary of the invention
The main purpose of the present invention is to provide a kind of seismic data junction method and devices, to solve the prior art
The seismic prospecting performance data format that different physical prospecting work units generate is lack of standardization to cause data application unit to be difficult to effective benefit
The technical issues of with the performance data of acquisition.
To achieve the goals above, according to an aspect of the invention, there is provided a kind of seismic data junction method,
This method comprises:
Earthquake is acquired according to preset multiple performance data types and the corresponding data acquisition item of each performance data type
Performance data;
According to performance data type needed for each performance data applying unit in preset multiple performance data applying units
And/or the seismic data is sent corresponding performance data applying unit by data acquisition item.
Optionally, this method further include:
According to the production procedure of the seismic monitoring project of history and seismic data determine the performance data type with
And the data acquire item.
Optionally, this method further include:
The seismic data is stored according to the performance data type and/or data acquisition item;
It is described to send corresponding performance data applying unit for the seismic data, it specifically includes:
Corresponding performance data applying unit is sent by the seismic data of storage.
Optionally, the performance data type include: acquisition class performance data, processing class performance data and explain class at
Fruit data;The data acquisition item includes: structure data entry item and unstructured data acquisition item.
Optionally, described to be acquired according to preset multiple performance data types and the corresponding data of each performance data type
Item acquisition seismic data, comprising:
Obtain the corresponding acquisition data of each data acquisition item and data acquisition specification;
The corresponding Seismic number of each data acquisition item is acquired according to the acquisition data and data acquisition specification
According to.
To achieve the goals above, according to another aspect of the present invention, a kind of seismic data junction dress is provided
It sets, which includes:
Seismic data acquisition unit, for according to preset multiple performance data types and each performance data type
Corresponding data acquisition item acquires seismic data;
Data transmission unit, for according to performance data applying unit institute each in preset multiple performance data applying units
The seismic data is sent corresponding performance data application list by performance data type and/or data the acquisition item needed
Member.
Optionally, the device further include:
Data standard establishes unit, for true according to the production procedure of the seismic monitoring project of history and seismic data
The fixed performance data type and the data acquire item.
Optionally, the device further include:
Data storage cell, for acquiring item to the Seismic number according to the performance data type and/or data
According to being stored;
The data transmission unit, be also used to from the data storage cell obtain seismic data, and by earthquake at
Fruit data are sent to corresponding performance data applying unit.
Optionally, the performance data type include: acquisition class performance data, processing class performance data and explain class at
Fruit data;The data acquisition item includes: structure data entry item and unstructured data acquisition item.
Optionally, the seismic data acquisition unit, comprising:
Specification determining module is acquired, for obtaining the corresponding acquisition data of each data acquisition item and data acquisition specification;
Data acquisition module, for acquiring each data according to the acquisition data and data acquisition specification and acquiring item
Corresponding seismic data.
To achieve the goals above, according to another aspect of the present invention, a kind of computer equipment, including storage are additionally provided
Device, processor and storage on a memory and the computer program that can run on a processor, the processor execution meter
The step in above-mentioned seismic data junction method is realized when calculation machine program.
To achieve the goals above, according to another aspect of the present invention, a kind of computer readable storage medium is additionally provided,
The computer-readable recording medium storage has computer program, real when the computer program executes in the computer processor
Step in existing above-mentioned seismic data junction method.
The invention has the benefit that production procedure and Monitoring Result of the present invention by the seismic monitoring project to history
Data carry out induction and conclusion, and seismic monitoring performance data is divided into different performance data type and data acquire item, into
Item is acquired according to each data of each performance data type when row performance data acquires and carries out data acquisition, ensure that each physical prospecting is made
The seismic prospecting performance data that industry unit generates has unified format.And then according to the data need of each performance data application unit
Different seismic prospecting performance datas is sent to corresponding performance data application unit, each data application unit is enable to have
The performance data using acquisition of effect.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below
There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is the present invention
Some embodiments for those of ordinary skill in the art without creative efforts, can also basis
These attached drawings obtain other attached drawings.In the accompanying drawings:
Fig. 1 is the flow chart of seismic data junction method of the embodiment of the present invention;
Fig. 2 is the flow chart that the embodiment of the present invention carries out data acquisition according to performance data type and data acquisition item;
Fig. 3 is the flow chart that the embodiment of the present invention sends seismic data to corresponding data application unit;
Fig. 4 is the flow chart of seismic data of embodiment of the present invention acquisition;
Fig. 5 is the first structure block diagram of seismic data junction device of the embodiment of the present invention;
Fig. 6 is the second structural block diagram of seismic data junction device of the embodiment of the present invention;
Fig. 7 is the third structural block diagram of seismic data junction device of the embodiment of the present invention;
Fig. 8 is seismic data acquisition unit of embodiment of the present invention composition structure chart;
Fig. 9 is computer equipment schematic diagram of the embodiment of the present invention.
