CN110442626A - Seismic data junction method and device - Google Patents

Seismic data junction method and device Download PDF

Info

Publication number
CN110442626A
CN110442626A CN201910565772.2A CN201910565772A CN110442626A CN 110442626 A CN110442626 A CN 110442626A CN 201910565772 A CN201910565772 A CN 201910565772A CN 110442626 A CN110442626 A CN 110442626A
Authority
CN
China
Prior art keywords
data
seismic
acquisition
performance data
item
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910565772.2A
Other languages
Chinese (zh)
Inventor
杨冬梅
江巍
杨洪德
梁虹
汤成兵
赵园
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
BGP Inc
Original Assignee
China National Petroleum Corp
BGP Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Petroleum Corp, BGP Inc filed Critical China National Petroleum Corp
Priority to CN201910565772.2A priority Critical patent/CN110442626A/en
Publication of CN110442626A publication Critical patent/CN110442626A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/25Integrating or interfacing systems involving database management systems
    • G06F16/252Integrating or interfacing systems involving database management systems between a Database Management System and a front-end application
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/25Integrating or interfacing systems involving database management systems
    • G06F16/258Data format conversion from or to a database
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/26Government or public services

Landscapes

  • Engineering & Computer Science (AREA)
  • Databases & Information Systems (AREA)
  • Theoretical Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • Data Mining & Analysis (AREA)
  • General Engineering & Computer Science (AREA)
  • General Health & Medical Sciences (AREA)
  • Educational Administration (AREA)
  • Health & Medical Sciences (AREA)
  • Economics (AREA)
  • Development Economics (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • General Business, Economics & Management (AREA)
  • Geophysics And Detection Of Objects (AREA)

Abstract

The invention discloses a kind of seismic data junction method and device, which includes: according to preset multiple performance data types and the corresponding data acquisition item acquisition seismic data of each performance data type;Corresponding performance data applying unit is sent by the seismic data according to performance data type needed for each performance data applying unit in preset multiple performance data applying units and/or data acquisition item.The present invention solve the prior art difference physical prospecting work unit generation seismic prospecting performance data format it is lack of standardization cause data application unit be difficult to effectively using acquisition performance data the technical issues of.

