CN102378237B - A kind of duty control method of user equipment network performance measurement and device - Google Patents
A kind of duty control method of user equipment network performance measurement and device Download PDFInfo
- Publication number
- CN102378237B CN102378237B CN201010262533.9A CN201010262533A CN102378237B CN 102378237 B CN102378237 B CN 102378237B CN 201010262533 A CN201010262533 A CN 201010262533A CN 102378237 B CN102378237 B CN 102378237B
- Authority
- CN
- China
- Prior art keywords
- tracking
- controlling parameter
- decision
- load
- mode
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W24/00—Supervisory, monitoring or testing arrangements
- H04W24/08—Testing, supervising or monitoring using real traffic
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L41/00—Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Data Exchanges In Wide-Area Networks (AREA)
Abstract
The invention discloses a kind of duty control method and device of user equipment network performance measurement, the problem of controlling for solving user equipment network performance measurement OAM load. In the present invention, OAM system detects current system load in real time, and according to the tracking and controlling parameter of current system load condition decision-making activation or change user equipment network performance measurement, by increase reported data mode attribute in tracking and controlling parameter, notifying user equipment is changed the mode that reports of measurement data. The present invention has realized load when OAM system is carried out to user equipment network performance measurement and has controlled, the efficiency and the flexibility that have improved user equipment network performance measurement.
Description
Technical field
The present invention relates to subscriber equipment tracking system in mobile radio communication, relate in particular to a kind of user and follow the tracks ofThe duty control method that while realizing user equipment network performance measurement, measurement data reports and device.
Background technology
The network coverage optimization of wireless network is used drive test (MinimizationofDriveTests, MDT)It is a mode fast and effectively. Completing MDT can user's device network performance measurement (UEbasedNetworkperformancemeasurements) realize, user equipment network performance measurement has in two kinds of dataReport mode: daily record (LoggedMDT) mode and in real time (ImmediateMDT) mode.
Under LoggedMDT mode, subscriber equipment (UserEquipment) timing is preserved measurement data to thisGround daily record, to base station (eNodeB), is then reported to trace data collection entity in next timed sending(TraceConnectionEntity,TCE)。
ImmediateMDT mode requires to support more than 50 UE real-time report data simultaneously, measures numberDo not preserve according to this locality, taking second level continue to be reported to eNodeB as cycle image data, then from eNodeBTCE reports for work.
TCE is an assembly of usertracking system, and usertracking system is operation management maintain systemThe part of (OperationAdministrationandMaintenance, OAM). Although ImmediateMDT mode is compared LoggedMDT mode has irreplaceable work to wireless network network coverage optimizationWith, but the data volume of real-time report is larger, and larger on the impact of OAM system loading. In OAM systemUnder the condition that load can bear, should use ImmediateMDT mode reported data as far as possible.
Can't be in the time activating in existing system designated user device network performance measurement reported data mode,After activation, can not revise the tracking and controlling parameter of user equipment network performance measurement, also just can not revise and followData in track control parameter report mode, cannot solve the ImmediateMDT reported data mode of usingSystem loading problem.
Summary of the invention
In view of this, main purpose of the present invention is to provide a kind of load of user equipment network performance measurementControl method and device, for solving asking of user equipment network performance measurement OAM system loading controlTopic.
For achieving the above object, technical scheme of the present invention is achieved in that
A duty control method for user equipment network performance measurement, comprising:
In the time carrying out user equipment network performance measurement, OAM system detects current system loading in real time, andDuring according to the current load condition decision-making of described OAM system excited users device network performance measurement, useTracking and controlling parameter, and decision-making measures in execution the tracking control that whether needs to change subscriber equipment in task processParameter processed.
Further, described method also comprises:
Described OAM system is measured message by activation the tracking and controlling parameter of decision-making is sent to be activatedSubscriber equipment; By changing tracking and controlling parameter message, the tracking and controlling parameter of decision-making is sent to and activatedSubscriber equipment; In described activation measurement message and change tracking and controlling parameter message, comprising reported data mode belongs toProperty and/or measuring period attribute.
Further, described method also comprises:
When described OAM system judges current system load excess load, refusal is (ImmediateMDT) in real timeThe activation request of the user equipment network performance measurement of reported data mode.