Specific embodiment
In order to enable those skilled in the art to better understand the solution of the present invention, below in conjunction in the embodiment of the present invention
Attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is only
The embodiment of a part of the invention, instead of all the embodiments.Based on the embodiments of the present invention, ordinary skill people
The model that the present invention protects all should belong in member's every other embodiment obtained without making creative work
It encloses.
It should be understood by those skilled in the art that, the embodiment of the present invention can provide as method, system or computer program
Product.Therefore, complete hardware embodiment, complete software embodiment or reality combining software and hardware aspects can be used in the present invention
Apply the form of example.Moreover, it wherein includes the computer of computer usable program code that the present invention, which can be used in one or more,
The computer program implemented in usable storage medium (including but not limited to magnetic disk storage, CD-ROM, optical memory etc.) produces
The form of product.
It should be noted that term " includes " and " tool in description and claims of this specification and above-mentioned attached drawing
Have " and their any deformation, it is intended that cover it is non-exclusive include, for example, containing a series of steps or units
Process, method, system, product or equipment those of are not necessarily limited to be clearly listed step or unit, but may include without clear
Other step or units listing to Chu or intrinsic for these process, methods, product or equipment.
It should be noted that in the absence of conflict, the feature in embodiment and embodiment in the present invention can phase
Mutually combination.The present invention will be described in detail below with reference to the accompanying drawings and embodiments.
Fig. 1 is the flow chart of seismic data junction method of the embodiment of the present invention, as shown in Figure 1, the ground of the present embodiment
Shaking performance data junction method includes step S101 to step S102.
Step S101 acquires item according to preset multiple performance data types and the corresponding data of each performance data type
Acquire seismic data.
Step S102, according to achievement needed for each performance data applying unit in preset multiple performance data applying units
Data class and/or data acquire item and send corresponding performance data applying unit for the seismic data.
The present invention carries out induction and conclusion by the production procedure of the seismic monitoring project to history and Monitoring Result data, will
Seismic data, which is divided into three classes, to be respectively as follows: acquisition class performance data, processing class performance data and explains class performance data.Into
And go out multiple corresponding data acquisition items for each performance data type induction and conclusion.Carrying out seismic data acquisition
Time-division safety pin carries out seismic data acquisition to each data acquisition item of all performance data types, has data acquisition
Unified specification ensure that the integrality of acquisition data class.
In an embodiment of the present invention, data acquisition item includes: the data acquisition item and non-structured number of structuring
According to acquisition item.The data acquisition item of each structuring include it is multiple have incidence relation and to the relevant acquisition number of data acquisition item
According to these acquisition data are that the data of the structuring acquire the corresponding data to be collected of item.Structuring in embodiments of the present invention
Data acquisition item include: zero/non-zero well constraint inversion survey line attribute, survey line tables of data, survey line measurement coordinates table, acquisition basic data
Deng.For acquiring basic data, being corresponding with includes: well-name, well north coordinate, well east coordinate, observation originates well depth, observation terminates
22 acquisition data such as well depth, instrument model.In embodiments of the present invention, the data acquisition item of each structuring and each structure
The corresponding acquisition data of data acquisition item of change are all production procedure and Monitoring Result by the seismic monitoring project to history
Data carry out what induction and conclusion obtained, to guarantee the comprehensive and integrality of seismic monitoring performance data acquisition.