Description

Seismic data junction method and device
Technical field
The present invention relates to earthquake monitoring fields, in particular to a kind of seismic data junction method and device.
Background technique
The junction of seismic prospecting performance data is also in space state at present.Different physical prospecting work units in actual production The performance data type disunity of generation, data format are lack of standardization, and the data source between different data application unit is caused not united One, each data application unit is difficult to effectively utilize the performance data of acquisition after data filing.
The present invention proposes a kind of seismic data junction method and dress to solve at least one above-mentioned technical problem It sets.
Summary of the invention
The main purpose of the present invention is to provide a kind of seismic data junction method and devices, to solve the prior art The seismic prospecting performance data format that different physical prospecting work units generate is lack of standardization to cause data application unit to be difficult to effective benefit The technical issues of with the performance data of acquisition.
To achieve the goals above, according to an aspect of the invention, there is provided a kind of seismic data junction method, This method comprises:
Earthquake is acquired according to preset multiple performance data types and the corresponding data acquisition item of each performance data type Performance data;
According to performance data type needed for each performance data applying unit in preset multiple performance data applying units And/or the seismic data is sent corresponding performance data applying unit by data acquisition item.
Optionally, this method further include:
According to the production procedure of the seismic monitoring project of history and seismic data determine the performance data type with And the data acquire item.
Optionally, this method further include:
The seismic data is stored according to the performance data type and/or data acquisition item;
It is described to send corresponding performance data applying unit for the seismic data, it specifically includes:
Corresponding performance data applying unit is sent by the seismic data of storage.
Optionally, the performance data type include: acquisition class performance data, processing class performance data and explain class at Fruit data;The data acquisition item includes: structure data entry item and unstructured data acquisition item.
Optionally, described to be acquired according to preset multiple performance data types and the corresponding data of each performance data type Item acquisition seismic data, comprising:
Obtain the corresponding acquisition data of each data acquisition item and data acquisition specification;
The corresponding Seismic number of each data acquisition item is acquired according to the acquisition data and data acquisition specification According to.
To achieve the goals above, according to another aspect of the present invention, a kind of seismic data junction dress is provided It sets, which includes:
Seismic data acquisition unit, for according to preset multiple performance data types and each performance data type Corresponding data acquisition item acquires seismic data;
Data transmission unit, for according to performance data applying unit institute each in preset multiple performance data applying units The seismic data is sent corresponding performance data application list by performance data type and/or data the acquisition item needed Member.
Optionally, the device further include:
Data standard establishes unit, for true according to the production procedure of the seismic monitoring project of history and seismic data The fixed performance data type and the data acquire item.
Optionally, the device further include:
Data storage cell, for acquiring item to the Seismic number according to the performance data type and/or data According to being stored;
The data transmission unit, be also used to from the data storage cell obtain seismic data, and by earthquake at Fruit data are sent to corresponding performance data applying unit.
Optionally, the performance data type include: acquisition class performance data, processing class performance data and explain class at Fruit data;The data acquisition item includes: structure data entry item and unstructured data acquisition item.
Optionally, the seismic data acquisition unit, comprising:
Specification determining module is acquired, for obtaining the corresponding acquisition data of each data acquisition item and data acquisition specification;
Data acquisition module, for acquiring each data according to the acquisition data and data acquisition specification and acquiring item Corresponding seismic data.
To achieve the goals above, according to another aspect of the present invention, a kind of computer equipment, including storage are additionally provided Device, processor and storage on a memory and the computer program that can run on a processor, the processor execution meter The step in above-mentioned seismic data junction method is realized when calculation machine program.
To achieve the goals above, according to another aspect of the present invention, a kind of computer readable storage medium is additionally provided, The computer-readable recording medium storage has computer program, real when the computer program executes in the computer processor Step in existing above-mentioned seismic data junction method.
The invention has the benefit that production procedure and Monitoring Result of the present invention by the seismic monitoring project to history Data carry out induction and conclusion, and seismic monitoring performance data is divided into different performance data type and data acquire item, into Item is acquired according to each data of each performance data type when row performance data acquires and carries out data acquisition, ensure that each physical prospecting is made The seismic prospecting performance data that industry unit generates has unified format.And then according to the data need of each performance data application unit Different seismic prospecting performance datas is sent to corresponding performance data application unit, each data application unit is enable to have The performance data using acquisition of effect.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is the present invention Some embodiments for those of ordinary skill in the art without creative efforts, can also basis These attached drawings obtain other attached drawings.In the accompanying drawings:
Fig. 1 is the flow chart of seismic data junction method of the embodiment of the present invention;
Fig. 2 is the flow chart that the embodiment of the present invention carries out data acquisition according to performance data type and data acquisition item;
Fig. 3 is the flow chart that the embodiment of the present invention sends seismic data to corresponding data application unit;
Fig. 4 is the flow chart of seismic data of embodiment of the present invention acquisition;