Further, OAM system changes the step of the tracking and controlling parameter of subscriber equipment according to current system loadSuddenly comprise:
Described OAM system detects that current system load exceedes on default normal duty thresholding in limited time, toThe subscriber equipment that has activated measurement sends one by one and changes tracking and controlling parameter message, and equipment for indicating user will reportData mode changes to LoggedMDT mode and/or increases measuring period, until load reduction is to defaultWithin normal duty threshold range.
Further, OAM system changes the step of the tracking and controlling parameter of subscriber equipment according to current system loadSuddenly comprise:
Described OAM system detects that current system load is lower than prescribing a time limit under default normal duty thresholding, toOne or more subscriber equipmenies that activated measurement send and change tracking and controlling parameter message, equipment for indicating userReported data mode is transferred to ImmediateMDT mode and/or reduces measuring period, until load is in advanceIf normal duty threshold range within.
Based on said method, the present invention also proposes a kind of load control unit of user equipment network performance measurement,This device comprises:
Monitoring modular, works as preload for detecting in real time OAM system;
Decision-making module, for according to OAM system when the to be activated or subscriber equipment that has been activated of preload decision-makingThe tracking and controlling parameter of the subscriber equipment of network performance measurement;
Active module, for according to the tracking and controlling parameter excited users device network performance of decision-making module decision-makingMeasure;
Executive Module, for changing according to the tracking and controlling parameter of decision-making module decision-making the subscriber equipment that has been activatedThe tracking and controlling parameter of the subscriber equipment of network performance measurement.
Further, described active module is measured message by activation the tracking and controlling parameter of decision-making is sent toSubscriber equipment to be activated; By changing tracking and controlling parameter message, the tracking and controlling parameter of decision-making is sent toThe subscriber equipment having activated; Described activation is measured message and is changed in tracking and controlling parameter message and comprises count offAccording to mode attribute and/or measuring period attribute.
Further, described decision-making module in the time of OAM system loading excess load, refusal active module withThe activation request of ImmediateMDT mode excited users device network performance measurement.
Further, described Executive Module comprises:
The first Executive Module, for exceeding at current system load on default load thresholding in limited time, according to described inThe decision-making module result of decision sends one by one and changes tracking and controlling parameter message to the subscriber equipment that activates measurement,Equipment for indicating user changes to reported data mode LoggedMDT mode and/or increases measuring period, straightIn to load reduction to default normal duty threshold range;
The second Executive Module, at current system load during lower than default load thresholding lower limit, according to instituteState the result of decision of decision-making module to the subscriber equipment of one or more activation measurements, send to change to follow the tracks of and controlParameter message, equipment for indicating user transfers reported data mode to ImmediateMDT mode and/or reduces to be surveyedThe amount cycle, until load is in default normal duty threshold range.
In the present invention, OAM system detects current system load in real time, and according to current system load condition certainlyPlan activates or changes the tracking and controlling parameter of user equipment network performance measurement, by tracking and controlling parameterThe attribute that increase reported data mode etc. can be controlled system loading, Dictating user equipment change is correspondingTracking and controlling parameter, to reach the object of controlling OAM system loading. The present invention has realized OAM to usingFamily device network performance measurement load is controlled, the efficiency and the flexibility that have improved user equipment network performance measurement.
Brief description of the drawings
Fig. 1 is the flow chart of the duty control method of user equipment network performance measurement of the present invention;
Fig. 2 is the flow chart that the present invention changes excited users device network performance measurement tracking and controlling parameter;
Fig. 3 is the flow chart of the load control unit of user equipment network performance measurement of the present invention.
Detailed description of the invention
Basic thought of the present invention is: before activation during by OAM system designated user device network performance measurementThe tracking and controlling parameter using changes subscriber equipment by OAM system according to current load condition after activationTracking and controlling parameter, to solve OAM load control problem.
For making the object, technical solutions and advantages of the present invention clearer, also reference by the following examplesAccompanying drawing, the present invention is described in more detail.