In an embodiment of the present invention, non-structured data acquisition item is usually some documents in seismic monitoring project
Class data and at fruit data etc., non-structured data acquisition item does not include with certain structure, relevant adopt
Collect data.In an embodiment of the present invention, non-structured data acquisition item may include: document class data according to data type
It acquires item, acquire item at fruit data and text class data acquisition item.Document class data acquisition item may include: acquisition report
It accuses, acquisition multimedia, processing explanation is reported, multimedia etc. is explained in processing.At fruit data acquisition item may include: measurement at
Fruit, processing interpretation results etc..Text class data acquisition item may include: take out road table, class's report, well data, when depth relation table, speed
Table etc..Each non-structured data acquisition item is also production procedure and the Monitoring Result number by the seismic monitoring project to history
According to carrying out what induction and conclusion obtained, guarantee that data caused by production links can be acquired completely.
In an embodiment of the present invention, the data acquisition item for acquiring the structuring of class performance data may include: physical prospecting work
Area's attribute two dimension, three-dimensional properties table, earthquake construction two, three dimensional design attribute list, survey line tables of data acquire base data table, survey
Line measures coordinates table etc..The non-structured data acquisition item for acquiring class performance data may include: SPS file, surface structure
Survey data etc..
In an embodiment of the present invention, the data acquisition item for handling the structuring of class performance data may include: two-dimentional place
Manage record sheet, three-dimensional process record sheet etc..The non-structured data acquisition item for handling class performance data may include: offset numbers
According to body, pickup file etc..
In an embodiment of the present invention, the data acquisition item for explaining the structuring of class performance data may include: to be construed to
Fruit base data table etc..The non-structured data acquisition item for explaining class performance data may include: layer position file, tomography text
Part, attribute volume etc..
In embodiments of the present invention, the Seismic number that performance data application unit is needed according to its respective function difference
According to also different.The present invention carries out induction and conclusion by the production procedure of the seismic monitoring project to history and Monitoring Result data,
Seismic data is divided into three performance data types, so go out for each performance data type induction and conclusion it is multiple right
The data acquisition item answered.Performance data application unit is corresponding according to the performance data type summed up and each performance data type
Data acquisition item determine itself need seismic data, in alternative embodiment of the invention, a performance data is answered
The seismic data that certain data acquisition items can be needed with unit, can also need some performance data type allly
Performance data is shaken, multiple data of multiple performance data types can also be needed to acquire the seismic data of item.The present invention
Different seismic datas is sent out according to performance data type needed for each performance data application unit and/or data acquisition item
It is sent to corresponding performance data applying unit.
Production procedure and Monitoring Result of the present invention by the seismic monitoring project to history it can be seen from above description
Data carry out induction and conclusion, and seismic monitoring performance data is divided into different performance data type and data acquire item, into
Item is acquired according to each data of each performance data type when row performance data acquires and carries out data acquisition, ensure that each physical prospecting is made
The seismic prospecting performance data that industry unit generates has unified format.And then according to the data need of each performance data application unit
Different seismic prospecting performance datas is sent to corresponding performance data application unit, each data application unit is enable to have
The performance data using acquisition of effect.
In alternative embodiment of the invention, it is contemplated that the normalization and availability for improving the data of acquisition, according to pre-
If multiple performance data types and each performance data type corresponding data acquisition item acquisition seismic data when it is also right
The data of acquisition are verified.It is specifically as follows, first determines the present count of the corresponding data acquisition item of each performance data type
It standardizes according to acquisition, and then the seismic data of acquisition is veritified according to data acquisition specification.
It in an embodiment of the present invention, can production procedure by the seismic monitoring project to history and Monitoring Result number
Determine that the data acquisition of each data acquisition item standardizes according to induction and conclusion is carried out.The data of the data acquisition item of structuring are adopted
Collection specification, which specify the data standards of all acquisition data of the data of structuring acquisition item.In an embodiment of the present invention,
Data acquisition specification can be with are as follows: there are data input, input data in default range etc..
The present invention acquires specification by setting data and carries out Quality Control scanning to each data acquisition item, in this way to complete
, specification data carry out normal acquisition, to imperfect, nonstandard data item then retract data generate unit regenerate,
Effectively raise the normalization and availability of the data of acquisition.