Fig. 5 is the first structure block diagram of seismic data junction device of the embodiment of the present invention;
Fig. 6 is the second structural block diagram of seismic data junction device of the embodiment of the present invention;
Fig. 7 is the third structural block diagram of seismic data junction device of the embodiment of the present invention;
Fig. 8 is seismic data acquisition unit of embodiment of the present invention composition structure chart;
Fig. 9 is computer equipment schematic diagram of the embodiment of the present invention.
Specific embodiment
In order to enable those skilled in the art to better understand the solution of the present invention, below in conjunction in the embodiment of the present invention Attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is only The embodiment of a part of the invention, instead of all the embodiments.Based on the embodiments of the present invention, ordinary skill people The model that the present invention protects all should belong in member's every other embodiment obtained without making creative work It encloses.
It should be understood by those skilled in the art that, the embodiment of the present invention can provide as method, system or computer program Product.Therefore, complete hardware embodiment, complete software embodiment or reality combining software and hardware aspects can be used in the present invention Apply the form of example.Moreover, it wherein includes the computer of computer usable program code that the present invention, which can be used in one or more, The computer program implemented in usable storage medium (including but not limited to magnetic disk storage, CD-ROM, optical memory etc.) produces The form of product.
It should be noted that term " includes " and " tool in description and claims of this specification and above-mentioned attached drawing Have " and their any deformation, it is intended that cover it is non-exclusive include, for example, containing a series of steps or units Process, method, system, product or equipment those of are not necessarily limited to be clearly listed step or unit, but may include without clear Other step or units listing to Chu or intrinsic for these process, methods, product or equipment.
It should be noted that in the absence of conflict, the feature in embodiment and embodiment in the present invention can phase Mutually combination.The present invention will be described in detail below with reference to the accompanying drawings and embodiments.
Fig. 1 is the flow chart of seismic data junction method of the embodiment of the present invention, as shown in Figure 1, the ground of the present embodiment Shaking performance data junction method includes step S101 to step S102.
Step S101 acquires item according to preset multiple performance data types and the corresponding data of each performance data type Acquire seismic data.
Step S102, according to achievement needed for each performance data applying unit in preset multiple performance data applying units Data class and/or data acquire item and send corresponding performance data applying unit for the seismic data.
The present invention carries out induction and conclusion by the production procedure of the seismic monitoring project to history and Monitoring Result data, will Seismic data, which is divided into three classes, to be respectively as follows: acquisition class performance data, processing class performance data and explains class performance data.Into And go out multiple corresponding data acquisition items for each performance data type induction and conclusion.Carrying out seismic data acquisition Time-division safety pin carries out seismic data acquisition to each data acquisition item of all performance data types, has data acquisition Unified specification ensure that the integrality of acquisition data class.
In an embodiment of the present invention, data acquisition item includes: the data acquisition item and non-structured number of structuring According to acquisition item.The data acquisition item of each structuring include it is multiple have incidence relation and to the relevant acquisition number of data acquisition item According to these acquisition data are that the data of the structuring acquire the corresponding data to be collected of item.Structuring in embodiments of the present invention Data acquisition item include: zero/non-zero well constraint inversion survey line attribute, survey line tables of data, survey line measurement coordinates table, acquisition basic data Deng.For acquiring basic data, being corresponding with includes: well-name, well north coordinate, well east coordinate, observation originates well depth, observation terminates 22 acquisition data such as well depth, instrument model.In embodiments of the present invention, the data acquisition item of each structuring and each structure The corresponding acquisition data of data acquisition item of change are all production procedure and Monitoring Result by the seismic monitoring project to history Data carry out what induction and conclusion obtained, to guarantee the comprehensive and integrality of seismic monitoring performance data acquisition.
In an embodiment of the present invention, non-structured data acquisition item is usually some documents in seismic monitoring project Class data and at fruit data etc., non-structured data acquisition item does not include with certain structure, relevant adopt Collect data.In an embodiment of the present invention, non-structured data acquisition item may include: document class data according to data type It acquires item, acquire item at fruit data and text class data acquisition item.Document class data acquisition item may include: acquisition report It accuses, acquisition multimedia, processing explanation is reported, multimedia etc. is explained in processing.At fruit data acquisition item may include: measurement at Fruit, processing interpretation results etc..Text class data acquisition item may include: take out road table, class's report, well data, when depth relation table, speed Table etc..Each non-structured data acquisition item is also production procedure and the Monitoring Result number by the seismic monitoring project to history According to carrying out what induction and conclusion obtained, guarantee that data caused by production links can be acquired completely.
In an embodiment of the present invention, the data acquisition item for acquiring the structuring of class performance data may include: physical prospecting work Area's attribute two dimension, three-dimensional properties table, earthquake construction two, three dimensional design attribute list, survey line tables of data acquire base data table, survey Line measures coordinates table etc..The non-structured data acquisition item for acquiring class performance data may include: SPS file, surface structure Survey data etc..
In an embodiment of the present invention, the data acquisition item for handling the structuring of class performance data may include: two-dimentional place Manage record sheet, three-dimensional process record sheet etc..The non-structured data acquisition item for handling class performance data may include: offset numbers According to body, pickup file etc..