Fig. 1 is the flow process of the duty control method of a kind of user equipment network performance measurement of proposing of the present inventionFigure, concrete steps are as follows:
Step 101, OAM system configuration tracing task, manually or automated manner excited users establishStandby network performance measurement;
Operator can select automatic or manual mode in the time of excited users device network performance measurement, automaticallyThe tracking and controlling parameter of UE when OAM system determines to activate according to current system load under mode, described followingIn track control parameter, increase reported data mode attribute and/or measuring period, send to the activation measurement of UE to disappearBreath (for example RRCConnectionReconfiguration message) comprises tracking and controlling parameter. When UE receivesMeasure after message to activating, carry out tracking measurement process according to tracking and controlling parameter, adopt tracking and controlling parameterThe reported data mode of middle appointment and measuring period reporting measurement data; Under manual mode, subscriber equipment netThe tracking and controlling parameter of network performance measurement is arranged by operator, and reported data mode and/or measuring period also compriseIn tracking and controlling parameter, send to UE, measure after message, according to tracking and controlling parameter when UE receives to activateCarry out tracking measurement process, and adopt the reported data mode of specifying in tracking and controlling parameter and on measuring periodReport measurement data.
Further, in the time that OAM system judges current system load excess load, load exceedes defaultWhen the load thresholding upper limit, can refuse to activate the subscriber equipment net with ImmediateMDT mode reported dataNetwork performance measurement activation request.
Step 102, in measuring process, OAM system detects current system load in real time, if OAM systemSystem detects that current system load exceedes the default normal duty thresholding upper limit, and OAM system can not be processed in timeThe measurement data that UE reports, performs step 103; Otherwise execution step 104;
Step 103, OAM system by Element management system (ElementManagementSystem,EMS) send one by one and change tracking and controlling parameter message to UE, until load reduction is to normal duty thresholdingIn scope, in described change tracking and controlling parameter message, carry and belong to reported data mode attribute and/or measuring periodProperty, and to specify reported data mode property value be LoggedMDT mode and/or specify larger measuring periodProperty value;
Described change tracking and controlling parameter message can send by the existing protocol message of expansion, and for example RRC connectsConnect more new information etc. of reconfiguration message (RRCConnectionReconfiguration), trace session, also canSend by newly-increased signaling message; Wherein, carry tracking and controlling parameter, on increasing in tracking and controlling parameterReport data mode attribute and/or measuring period attribute.
The mode of excited users equipment reporting measurement data is changed to from ImmediateMDT modeLoggedMDT mode, or increase attribute measuring period all can make the data of user terminal to send up measurement dataAmount reduces, to alleviate the load of OAM system.
Step 104, OAM system detect current system load lower than under normal duty thresholding in limited time, can adoptSend change tracking and controlling parameter message with automatic control mode or manual control mode by EMS and change oneThe tracking and controlling parameter of the UE of the individual or multiple device network of excited users performance measurements, and specify upper count offBe ImmediateMDT mode and/or specify less property value measuring period according to mode property value, untilThe load of OAM system is in default normal duty threshold range.
Can be according to certain strategy while adopting automatic control mode, for example, in Preset Time, system loading is all protectedHold lower than normal duty thresholding lower limit, just send and change tracking and controlling parameter message from trend UE, for example, becomeThe data that more activated the UE that is using LoggedMDT mode reporting measurement data report mode,Report mode to change ImmediateMDT mode into from LoggedMDT mode; Under manual control mode, byOperator manually changes the data of the UE of the one or more device network of excited users performance measurements of appointmentReport mode, reporting mode to change ImmediateMDT mode into from LoggedMDT mode.
The mode of excited users equipment reporting measurement data is changed to from LoggedMDT modeImmediateMDT mode, or reduce measuring period attribute and all can make user terminal to send up in the unit interval surveyThe data volume of amount data increases, thereby increases the load of OAM system.
Below taking block core evolution (EvolvedPacketCore, EPC) system as example, to step 103With the UE transmission change to excited users device network performance measurement by Element management system in step 104Tracking and controlling parameter message, the step that instruction UE changes the mode of report measurement data is described in detail, asShown in Fig. 2, detailed step is as follows:
Step 201, OAM system by Element management system (ElementManagementSystem,EMS) send trace session update message to home subscriber server (HomeSubscriberServer,HSS), in this message, comprise tracking and controlling parameter, and in tracking and controlling parameter, comprise reported data mode attribute.