Fig. 2 is the flow chart that the embodiment of the present invention carries out data acquisition according to performance data type and data acquisition item,
As shown in Fig. 2, the process for carrying out data acquisition according to performance data type and data acquisition item of the embodiment of the present invention includes
Step S201 and step S202.
Step S201 determines the achievement number according to the production procedure of the seismic monitoring project of history and seismic data
Item is acquired according to type and the data.
Step S202 acquires item according to preset multiple performance data types and the corresponding data of each performance data type
Acquire seismic data.
Fig. 3 is the flow chart that the embodiment of the present invention sends seismic data to corresponding data application unit, such as Fig. 3
Shown, the process that seismic data is sent to corresponding data application unit is included step S301 and step by the embodiment of the present invention
Rapid S302.
Step S301 deposits the seismic data according to the performance data type and/or data acquisition item
Storage.
The seismic data of storage is sent corresponding performance data applying unit by step S302.
In embodiments of the present invention, corresponding according to preset multiple performance data types and each performance data type
After data acquire item acquisition seismic data, also the seismic data of all acquisitions is carried out summarizing storage, establish ground
Shake raw data.It, can be according to performance data type in embodiments of the present invention when being stored to seismic data
Classification storage is carried out, item can be acquired according to each data and carry out classification storage, can also adopted according to performance data type and data
Collect item and carry out classification storage, convenient for more efficient inquiry data.In embodiments of the present invention, seismic data is stored
Array dynamic memory can be used.
In an embodiment of the present invention, correspondence is being sent by the seismic data being stored in seismic data library
Performance data applying unit when, can want to need to look into from seismic data library according to the data of performance data applying unit
Corresponding seismic data is ask out, and then the user inquired is sent to corresponding performance data applying unit.
Fig. 4 is the flow chart of seismic data of embodiment of the present invention acquisition, as shown in figure 4, earthquake of the embodiment of the present invention
The process of performance data acquisition includes step S401 and step S402.
Step S401 obtains the corresponding acquisition data of each data acquisition item and data acquisition specification.
Step S402 acquires each data acquisition item correspondingly according to the acquisition data and data acquisition specification
Shake performance data.
In an embodiment of the present invention, each data acquisition item includes one or more acquisition data, each data acquisition
Item is also corresponding with preset data acquisition specification, and data acquisition specification can be the data format etc. of each acquisition data.
In alternative embodiment of the invention, data acquisition interface can also be established for each data acquisition item, this is adopted
Collection interface is for inputting the corresponding acquisition data of data acquisition item.The data acquisition interface may include that data acquisition item is right
The Data Input Interface for all acquisition data answered, furthermore data acquisition interface may further specify that the data lattice of each acquisition data
Formula.
From the above, it can be seen that the seismic data junction method of the embodiment of the present invention at least realizes following skill
Art effect:
1, the present invention carries out induction and conclusion by the production procedure of the seismic monitoring project to history and Monitoring Result data,
Seismic monitoring performance data is divided into different performance data type and data acquisition item, the root when carrying out performance data acquisition
Data acquisition is carried out according to each data acquisition item of each performance data type, the earthquake that ensure that each physical prospecting work unit generates is surveyed
Visiting performance data has unified format.And then it is needed according to the data of each performance data application unit by different seismic prospectings
Performance data is sent to corresponding performance data application unit, enables achievement of each data application unit effectively using acquisition
Data.
2, the seismic prospecting performance data junction method of the embodiment of the present invention is deposited by building data in production practice
Storage, transmission channel are connected data collection terminal with each application system, can not only guarantee the uniformity and timeliness of data supply, but also
Applications construct can be separated with data construction, establish data basis for the construction of wisdom oil gas field.
3, the seismic prospecting performance data junction method of the embodiment of the present invention, it is determined that performance data specification guarantees different
Application system obtains unified data source;Establish data collection process, guarantee data source can in time, be correctly pushed to different application
System, is truly realized data sharing, and data assets are converted to commercial value.
It should be noted that step shown in the flowchart of the accompanying drawings can be in such as a group of computer-executable instructions
It is executed in computer system, although also, logical order is shown in flow charts, and it in some cases, can be with not
The sequence being same as herein executes shown or described step.