In an embodiment of the present invention, the data acquisition item for explaining the structuring of class performance data may include: to be construed to Fruit base data table etc..The non-structured data acquisition item for explaining class performance data may include: layer position file, tomography text Part, attribute volume etc..
In embodiments of the present invention, the Seismic number that performance data application unit is needed according to its respective function difference According to also different.The present invention carries out induction and conclusion by the production procedure of the seismic monitoring project to history and Monitoring Result data, Seismic data is divided into three performance data types, so go out for each performance data type induction and conclusion it is multiple right The data acquisition item answered.Performance data application unit is corresponding according to the performance data type summed up and each performance data type Data acquisition item determine itself need seismic data, in alternative embodiment of the invention, a performance data is answered The seismic data that certain data acquisition items can be needed with unit, can also need some performance data type allly Performance data is shaken, multiple data of multiple performance data types can also be needed to acquire the seismic data of item.The present invention Different seismic datas is sent out according to performance data type needed for each performance data application unit and/or data acquisition item It is sent to corresponding performance data applying unit.
Production procedure and Monitoring Result of the present invention by the seismic monitoring project to history it can be seen from above description Data carry out induction and conclusion, and seismic monitoring performance data is divided into different performance data type and data acquire item, into Item is acquired according to each data of each performance data type when row performance data acquires and carries out data acquisition, ensure that each physical prospecting is made The seismic prospecting performance data that industry unit generates has unified format.And then according to the data need of each performance data application unit Different seismic prospecting performance datas is sent to corresponding performance data application unit, each data application unit is enable to have The performance data using acquisition of effect.
In alternative embodiment of the invention, it is contemplated that the normalization and availability for improving the data of acquisition, according to pre- If multiple performance data types and each performance data type corresponding data acquisition item acquisition seismic data when it is also right The data of acquisition are verified.It is specifically as follows, first determines the present count of the corresponding data acquisition item of each performance data type It standardizes according to acquisition, and then the seismic data of acquisition is veritified according to data acquisition specification.
It in an embodiment of the present invention, can production procedure by the seismic monitoring project to history and Monitoring Result number Determine that the data acquisition of each data acquisition item standardizes according to induction and conclusion is carried out.The data of the data acquisition item of structuring are adopted Collection specification, which specify the data standards of all acquisition data of the data of structuring acquisition item.In an embodiment of the present invention, Data acquisition specification can be with are as follows: there are data input, input data in default range etc..
The present invention acquires specification by setting data and carries out Quality Control scanning to each data acquisition item, in this way to complete , specification data carry out normal acquisition, to imperfect, nonstandard data item then retract data generate unit regenerate, Effectively raise the normalization and availability of the data of acquisition.
Fig. 2 is the flow chart that the embodiment of the present invention carries out data acquisition according to performance data type and data acquisition item, As shown in Fig. 2, the process for carrying out data acquisition according to performance data type and data acquisition item of the embodiment of the present invention includes Step S201 and step S202.
Step S201 determines the achievement number according to the production procedure of the seismic monitoring project of history and seismic data Item is acquired according to type and the data.
Step S202 acquires item according to preset multiple performance data types and the corresponding data of each performance data type Acquire seismic data.
Fig. 3 is the flow chart that the embodiment of the present invention sends seismic data to corresponding data application unit, such as Fig. 3 Shown, the process that seismic data is sent to corresponding data application unit is included step S301 and step by the embodiment of the present invention Rapid S302.
Step S301 deposits the seismic data according to the performance data type and/or data acquisition item Storage.
The seismic data of storage is sent corresponding performance data applying unit by step S302.
In embodiments of the present invention, corresponding according to preset multiple performance data types and each performance data type After data acquire item acquisition seismic data, also the seismic data of all acquisitions is carried out summarizing storage, establish ground Shake raw data.It, can be according to performance data type in embodiments of the present invention when being stored to seismic data Classification storage is carried out, item can be acquired according to each data and carry out classification storage, can also adopted according to performance data type and data Collect item and carry out classification storage, convenient for more efficient inquiry data.In embodiments of the present invention, seismic data is stored Array dynamic memory can be used.
In an embodiment of the present invention, correspondence is being sent by the seismic data being stored in seismic data library Performance data applying unit when, can want to need to look into from seismic data library according to the data of performance data applying unit Corresponding seismic data is ask out, and then the user inquired is sent to corresponding performance data applying unit.
Fig. 4 is the flow chart of seismic data of embodiment of the present invention acquisition, as shown in figure 4, earthquake of the embodiment of the present invention The process of performance data acquisition includes step S401 and step S402.
Step S401 obtains the corresponding acquisition data of each data acquisition item and data acquisition specification.
Step S402 acquires each data acquisition item correspondingly according to the acquisition data and data acquisition specification Shake performance data.
