Jump to content

Yellow Line (Agra Metro)

From Wikipedia, the free encyclopedia

Yellow Line
Yellow Line train at Mankameshwar Temple station
Overview
Statuspartially operational
LocaleAgra, Uttar Pradesh, India
Termini
Service
Typerapid transit
SystemAgra Metro
Operator(s)Uttar Pradesh Metro Rail Corporation
Rolling stockAlstom - Bombardier Movia
History
Opened6 March 2024
Technical
Line length6.5 km (4.0 mi) (initial corridor)
Characterunderground and elevated
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification750 V DC third rail
Operating speed
  • 80 km/h (50 mph) (maximum)
  • 34 km/h (21 mph) (average)
Route map

Yellow line
Sikandara
Guru Ka Taal
ISBT
RBS College
Raja Ki Mandi
Agra College
Medical College
Mankameshwar
Dr. Ambedkar Chowk
Taj Mahal
Fatehabad Road
Shaheed Captain
Shubham Gupta
Taj East Gate

The Yellow Line (Line 1) (Hindi: येलो लाइन) is a partly operational metro rail line of the Agra Metro, a rapid transit system in Agra, Uttar Pradesh, India. The first section of the line opened 6 March 2024.

In 2024, Uttar Pradesh Metro Rail Corporation (UPMRC) changed the name of Jama Masjid metro station to 'Mankameshwar metro station'.[1]

List of stations

[edit]
Yellow line
Station Status Type
English Hindi
Sikandra सिकंदरा under construction elevated
Guru Ka Taal गुरु का ताल
ISBT आई एस बी टी
RBS College आर बी एस कॉलेज underground
Raja Ki Mandi राजा की मंडी
Agra College आगरा कॉलेज
Medical College मेडिकल कॉलेज
Mankameshwar मनः कामेश्वर opened 6 March 2024
Dr. Ambedkar Chowk डॉ. अम्बेडकर चौक
Taj Mahal ताज महल
Fatehabad Road फतेहाबाद रोड elevated
Shaheed Captain Shubham Gupta शहीद कैप्टन शुभम गुप्ता
Taj East Gate ताज ईस्ट गेट

See also

[edit]

References

[edit]
  1. ^ "Agra's Jama Masjid Metro station gets renamed as Mankameshwar". The Times of India. 21 February 2024. ISSN 0971-8257. Retrieved 26 February 2024.