Based on the same inventive concept, the embodiment of the invention also provides a kind of seismic data junction device, Ke Yiyong
The seismic data junction method described in realization above-described embodiment, as described in the following examples.Due to Seismic
The principle that data collection device solves the problems, such as is similar to seismic data junction method, therefore seismic data junction device
Embodiment may refer to the embodiment of seismic data junction method, overlaps will not be repeated.Art used below
The combination of the software and/or hardware of predetermined function may be implemented in language " unit ".Although device described in following embodiment is preferable
Ground is realized with software, but the realization of the combination of hardware or software and hardware is also that may and be contemplated.
Fig. 5 is the first structure block diagram of seismic data junction device of the embodiment of the present invention, as shown in figure 5, of the invention
Embodiment seismic data junction device includes: seismic data acquisition unit 1 and data transmission unit 2.
Seismic data acquisition unit 1, for according to preset multiple performance data types and each performance data kind
The corresponding data acquisition item of class acquires seismic data.
Data transmission unit 2, for according to each performance data applying unit in preset multiple performance data applying units
Required performance data type and/or data acquire item and send corresponding performance data application list for the seismic data
Member.
The present invention carries out induction and conclusion by the production procedure of the seismic monitoring project to history and Monitoring Result data, will
Seismic data, which is divided into three classes, to be respectively as follows: acquisition class performance data, processing class performance data and explains class performance data.Into
And go out multiple corresponding data acquisition items for each performance data type induction and conclusion.Carrying out seismic data acquisition
Time-division safety pin carries out seismic data acquisition to each data acquisition item of all performance data types, has data acquisition
Unified specification ensure that the integrality of acquisition data class.In an embodiment of the present invention, data acquisition item includes: structure
The data acquisition item of change and non-structured data acquire item.
In embodiments of the present invention, the Seismic number that performance data application unit is needed according to its respective function difference
According to also different.The present invention carries out induction and conclusion by the production procedure of the seismic monitoring project to history and Monitoring Result data,
Seismic data is divided into three performance data types, so go out for each performance data type induction and conclusion it is multiple right
The data acquisition item answered.Performance data application unit is corresponding according to the performance data type summed up and each performance data type
Data acquisition item determine itself need seismic data, in alternative embodiment of the invention, a performance data is answered
The seismic data that certain data acquisition items can be needed with unit, can also need some performance data type allly
Performance data is shaken, multiple data of multiple performance data types can also be needed to acquire the seismic data of item.The present invention
Different seismic datas is sent out according to performance data type needed for each performance data application unit and/or data acquisition item
It is sent to corresponding performance data applying unit.
Fig. 6 is the second structural block diagram of seismic data junction device of the embodiment of the present invention, as shown in fig. 6, of the invention
Embodiment seismic data junction device further include: data standard establishes unit 3.The data standard establishes unit 3 and ground
Performance data acquisition unit 1 is shaken to connect.
Data standard establishes unit 3, for according to the seismic monitoring project of history production procedure and seismic data
Determine the performance data type and data acquisition item.
Fig. 7 is the third structural block diagram of seismic data junction device of the embodiment of the present invention, as shown in fig. 7, of the invention
Embodiment seismic data junction device further include: data storage cell 4.The data storage cell 4 respectively with Seismic
Data acquisition unit 1 and data transmission unit 2 connect.
Data storage cell 4, for acquiring item to the Seismic number according to the performance data type and/or data
According to being stored.
The data transmission unit 2 is also used to obtain seismic data from the data storage cell 4, and by earthquake
Performance data is sent to corresponding performance data applying unit.
In embodiments of the present invention, corresponding according to preset multiple performance data types and each performance data type
After data acquire item acquisition seismic data, also the seismic data of all acquisitions is carried out summarizing storage, establish ground
Shake raw data.It, can be according to performance data type in embodiments of the present invention when being stored to seismic data
Classification storage is carried out, item can be acquired according to each data and carry out classification storage, can also adopted according to performance data type and data
Collect item and carry out classification storage, convenient for more efficient inquiry data.In embodiments of the present invention, seismic data is stored
Array dynamic memory can be used.