In an embodiment of the present invention, each data acquisition item includes one or more acquisition data, each data acquisition Item is also corresponding with preset data acquisition specification, and data acquisition specification can be the data format etc. of each acquisition data.
In alternative embodiment of the invention, data acquisition interface can also be established for each data acquisition item, this is adopted Collection interface is for inputting the corresponding acquisition data of data acquisition item.The data acquisition interface may include that data acquisition item is right The Data Input Interface for all acquisition data answered, furthermore data acquisition interface may further specify that the data lattice of each acquisition data Formula.
From the above, it can be seen that the seismic data junction method of the embodiment of the present invention at least realizes following skill Art effect:
1, the present invention carries out induction and conclusion by the production procedure of the seismic monitoring project to history and Monitoring Result data, Seismic monitoring performance data is divided into different performance data type and data acquisition item, the root when carrying out performance data acquisition Data acquisition is carried out according to each data acquisition item of each performance data type, the earthquake that ensure that each physical prospecting work unit generates is surveyed Visiting performance data has unified format.And then it is needed according to the data of each performance data application unit by different seismic prospectings Performance data is sent to corresponding performance data application unit, enables achievement of each data application unit effectively using acquisition Data.
2, the seismic prospecting performance data junction method of the embodiment of the present invention is deposited by building data in production practice Storage, transmission channel are connected data collection terminal with each application system, can not only guarantee the uniformity and timeliness of data supply, but also Applications construct can be separated with data construction, establish data basis for the construction of wisdom oil gas field.
3, the seismic prospecting performance data junction method of the embodiment of the present invention, it is determined that performance data specification guarantees different Application system obtains unified data source;Establish data collection process, guarantee data source can in time, be correctly pushed to different application System, is truly realized data sharing, and data assets are converted to commercial value.
It should be noted that step shown in the flowchart of the accompanying drawings can be in such as a group of computer-executable instructions It is executed in computer system, although also, logical order is shown in flow charts, and it in some cases, can be with not The sequence being same as herein executes shown or described step.
Based on the same inventive concept, the embodiment of the invention also provides a kind of seismic data junction device, Ke Yiyong The seismic data junction method described in realization above-described embodiment, as described in the following examples.Due to Seismic The principle that data collection device solves the problems, such as is similar to seismic data junction method, therefore seismic data junction device Embodiment may refer to the embodiment of seismic data junction method, overlaps will not be repeated.Art used below The combination of the software and/or hardware of predetermined function may be implemented in language " unit ".Although device described in following embodiment is preferable Ground is realized with software, but the realization of the combination of hardware or software and hardware is also that may and be contemplated.
Fig. 5 is the first structure block diagram of seismic data junction device of the embodiment of the present invention, as shown in figure 5, of the invention Embodiment seismic data junction device includes: seismic data acquisition unit 1 and data transmission unit 2.
Seismic data acquisition unit 1, for according to preset multiple performance data types and each performance data kind The corresponding data acquisition item of class acquires seismic data.
Data transmission unit 2, for according to each performance data applying unit in preset multiple performance data applying units Required performance data type and/or data acquire item and send corresponding performance data application list for the seismic data Member.
The present invention carries out induction and conclusion by the production procedure of the seismic monitoring project to history and Monitoring Result data, will Seismic data, which is divided into three classes, to be respectively as follows: acquisition class performance data, processing class performance data and explains class performance data.Into And go out multiple corresponding data acquisition items for each performance data type induction and conclusion.Carrying out seismic data acquisition Time-division safety pin carries out seismic data acquisition to each data acquisition item of all performance data types, has data acquisition Unified specification ensure that the integrality of acquisition data class.In an embodiment of the present invention, data acquisition item includes: structure The data acquisition item of change and non-structured data acquire item.
In embodiments of the present invention, the Seismic number that performance data application unit is needed according to its respective function difference According to also different.The present invention carries out induction and conclusion by the production procedure of the seismic monitoring project to history and Monitoring Result data, Seismic data is divided into three performance data types, so go out for each performance data type induction and conclusion it is multiple right The data acquisition item answered.Performance data application unit is corresponding according to the performance data type summed up and each performance data type Data acquisition item determine itself need seismic data, in alternative embodiment of the invention, a performance data is answered The seismic data that certain data acquisition items can be needed with unit, can also need some performance data type allly Performance data is shaken, multiple data of multiple performance data types can also be needed to acquire the seismic data of item.The present invention Different seismic datas is sent out according to performance data type needed for each performance data application unit and/or data acquisition item It is sent to corresponding performance data applying unit.
Fig. 6 is the second structural block diagram of seismic data junction device of the embodiment of the present invention, as shown in fig. 6, of the invention Embodiment seismic data junction device further include: data standard establishes unit 3.The data standard establishes unit 3 and ground Performance data acquisition unit 1 is shaken to connect.
Data standard establishes unit 3, for according to the seismic monitoring project of history production procedure and seismic data Determine the performance data type and data acquisition item.