Step 202, HSS upgrades local trace session tracking and controlling parameter of preserving.
Step 203, HSS sends and upgrades subscriber data message to chain of command network element Mobility Management Entity(MobilityManangeEntity, MME), comprises the trace session information of tracked UE in this messageAnd tracking and controlling parameter information.
Step 204, MME upgrades local trace session tracking and controlling parameter of preserving.
Step 205, MME sends trace session and updates message to eNodeB.
Step 206, eNodeB upgrades local trace session tracking and controlling parameter of preserving.
Step 207, eNodeB sends trace session and updates message to UE.
Step 208, UE upgrades local trace session tracking and controlling parameter of preserving, according to tracking and controlling parameterIn reported data mode attribute change reporting data mode.
Step 209, UE returning tracking session updates acknowledgement messaging is to eNodeB;
If the success of UE change reporting data mode, successfully answers to eNodeB feedback and tracking session updatesAnswer; Otherwise unsuccessfully reply or the overtime response message of not receiving to eNodeB feedback and tracking session updates.
Step 210, eNodeB receives that trace session upgrades and unsuccessfully replys or overtime while not receiving response message,Send trace session renewal message failure and notify trace data collection entity (TCE).
Fig. 3 is that the structure of the load control unit 300 of the user equipment network performance measurement that proposes of the present invention is shownIntention, as shown in Figure 3, this device comprises:
Monitoring modular 301, works as preload for detecting in real time OAM system;
Decision-making module 302, for establishing as the to be activated or user that has been activated of preload decision-making according to OAM systemThe tracking and controlling parameter of the subscriber equipment of standby network performance measurement; In described tracking and controlling parameter, comprise count offAccording to mode attribute. Exceed on default normal duty thresholding and prescribe a time limit at OAM system loading, described decision modelPiece can be refused active module please with the activation of ImmediateMDT mode excited users device network performance measurementAsk, in case locking system load further raises.
Active module 303, for according to the tracking and controlling parameter excited users device network of decision-making module decision-makingPerformance measurement;
Executive Module, for changing according to the tracking and controlling parameter of decision-making module decision-making the subscriber equipment that has been activatedThe tracking and controlling parameter of the subscriber equipment of network performance measurement, so that the load of OAM system is in defaultWithin normal duty threshold range.
Described active module is measured message by activation the tracking and controlling parameter of decision-making is sent to use to be activatedFamily equipment; The tracking and controlling parameter of decision-making is sent to the use having activated by changing tracking and controlling parameter messageFamily equipment; Described activation is measured message and is changed in tracking and controlling parameter message and comprises reported data mode attributeAnd/or measuring period attribute.
Described Executive Module further comprises: the first Executive Module 304, the second Executive Module 305;
The first Executive Module, for exceeding at current system load on default load thresholding in limited time, according to described inThe decision-making module result of decision sends one by one and changes tracking and controlling parameter message to the subscriber equipment that activates measurement,Equipment for indicating user changes to reported data mode LoggedMDT mode and/or increases measuring period, straightIn to load reduction to default normal duty threshold range;
The second Executive Module, at current system load during lower than default load thresholding lower limit, according to instituteState the result of decision of decision-making module to the subscriber equipment of one or more activation measurements, send to change to follow the tracks of and controlParameter message, equipment for indicating user transfers reported data mode to ImmediateMDT mode and/or reduces to be surveyedThe amount cycle, until load is in default normal duty threshold range.
The above, be only preferred embodiment of the present invention, is not intended to limit protection model of the present inventionEnclose.
Claims (9)
1. a duty control method for user equipment network performance measurement, is characterized in that, comprising:
In the time carrying out user equipment network performance measurement, operation management maintain OAM system detects current in real timeSystem loading, and according to the current load condition decision-making of described OAM system excited users device network performanceThe tracking and controlling parameter using when measurement, and whether decision-making is measured in task process and is needed change to use in executionThe tracking and controlling parameter of family equipment;
If described OAM system detects described current system loading and exceedes on default normal duty thresholdingIn limited time, send one by one and change tracking and controlling parameter message to subscriber equipment, until load reduction is to normal dutyIn threshold range, in described change tracking and controlling parameter message, at least carry reported data mode attribute, and refer toDetermining reported data mode property value is LoggedMDT mode.