Fig. 8 is seismic data acquisition unit of embodiment of the present invention composition structure chart, as shown in figure 8, the present invention is implemented
Example seismic data acquisition unit 1 includes: acquisition specification determining module 101 and data acquisition module 102.
Specification determining module 101 is acquired, for obtaining the corresponding acquisition data of each data acquisition item and data acquisition rule
Model.
Data acquisition module 102, for acquiring each data according to the acquisition data and data acquisition specification and adopting
Collect the corresponding seismic data of item.
In an embodiment of the present invention, each data acquisition item includes one or more acquisition data, each data acquisition
Item is also corresponding with preset data acquisition specification, and data acquisition specification can be the data format etc. of each acquisition data.
To achieve the goals above, according to the another aspect of the application, a kind of computer equipment is additionally provided.Such as Fig. 9 institute
Show, which includes memory, processor, communication interface and communication bus, and being stored with can locate on a memory
The computer program run on reason device, the processor realize the step in above-described embodiment method when executing the computer program
Suddenly.
Processor can be central processing unit (Central Processing Unit, CPU).Processor can also be it
His general processor, digital signal processor (Digital Signal Processor, DSP), specific integrated circuit
(Application Specific Integrated Circuit, ASIC), field programmable gate array (Field-
Programmable Gate Array, FPGA) either other programmable logic device, discrete gate or transistor logic,
The combination of the chips such as discrete hardware components or above-mentioned all kinds of chips.
Memory as a kind of non-transient computer readable storage medium, can be used for storing non-transient software program, it is non-temporarily
State computer executable program and unit, such as corresponding program unit in above method embodiment of the present invention.Processor passes through
Non-transient software program, instruction and module stored in memory are run, thereby executing the various function application of processor
And work data processing, that is, realize the method in above method embodiment.
Memory may include storing program area and storage data area, wherein storing program area can storage program area, extremely
Application program required for a few function;It storage data area can the data etc. that are created of storage processor.In addition, memory can
It can also include non-transient memory, for example, at least disk memory, a flash memory to include high-speed random access memory
Device or other non-transient solid-state memories.In some embodiments, it includes remotely setting relative to processor that memory is optional
The memory set, these remote memories can pass through network connection to processor.The example of above-mentioned network includes but is not limited to
Internet, intranet, local area network, mobile radio communication and combinations thereof.
One or more of unit storages in the memory, when being executed by the processor, execute above-mentioned
Method in embodiment.
Above-mentioned computer equipment detail can correspond to refering to associated description corresponding in above-described embodiment and effect into
Row understands that details are not described herein again.
To achieve the goals above, according to the another aspect of the application, a kind of computer readable storage medium is additionally provided,
The computer-readable recording medium storage has computer program, real when the computer program executes in the computer processor
Step in existing above-mentioned seismic data junction method.It will be understood by those skilled in the art that realizing above-described embodiment method
In all or part of the process, be that relevant hardware can be instructed to complete by computer program, the program can deposit
It is stored in a computer-readable storage medium, the program is when being executed, it may include such as the process of the embodiment of above-mentioned each method.
Wherein, the storage medium can be magnetic disk, CD, read-only memory (Read-Only Memory, ROM), random storage
Memory body (RandomAccessMemory, RAM), flash memory (Flash Memory), hard disk (Hard Disk Drive,
Abbreviation: HDD) or solid state hard disk (Solid-State Drive, SSD) etc.;The storage medium can also include mentioned kind
The combination of memory.
Obviously, those skilled in the art should be understood that each module of the above invention or each step can be with general
Computing device realize that they can be concentrated on a single computing device, or be distributed in multiple computing devices and formed
Network on, optionally, they can be realized with the program code that computing device can perform, it is thus possible to which they are stored
Be performed by computing device in the storage device, perhaps they are fabricated to each integrated circuit modules or by they
In multiple modules or step be fabricated to single integrated circuit module to realize.In this way, the present invention is not limited to any specific
Hardware and software combines.
The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, for the skill of this field
For art personnel, the invention may be variously modified and varied.All within the spirits and principles of the present invention, made any to repair
Change, equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.