Fig. 7 is the third structural block diagram of seismic data junction device of the embodiment of the present invention, as shown in fig. 7, of the invention Embodiment seismic data junction device further include: data storage cell 4.The data storage cell 4 respectively with Seismic Data acquisition unit 1 and data transmission unit 2 connect.
Data storage cell 4, for acquiring item to the Seismic number according to the performance data type and/or data According to being stored.
The data transmission unit 2 is also used to obtain seismic data from the data storage cell 4, and by earthquake Performance data is sent to corresponding performance data applying unit.
In embodiments of the present invention, corresponding according to preset multiple performance data types and each performance data type After data acquire item acquisition seismic data, also the seismic data of all acquisitions is carried out summarizing storage, establish ground Shake raw data.It, can be according to performance data type in embodiments of the present invention when being stored to seismic data Classification storage is carried out, item can be acquired according to each data and carry out classification storage, can also adopted according to performance data type and data Collect item and carry out classification storage, convenient for more efficient inquiry data.In embodiments of the present invention, seismic data is stored Array dynamic memory can be used.
Fig. 8 is seismic data acquisition unit of embodiment of the present invention composition structure chart, as shown in figure 8, the present invention is implemented Example seismic data acquisition unit 1 includes: acquisition specification determining module 101 and data acquisition module 102.
Specification determining module 101 is acquired, for obtaining the corresponding acquisition data of each data acquisition item and data acquisition rule Model.
Data acquisition module 102, for acquiring each data according to the acquisition data and data acquisition specification and adopting Collect the corresponding seismic data of item.
In an embodiment of the present invention, each data acquisition item includes one or more acquisition data, each data acquisition Item is also corresponding with preset data acquisition specification, and data acquisition specification can be the data format etc. of each acquisition data.
To achieve the goals above, according to the another aspect of the application, a kind of computer equipment is additionally provided.Such as Fig. 9 institute Show, which includes memory, processor, communication interface and communication bus, and being stored with can locate on a memory The computer program run on reason device, the processor realize the step in above-described embodiment method when executing the computer program Suddenly.
Processor can be central processing unit (Central Processing Unit, CPU).Processor can also be it His general processor, digital signal processor (Digital Signal Processor, DSP), specific integrated circuit (Application Specific Integrated Circuit, ASIC), field programmable gate array (Field- Programmable Gate Array, FPGA) either other programmable logic device, discrete gate or transistor logic, The combination of the chips such as discrete hardware components or above-mentioned all kinds of chips.
Memory as a kind of non-transient computer readable storage medium, can be used for storing non-transient software program, it is non-temporarily State computer executable program and unit, such as corresponding program unit in above method embodiment of the present invention.Processor passes through Non-transient software program, instruction and module stored in memory are run, thereby executing the various function application of processor And work data processing, that is, realize the method in above method embodiment.
Memory may include storing program area and storage data area, wherein storing program area can storage program area, extremely Application program required for a few function;It storage data area can the data etc. that are created of storage processor.In addition, memory can It can also include non-transient memory, for example, at least disk memory, a flash memory to include high-speed random access memory Device or other non-transient solid-state memories.In some embodiments, it includes remotely setting relative to processor that memory is optional The memory set, these remote memories can pass through network connection to processor.The example of above-mentioned network includes but is not limited to Internet, intranet, local area network, mobile radio communication and combinations thereof.
One or more of unit storages in the memory, when being executed by the processor, execute above-mentioned Method in embodiment.
Above-mentioned computer equipment detail can correspond to refering to associated description corresponding in above-described embodiment and effect into Row understands that details are not described herein again.
To achieve the goals above, according to the another aspect of the application, a kind of computer readable storage medium is additionally provided, The computer-readable recording medium storage has computer program, real when the computer program executes in the computer processor Step in existing above-mentioned seismic data junction method.It will be understood by those skilled in the art that realizing above-described embodiment method In all or part of the process, be that relevant hardware can be instructed to complete by computer program, the program can deposit It is stored in a computer-readable storage medium, the program is when being executed, it may include such as the process of the embodiment of above-mentioned each method. Wherein, the storage medium can be magnetic disk, CD, read-only memory (Read-Only Memory, ROM), random storage Memory body (RandomAccessMemory, RAM), flash memory (Flash Memory), hard disk (Hard Disk Drive, Abbreviation: HDD) or solid state hard disk (Solid-State Drive, SSD) etc.;The storage medium can also include mentioned kind The combination of memory.
Obviously, those skilled in the art should be understood that each module of the above invention or each step can be with general Computing device realize that they can be concentrated on a single computing device, or be distributed in multiple computing devices and formed Network on, optionally, they can be realized with the program code that computing device can perform, it is thus possible to which they are stored Be performed by computing device in the storage device, perhaps they are fabricated to each integrated circuit modules or by they In multiple modules or step be fabricated to single integrated circuit module to realize.In this way, the present invention is not limited to any specific Hardware and software combines.
The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, for the skill of this field For art personnel, the invention may be variously modified and varied.All within the spirits and principles of the present invention, made any to repair Change, equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.

