Jump to content

ICE TD: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
m Second Train as advanced TrainLab in operation now
m Syntax
 
(28 intermediate revisions by 15 users not shown)
Line 4: Line 4:
{{Infobox train
{{Infobox train
| name = DBAG Class 605
| name = DBAG Class 605
| image = File:ICE-TD at Roskilde Station 01.jpg
| image = DB_605_007_KB.jpg
| caption = ICE TD trainset
| imagesize = 300px
| interiorimage = ICE TD 2.Klasse.jpg
| caption = An ICE TD train at [[Roskilde station]] in August 2017
| interiorcaption = Second class interior
| background =
| background =
| manufacturer = [[Bombardier Transportation|Bombardier]]/[[Siemens AG|Siemens]]
| manufacturer = [[Bombardier Transportation|Bombardier]]/[[Siemens AG|Siemens]]
Line 19: Line 20:
| carbody = [[Steel]]
| carbody = [[Steel]]
| width =
| width =
| maxspeed = {{convert|200|km/h|abbr=on|sigfig=3}}
| maxspeed = {{convert|200|km/h|abbr=on|round=5}}
| brakes = [[Dynamic braking|Rheostatic]]
| brakes = [[Dynamic braking|Rheostatic]]
| transmission = [[Diesel-electric transmission]]
| transmission = [[Diesel-electric transmission]]
Line 30: Line 31:
| art-sections = Flexible diaphragm (within unit only)
| art-sections = Flexible diaphragm (within unit only)
| coupling = [[Dellner coupling|Dellner]]<ref>[http://www.railway-technology.com/contractors/brakes/dellner/ Dellner Couplers AB&nbsp;&ndash; Automatic and Semi-Permanent Couplers]</ref>{{failed verification|date=April 2021}}
| coupling = [[Dellner coupling|Dellner]]<ref>[http://www.railway-technology.com/contractors/brakes/dellner/ Dellner Couplers AB&nbsp;&ndash; Automatic and Semi-Permanent Couplers]</ref>{{failed verification|date=April 2021}}
| uicclass = 2&prime;Bo&prime;+Bo&prime;2&prime;+2&prime;Bo&prime;+Bo&prime;2&prime;
| uicclass = 2{{prime}}Bo{{prime}}+Bo{{prime}}2{{prime}}+2{{prime}}Bo{{prime}}+Bo{{prime}}2{{prime}}
}}
}}


The '''DBAG Class 605''', commonly known as the '''ICE&nbsp;TD''' is a high-speed [[diesel multiple unit]] (DMU) train, formerly in service with [[Deutsche Bahn]] and [[DSB (railway company)|DSB]].
The '''DBAG Class 605''', commonly known as the '''ICE&nbsp;TD''' is a high-speed [[diesel multiple unit]] (DMU) train, formerly in service with [[Deutsche Bahn]] and [[DSB (railway company)|DSB]]. It was retired from active passenger service in 2017 after years of operational issues with one trainset being kept and repurposed as a technology testbed.


==History==
==History==
Line 50: Line 51:
As for the [[ICE T]], DWA (Bombardier) produced the end cars and Siemens produced the middle cars. The ICE TD was fitted with an electro-mechanic tilting actuator system developed by Siemens, rather than the Fiat (Alstom) Pendolino hydraulic system used in the ICE T. Also, the secondary suspension between bogie and carbody is air springs rather than metal coils for higher ride comfort.<ref name="HGZICTD"/> A characteristic element of the Siemens system visible on the outside is the crescent-shaped top of the outer carbody supports (above the bogie center).
As for the [[ICE T]], DWA (Bombardier) produced the end cars and Siemens produced the middle cars. The ICE TD was fitted with an electro-mechanic tilting actuator system developed by Siemens, rather than the Fiat (Alstom) Pendolino hydraulic system used in the ICE T. Also, the secondary suspension between bogie and carbody is air springs rather than metal coils for higher ride comfort.<ref name="HGZICTD"/> A characteristic element of the Siemens system visible on the outside is the crescent-shaped top of the outer carbody supports (above the bogie center).


The tilting system also left room for electric motors on both axles in a bogie, thus every car of the [[Diesel-electric transmission|diesel-electric]] train has an unpowered bogie and a powered bogie (2&prime;Bo&prime; configuration).<ref name="HGZICTD">{{cite web |url=http://www.hochgeschwindigkeitszuege.com/germany/index_ice_td.htm |title=ICE-TD |publisher=hochgeschwindigkeitszuege.com |language=de |access-date=2009-01-19 |url-status=dead |archive-url=https://web.archive.org/web/20090119082505/http://hochgeschwindigkeitszuege.com/germany/index_ice_td.htm |archive-date=2009-01-19 }}</ref> The power for the electric motors of the class 605 is generated by four diesel engines, one on each car, with 560&nbsp;kW power each. These engines are based on engines for [[truck]]s. Electrically, the two halves of the train form two independent power units of two cars each, with the theoretical possibility of the addition of a fifth car as middle trailer.
The tilting system also left room for electric motors on both axles in a bogie, thus every car of the [[Diesel-electric transmission|diesel-electric]] train has an unpowered bogie and a powered bogie (2{{prime}}Bo{{prime}} configuration).<ref name="HGZICTD">{{cite web |url=http://www.hochgeschwindigkeitszuege.com/germany/index_ice_td.htm |title=ICE-TD |publisher=hochgeschwindigkeitszuege.com |language=de |access-date=2009-01-19 |url-status=dead |archive-url=https://web.archive.org/web/20090119082505/http://hochgeschwindigkeitszuege.com/germany/index_ice_td.htm |archive-date=2009-01-19 }}</ref> The power for the electric motors of the class 605 is generated by four diesel engines, one on each car, with 560&nbsp;kW power each. These engines are based on engines for [[truck]]s. Electrically, the two halves of the train form two independent power units of two cars each, with the theoretical possibility of the addition of a fifth car as middle trailer.