Claims (12)
1. a kind of seismic data junction method characterized by comprising
Seismic is acquired according to preset multiple performance data types and the corresponding data acquisition item of each performance data type
Data;
According to performance data type needed for each performance data applying unit in preset multiple performance data applying units and/or
Data acquire item and send corresponding performance data applying unit for the seismic data.
2. seismic data junction method according to claim 1, which is characterized in that further include:
The performance data type and institute are determined according to the production procedure of the seismic monitoring project of history and seismic data
State data acquisition item.
3. seismic data junction method according to claim 1, which is characterized in that further include:
The seismic data is stored according to the performance data type and/or data acquisition item;
It is described to send corresponding performance data applying unit for the seismic data, it specifically includes:
Corresponding performance data applying unit is sent by the seismic data of storage.
4. seismic data junction method according to claim 1, which is characterized in that the performance data type packet
It includes: acquisition class performance data, processing class performance data and explanation class performance data;The data acquisition item includes: structuring
Data acquire item and unstructured data acquires item.
5. seismic data junction method according to claim 1, which is characterized in that it is described according to it is preset it is multiple at
Fruit data class and the corresponding data acquisition item of each performance data type acquire seismic data, comprising:
Obtain the corresponding acquisition data of each data acquisition item and data acquisition specification;
The corresponding seismic data of each data acquisition item is acquired according to the acquisition data and data acquisition specification.
6. a kind of seismic data junction device characterized by comprising
Seismic data acquisition unit, for corresponding according to preset multiple performance data types and each performance data type
Data acquisition item acquire seismic data;
Data transmission unit, for according to needed for each performance data applying unit in preset multiple performance data applying units
Performance data type and/or data acquire item and send corresponding performance data applying unit for the seismic data.
7. seismic data junction device according to claim 6, which is characterized in that further include:
Data standard establishes unit, for determining institute according to the production procedure and seismic data of the seismic monitoring project of history
State performance data type and data acquisition item.
8. seismic data junction device according to claim 6, which is characterized in that further include:
Data storage cell, for according to the performance data type and/or data acquisition item to the seismic data into
Row storage;
The data transmission unit is also used to obtain seismic data from the data storage cell, and by Seismic number
According to being sent to corresponding performance data applying unit.
9. seismic data junction device according to claim 6, which is characterized in that the performance data type packet
It includes: acquisition class performance data, processing class performance data and explanation class performance data;The data acquisition item includes: structuring
Data acquire item and unstructured data acquires item.
10. seismic data junction device according to claim 6, which is characterized in that the seismic data is adopted
Collect unit, comprising:
Specification determining module is acquired, for obtaining the corresponding acquisition data of each data acquisition item and data acquisition specification;
Data acquisition module, it is corresponding for acquiring each data acquisition item according to the acquisition data and data acquisition specification
Seismic data.
11. a kind of computer equipment including memory, processor and stores the meter that can be run on a memory and on a processor
Calculation machine program, which is characterized in that the processor realizes any one of claim 1 to 5 method when executing the computer program
In step.
