Jump to content

Sabarmati Railway Station metro station

Coordinates: 23°04′11″N 72°35′16″E / 23.06979°N 72.58777°E / 23.06979; 72.58777
From Wikipedia, the free encyclopedia

Sabarmati Railway Station
Ahmedabad Metro station
General information
LocationRam Nagar, Sabarmati, Ahmedabad, Gujarat 380005
Coordinates23°04′11″N 72°35′16″E / 23.06979°N 72.58777°E / 23.06979; 72.58777
Owned byGujarat Metro Rail Corporation Limited
Operated byAhmedabad Metro
Line(s)Red Line
PlatformsSide platform
Platform-1 → Motera Stadium
Platform-2 → APMC
Tracks2
ConnectionsMainline rail interchange Sabarmati Junction
Construction
Structure typeElevated, Double track
Platform levels2
AccessibleYes Disabled access
Other information
StatusOperational
History
Opening6 October 2022; 2 years ago (6 October 2022)
Electrified750 V DC third rail
Services
Preceding station Ahmedabad Metro Following station
AEC Red Line Ranip
towards APMC
Location
Map

Sabarmati Railway Station is an important elevated metro station on the North-South Corridor of the Red Line of Ahmedabad Metro in Ahmedabad, India. This metro station holds the main Sabarmati Junction railway station for passengers to depart towards Gandhinagar Capital in the northern side or towards Ahmedabad Junction in the southern side.[1] This phase of the metro was inaugurated on 30 September 2022 by Prime Minister Narendra Modi[2] and was opened to the public on 6 October 2022.[3][4][5]

Station layout

[edit]
Sabarmati Railway Station track layout
to AEC
P1
P2
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 2
Southbound
Towards → APMC next station is Ranip
Platform 1
Northbound
Towards ← Motera Stadium next station is AEC
Side platform | Doors will open on the left Disabled access
L2

Entry/Exit

[edit]

See also

[edit]

References

[edit]
  1. ^ "Ahmedabad: Metro service on North-South corridor to begin on October 6". The Indian Express. 3 October 2022. Retrieved 12 August 2023.
  2. ^ "Ahmedabad: North-South corridor metro service to be operational from October 6". TimesNow. 5 October 2022. Retrieved 12 August 2023.
  3. ^ "Ahmedabad: Metro service on North-South corridor to begin on October 6". The Indian Express. 3 October 2022. Retrieved 12 August 2023.
  4. ^ "Huge demand on Day 1 of Ahmedabad Metro". The Indian Express. 2 October 2022. Retrieved 4 October 2022.
  5. ^ "Prime Minister Modi inaugurates phase-1 of Ahmedabad Metro rail project". The Economic Times. Retrieved 4 October 2022.
[edit]