Claims (12)

1. a kind of seismic data junction method characterized by comprising
Seismic is acquired according to preset multiple performance data types and the corresponding data acquisition item of each performance data type Data;
According to performance data type needed for each performance data applying unit in preset multiple performance data applying units and/or Data acquire item and send corresponding performance data applying unit for the seismic data.
2. seismic data junction method according to claim 1, which is characterized in that further include:
The performance data type and institute are determined according to the production procedure of the seismic monitoring project of history and seismic data State data acquisition item.
3. seismic data junction method according to claim 1, which is characterized in that further include:
The seismic data is stored according to the performance data type and/or data acquisition item;
It is described to send corresponding performance data applying unit for the seismic data, it specifically includes:
Corresponding performance data applying unit is sent by the seismic data of storage.
4. seismic data junction method according to claim 1, which is characterized in that the performance data type packet It includes: acquisition class performance data, processing class performance data and explanation class performance data;The data acquisition item includes: structuring Data acquire item and unstructured data acquires item.
5. seismic data junction method according to claim 1, which is characterized in that it is described according to it is preset it is multiple at Fruit data class and the corresponding data acquisition item of each performance data type acquire seismic data, comprising:
Obtain the corresponding acquisition data of each data acquisition item and data acquisition specification;
The corresponding seismic data of each data acquisition item is acquired according to the acquisition data and data acquisition specification.
6. a kind of seismic data junction device characterized by comprising
Seismic data acquisition unit, for corresponding according to preset multiple performance data types and each performance data type Data acquisition item acquire seismic data;
Data transmission unit, for according to needed for each performance data applying unit in preset multiple performance data applying units Performance data type and/or data acquire item and send corresponding performance data applying unit for the seismic data.
7. seismic data junction device according to claim 6, which is characterized in that further include:
Data standard establishes unit, for determining institute according to the production procedure and seismic data of the seismic monitoring project of history State performance data type and data acquisition item.
8. seismic data junction device according to claim 6, which is characterized in that further include:
Data storage cell, for according to the performance data type and/or data acquisition item to the seismic data into Row storage;
The data transmission unit is also used to obtain seismic data from the data storage cell, and by Seismic number According to being sent to corresponding performance data applying unit.
9. seismic data junction device according to claim 6, which is characterized in that the performance data type packet It includes: acquisition class performance data, processing class performance data and explanation class performance data;The data acquisition item includes: structuring Data acquire item and unstructured data acquires item.
10. seismic data junction device according to claim 6, which is characterized in that the seismic data is adopted Collect unit, comprising:
Specification determining module is acquired, for obtaining the corresponding acquisition data of each data acquisition item and data acquisition specification;
Data acquisition module, it is corresponding for acquiring each data acquisition item according to the acquisition data and data acquisition specification Seismic data.
11. a kind of computer equipment including memory, processor and stores the meter that can be run on a memory and on a processor Calculation machine program, which is characterized in that the processor realizes any one of claim 1 to 5 method when executing the computer program In step.
12. a kind of computer readable storage medium, the computer-readable recording medium storage has computer program, and feature exists In realization such as the step in claim 1 to 5 any one method when the computer program executes in the computer processor Suddenly.
CN201910565772.2A 2019-06-27 2019-06-27 Seismic data junction method and device Pending CN110442626A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910565772.2A CN110442626A (en) 2019-06-27 2019-06-27 Seismic data junction method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910565772.2A CN110442626A (en) 2019-06-27 2019-06-27 Seismic data junction method and device