12. a kind of computer readable storage medium, the computer-readable recording medium storage has computer program, and feature exists
In realization such as the step in claim 1 to 5 any one method when the computer program executes in the computer processor
Suddenly.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910565772.2A CN110442626A (en) | 2019-06-27 | 2019-06-27 | Seismic data junction method and device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910565772.2A CN110442626A (en) | 2019-06-27 | 2019-06-27 | Seismic data junction method and device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110442626A true CN110442626A (en) | 2019-11-12 |
Family
ID=68428419
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910565772.2A Pending CN110442626A (en) | 2019-06-27 | 2019-06-27 | Seismic data junction method and device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110442626A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1963562A (en) * | 2005-11-11 | 2007-05-16 | 中国石油天然气集团公司 | Managing method of data dynamic combination of work area of multiple earthquake generating |
CN101159068A (en) * | 2007-07-31 | 2008-04-09 | 东南大学 | Information acquisition and processing method for field operation equipment executing land patrolling and real time monitoring |
US20160224645A1 (en) * | 2015-02-03 | 2016-08-04 | Siemens Aktiengesellschaft | System and method for ontology-based data integration |
CN106033441A (en) * | 2015-03-16 | 2016-10-19 | 中国石油化工股份有限公司 | Management method for data file relating to exploration |
US20180284737A1 (en) * | 2016-05-09 | 2018-10-04 | StrongForce IoT Portfolio 2016, LLC | Methods and systems for detection in an industrial internet of things data collection environment with large data sets |
CN109918371A (en) * | 2019-01-25 | 2019-06-21 | 中国石油天然气股份有限公司 | Method, device and system for storing and accessing seismic interpretation result data |
-
2019
- 2019-06-27 CN CN201910565772.2A patent/CN110442626A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1963562A (en) * | 2005-11-11 | 2007-05-16 | 中国石油天然气集团公司 | Managing method of data dynamic combination of work area of multiple earthquake generating |
CN101159068A (en) * | 2007-07-31 | 2008-04-09 | 东南大学 | Information acquisition and processing method for field operation equipment executing land patrolling and real time monitoring |
US20160224645A1 (en) * | 2015-02-03 | 2016-08-04 | Siemens Aktiengesellschaft | System and method for ontology-based data integration |
CN106033441A (en) * | 2015-03-16 | 2016-10-19 | 中国石油化工股份有限公司 | Management method for data file relating to exploration |
US20180284737A1 (en) * | 2016-05-09 | 2018-10-04 | StrongForce IoT Portfolio 2016, LLC | Methods and systems for detection in an industrial internet of things data collection environment with large data sets |
CN109918371A (en) * | 2019-01-25 | 2019-06-21 | 中国石油天然气股份有限公司 | Method, device and system for storing and accessing seismic interpretation result data |
Non-Patent Citations (3)
Title |
---|
时玉龙: "地学项目数据库建设和应用", 《数字石油和化工》 * |
王从镔: "石油行业上游生产(勘探、开发) 数据分类的研究", 《中国博士学位论文全文数据库 基础科学辑》 * |
高倩: "多源数字油田数据与油田数据融合及方法研究", 《中国博士学位论文全文数据库 基础科学辑》 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20130321458A1 (en) | Contextual visualization via configurable ip-space maps | |
EP3259679B1 (en) | An automatically invoked unified visualization interface | |
US10552521B2 (en) | Analyzing a click path in a spherical landscape viewport | |
US20160147880A1 (en) | Multi-dimensional visualization of query execution in distributed databases | |
CN103077254A (en) | Webpage acquiring method and device | |
US11210343B2 (en) | Graph data processing method and apparatus thereof | |
CN104572800A (en) | Comparison and merging of IC design data | |
US20170199912A1 (en) | Behavior topic grids | |
CN102968404B (en) | First arrival information processing method and device for seismic data | |
CN109525836A (en) | Embedded multimode based on FPGA is same to survey device | |
CN106682047B (en) | A kind of data lead-in method and relevant apparatus | |
CN110413808A (en) | A kind of storage of three dimensional point cloud, querying method and device | |
CN109597964A (en) | Theoretical flow through oil reservoir parameter value determines method, system, equipment, readable medium | |
CA2906081A1 (en) | Presenting publisher data sets in context | |
CN110442626A (en) | Seismic data junction method and device | |
AU2022224481B2 (en) | Diagramming child nodes with multiple parent nodes | |
WO2014160913A1 (en) | Context transfer for data storage | |
CN102968593B (en) | The method and system of the isolating points of application program is positioned under multi-tenant environment | |
CN111751880B (en) | Well earthquake data combined display method and device | |
JP2013171541A (en) | Visualization device, visualization method and visualization program | |
US10282376B2 (en) | Semi-structured spatial data conversion | |
da Silva Alves et al. | Towards parameter-based profiling for mare2dem performance modeling | |
CN110308478A (en) | VSP seismic monitoring performance data acquisition method and device | |
Bunting et al. | Characterizing errors and evaluating performance of transient simulations using multi-time-step integration | |
CN104408184A (en) | Two-dimensional visual data display method and device based on data cubes |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20191112 |
|
RJ01 | Rejection of invention patent application after publication |