2. method according to claim 1, is characterized in that, described method also comprises:
Described OAM system is measured message by activation the tracking and controlling parameter of decision-making is sent to be activatedSubscriber equipment; By changing tracking and controlling parameter message, the tracking and controlling parameter of decision-making is sent to and activatedSubscriber equipment; In described activation measurement message and change tracking and controlling parameter message, comprising reported data mode belongs toProperty and/or measuring period attribute.
3. method according to claim 2, is characterized in that, described method also comprises:
When described OAM system judges current system load excess load, refuse on real-time ImmediateMDTThe activation request of the user equipment network performance measurement of report data mode.
4. method according to claim 2, is characterized in that, OAM system is negative according to current systemThe step that lotus is changed the tracking and controlling parameter of subscriber equipment comprises:
Described OAM system detects that current system load exceedes on default normal duty thresholding in limited time, toThe subscriber equipment that has activated measurement sends one by one and changes tracking and controlling parameter message, and equipment for indicating user will reportData mode changes to LoggedMDT mode and increases measuring period, until load reduction is to just presettingWithin normal load threshold range.
5. method according to claim 2, is characterized in that, OAM system is negative according to current systemThe step that lotus is changed the tracking and controlling parameter of subscriber equipment comprises:
Described OAM system detects that current system load is lower than prescribing a time limit under default normal duty thresholding, toOne or more subscriber equipmenies that activated measurement send and change tracking and controlling parameter message, equipment for indicating userReported data mode is transferred to ImmediateMDT mode and/or reduces measuring period, until load is in advanceIf normal duty threshold range within.
6. a load control unit for user equipment network performance measurement, is characterized in that, this device comprises:
Monitoring modular, works as preload for detecting in real time OAM system;
Decision-making module, for according to OAM system when the to be activated or subscriber equipment that has been activated of preload decision-makingThe tracking and controlling parameter of the subscriber equipment of network performance measurement;
Active module, for according to the tracking and controlling parameter excited users device network performance of decision-making module decision-makingMeasure;
Executive Module, for changing according to the tracking and controlling parameter of decision-making module decision-making the subscriber equipment that has been activatedThe tracking and controlling parameter of the subscriber equipment of network performance measurement, described Executive Module, specifically for detectingState current system loading and exceed on default normal duty thresholding in limited time, send one by one change to subscriber equipmentTracking and controlling parameter message, until load reduction is in normal duty threshold range, described change is followed the tracks of and is controlledIn parameter message, at least carry reported data mode attribute, and to specify reported data mode property value be LoggedMDT mode.
7. device according to claim 6, is characterized in that, described active module is measured by activationThe tracking and controlling parameter of decision-making is sent to subscriber equipment to be activated by message; By changing tracking and controlling parameterMessage sends to the tracking and controlling parameter of decision-making the subscriber equipment having activated; Message and change are measured in described activationMore in tracking and controlling parameter message, comprise reported data mode attribute and/or measuring period attribute.
8. device according to claim 6, is characterized in that,
Described decision-making module is in the time of OAM system loading excess load, and refusal active module is with ImmediateMDTThe activation request of mode excited users device network performance measurement.