Publications (1)

Publication Number Publication Date
CN110442626A true CN110442626A (en) 2019-11-12

Family

ID=68428419

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910565772.2A Pending CN110442626A (en) 2019-06-27 2019-06-27 Seismic data junction method and device

Country Status (1)

Country Link
CN (1) CN110442626A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1963562A (en) * 2005-11-11 2007-05-16 中国石油天然气集团公司 Managing method of data dynamic combination of work area of multiple earthquake generating
CN101159068A (en) * 2007-07-31 2008-04-09 东南大学 Information acquisition and processing method for field operation equipment executing land patrolling and real time monitoring
US20160224645A1 (en) * 2015-02-03 2016-08-04 Siemens Aktiengesellschaft System and method for ontology-based data integration
CN106033441A (en) * 2015-03-16 2016-10-19 中国石油化工股份有限公司 Management method for data file relating to exploration
US20180284737A1 (en) * 2016-05-09 2018-10-04 StrongForce IoT Portfolio 2016, LLC Methods and systems for detection in an industrial internet of things data collection environment with large data sets
CN109918371A (en) * 2019-01-25 2019-06-21 中国石油天然气股份有限公司 Method, device and system for storing and accessing seismic interpretation result data

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1963562A (en) * 2005-11-11 2007-05-16 中国石油天然气集团公司 Managing method of data dynamic combination of work area of multiple earthquake generating
CN101159068A (en) * 2007-07-31 2008-04-09 东南大学 Information acquisition and processing method for field operation equipment executing land patrolling and real time monitoring
US20160224645A1 (en) * 2015-02-03 2016-08-04 Siemens Aktiengesellschaft System and method for ontology-based data integration
CN106033441A (en) * 2015-03-16 2016-10-19 中国石油化工股份有限公司 Management method for data file relating to exploration
US20180284737A1 (en) * 2016-05-09 2018-10-04 StrongForce IoT Portfolio 2016, LLC Methods and systems for detection in an industrial internet of things data collection environment with large data sets
CN109918371A (en) * 2019-01-25 2019-06-21 中国石油天然气股份有限公司 Method, device and system for storing and accessing seismic interpretation result data

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
时玉龙: "地学项目数据库建设和应用", 《数字石油和化工》 *
王从镔: "石油行业上游生产(勘探、开发) 数据分类的研究", 《中国博士学位论文全文数据库 基础科学辑》 *
高倩: "多源数字油田数据与油田数据融合及方法研究", 《中国博士学位论文全文数据库 基础科学辑》 *

Similar Documents

Publication Publication Date Title
US20130321458A1 (en) Contextual visualization via configurable ip-space maps
EP3259679B1 (en) An automatically invoked unified visualization interface
US10552521B2 (en) Analyzing a click path in a spherical landscape viewport
US20160147880A1 (en) Multi-dimensional visualization of query execution in distributed databases
CN103077254A (en) Webpage acquiring method and device
US11210343B2 (en) Graph data processing method and apparatus thereof
CN104572800A (en) Comparison and merging of IC design data
US20170199912A1 (en) Behavior topic grids
CN102968404B (en) First arrival information processing method and device for seismic data
CN109525836A (en) Embedded multimode based on FPGA is same to survey device
CN106682047B (en) A kind of data lead-in method and relevant apparatus
CN110413808A (en) A kind of storage of three dimensional point cloud, querying method and device
CN109597964A (en) Theoretical flow through oil reservoir parameter value determines method, system, equipment, readable medium
CA2906081A1 (en) Presenting publisher data sets in context
CN110442626A (en) Seismic data junction method and device
AU2022224481B2 (en) Diagramming child nodes with multiple parent nodes
WO2014160913A1 (en) Context transfer for data storage
CN102968593B (en) The method and system of the isolating points of application program is positioned under multi-tenant environment
CN111751880B (en) Well earthquake data combined display method and device
JP2013171541A (en) Visualization device, visualization method and visualization program
US10282376B2 (en) Semi-structured spatial data conversion
da Silva Alves et al. Towards parameter-based profiling for mare2dem performance modeling
CN110308478A (en) VSP seismic monitoring performance data acquisition method and device
Bunting et al. Characterizing errors and evaluating performance of transient simulations using multi-time-step integration
CN104408184A (en) Two-dimensional visual data display method and device based on data cubes

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20191112

RJ01 Rejection of invention patent application after publication