9. device according to claim 7, is characterized in that, described Executive Module comprises:
The first Executive Module, for exceeding at current system load on default load thresholding in limited time, according to described inThe decision-making module result of decision sends one by one and changes tracking and controlling parameter message to the subscriber equipment that activates measurement,Equipment for indicating user changes to reported data mode LoggedMDT mode and increases measuring period, untilLoad reduction is in default normal duty threshold range;
The second Executive Module, at current system load during lower than default load thresholding lower limit, according to instituteState the result of decision of decision-making module to the subscriber equipment of one or more activation measurements, send to change to follow the tracks of and controlParameter message, equipment for indicating user transfers reported data mode to ImmediateMDT mode and/or reduces to be surveyedThe amount cycle, until load is in default normal duty threshold range.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201010262533.9A CN102378237B (en) | 2010-08-24 | 2010-08-24 | A kind of duty control method of user equipment network performance measurement and device |
PCT/CN2011/071455 WO2012024919A1 (en) | 2010-08-24 | 2011-03-02 | Method and device for load control in user equipment network performance measurement |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201010262533.9A CN102378237B (en) | 2010-08-24 | 2010-08-24 | A kind of duty control method of user equipment network performance measurement and device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102378237A CN102378237A (en) | 2012-03-14 |
CN102378237B true CN102378237B (en) | 2016-05-25 |
Family
ID=45722848
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201010262533.9A Expired - Fee Related CN102378237B (en) | 2010-08-24 | 2010-08-24 | A kind of duty control method of user equipment network performance measurement and device |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN102378237B (en) |
WO (1) | WO2012024919A1 (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103404192B (en) * | 2012-03-19 | 2017-07-21 | 华为技术有限公司 | The measurement result of up covering measurement item is obtained and report method, equipment |
WO2014033499A1 (en) * | 2012-08-30 | 2014-03-06 | Nokia Corporation | Decision making based on remote observation of node capabilities |
WO2014100983A1 (en) * | 2012-12-26 | 2014-07-03 | 华为技术有限公司 | Data transmission method, node and operating and management system |
CN106302620A (en) * | 2015-06-12 | 2017-01-04 | 中兴通讯股份有限公司 | Configuration update message sending method and device |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101026504A (en) * | 2006-02-24 | 2007-08-29 | 华为技术有限公司 | Network for formance measuring method |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP5487968B2 (en) * | 2007-09-26 | 2014-05-14 | 日本電気株式会社 | Wireless communication system and method |
-
2010
- 2010-08-24 CN CN201010262533.9A patent/CN102378237B/en not_active Expired - Fee Related
-
2011
- 2011-03-02 WO PCT/CN2011/071455 patent/WO2012024919A1/en active Application Filing
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101026504A (en) * | 2006-02-24 | 2007-08-29 | 华为技术有限公司 | Network for formance measuring method |
Also Published As
Publication number | Publication date |
---|---|
WO2012024919A1 (en) | 2012-03-01 |
CN102378237A (en) | 2012-03-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Nguyen et al. | Mobility robustness optimization for handover failure reduction in LTE small-cell networks | |
US9538462B2 (en) | Method for minimization of drive tests, method for collecting terminal information, terminal, and network element | |
US9451477B2 (en) | Method and system for implementing drive test | |
US8700028B2 (en) | Diagnostic management sessions in a communication network | |
CN102131207B (en) | Measurement report method, device and system | |
CN102469505B (en) | The method of the process inquiry overload of wireless telecommunication system | |
CN101969662B (en) | Method and system for measuring and reporting random access channel optimization by terminal | |
EP2615863A1 (en) | Method, equipment and system for user experience measurement | |
CN102892129B (en) | A kind of minimum drive test configuration information delivery method and network element based on management | |
CN101931981A (en) | Method and device for measuring minimum road test logs | |
CN103078704A (en) | Method and system for managing modulation code modes | |
CN103843403A (en) | Handover failure with discontinuous reception | |
US20150281990A1 (en) | Measurement Configuration and Reporting with Diverse Traffic | |
US20210400519A1 (en) | Method and device of processing abnormality configuration of minimization of drive-test | |
CN102378237B (en) | A kind of duty control method of user equipment network performance measurement and device | |
CN107949063A (en) | Mobility status data are provided from user equipment to network control node | |
CN107295559A (en) | Terminal roaming management method and access control equipment | |
CN103024769B (en) | It is a kind of to check the method and the network equipment for minimizing drive test configuration | |
CN103814620A (en) | Method and apparatus for adjusting random access parameters | |
CN101141811B (en) | Service establishing parameter automatic regulation method | |
US20240244522A1 (en) | Communication method and apparatus for network energy saving | |
CN102348221B (en) | Minimization drive test measurement method and user equipment | |
CN102740277B (en) | The control method of a kind of terminal measurement report when switching and system | |
CN102711132A (en) | Indoor wireless network quality evaluation method, evaluation device and evaluation system | |
CN103379521B (en) | Trigger minimum road test and measure the method for configuration |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160525 Termination date: 20200824 |