The first train was assembled in 1998, trials on track started in April 1999. During a test run on 13 January 2000, 222&nbsp;km/h was achieved.<ref name="HGZICTD"/>
The first train was assembled in 1998, trials on track started in April 1999. During a test run on 13 January 2000 with train set 5502, {{Cvt|222|km/h}} was achieved.<ref name="HGZICTD"/>


Shortly before the first IC&nbsp;T entered service in 1999, the names of the electric and diesel trains were changed to ''ICE T'' and ''ICE TD'' respectively, with "T" now standing either for the English word ''[[Tilting train|tilt(ing)]]'' or the German ''Triebzug'' (''trainset'', trains with underfloor-engines as opposed to the older ICEs which consisted of carriages coupled between locomotives), and "TD" for ''tilt(ing) / trainset diesel''.
Shortly before the first IC&nbsp;T entered service in 1999, the names of the electric and diesel trains were changed to ''ICE T'' and ''ICE TD'' respectively, with "T" now standing either for the English word ''[[Tilting train|tilt(ing)]]'' or the German ''Triebzug'' (''trainset'', trains with underfloor-engines as opposed to the older ICEs which consisted of carriages coupled between locomotives), and "TD" for ''tilt(ing) / trainset diesel''.


===Operations===
===Operations===
[[File:Berlin Ost ICE 35-380 Koebenhavn-Flensburg (15526191579).jpg|thumb|An ICE TD trainset in [[DSB (railway company)|DSB]] livery on route from [[Berlin]] to [[Copenhagen]] (2014).]]
[[File:ICE_TD_2.Klasse.jpg|thumb|2nd class interior of the ICE TD]]
In 2001, all 20 units were commissioned for Deutsche Bahn, who took them as class 605. After pilot runs, the trains entered regular service on the new ICE line 17 between [[Dresden]] and [[Nuremberg]] on 10 June 2001. Shortly after, the trains were also used between [[Munich]] and [[Zurich]] as a replacement for [[EuroCity]] trains. Both of these routes between the major cities are partially not electrified, explaining the usage of diesel powered trains.
In 2001, all 20 units were commissioned for Deutsche Bahn, who numbered them as class 605. After pilot runs, the trains entered regular service on the new ICE line 17 between [[Dresden]] and [[Nuremberg]] from 10 June 2001. Shortly after, they were also used between [[Munich]] and [[Zurich]] as a replacement for [[EuroCity]] trains. Both of these routes between major cities are partially not electrified, which explains the usage of the diesel powered trains.


The service life of the class 605 was rather ill-fated. The ICE TD units were plagued by technical problems from the start. After the breaking of an axle on 2 December 2002, all remaining 19 units (one fell off a working platform during maintenance) were grounded. Even though one year later the trains were admitted to service again, DB judged their operation to be overly expensive. DB must pay full [[Fuel tax|diesel tax]] for the fuel.
The service life of the class 605 ICE TD units was rather ill-fated. They were plagued by technical problems from the start. After the breaking of an axle on 2 December 2002, all the remaining 19 units (one fell off a working platform during maintenance) were taken out of service and although the trains were placed back service one year later, DB judged their operation to be overly expensive. DB is required to pay full [[Fuel tax|diesel tax]] for the fuel.


The trains were re-activated for a short time in anticipation of extra traffic during the [[2006 FIFA World Cup]] in Germany. From 2006, they were used for charter and relief trains.
After four years of storage, the trains were re-activated for a short while, in anticipation of extra traffic during the [[2006 FIFA World Cup]] being held in Germany. After this, they were used for charter and relief trains.


From the end of 2007, the class 605 was used in regular service on the [[Berlin]]&ndash;[[Hamburg]]&ndash;[[Copenhagen]] route, as a replacement for the Danish [[IC3]] trains in Hamburg&ndash;Copenhagen service ([[Vogelfluglinie]]), due to delays in the introduction of [[DSB (railway company)|DSB]]'s [[IC4]] trains caused by technical problems. The ten class 605 used in these services were equipped with the Danish [[Automatic Train Control|ATC]] safety system. From 2008, the Denmark-compatible 605 were also used for Berlin&ndash;Hamburg&ndash;[[Aarhus]] services (previously, IC3 was used on the [[Flensburg]]&ndash;[[Aarhus]] route, and regional trains on Hamburg&ndash;Flensburg services). From mid-2009, three more ICE-TD units were used on Germany&ndash;Denmark services, allowing DSB to free up more IC3 trains for domestic use.<ref>{{cite web |url=http://193.28.147.158/Om-DSB/Presse/Pressemeddelelser/DSB-skaffer-nye-tog-til-sjallandske-pendlere/ |title=DSB skaffer nye tog til sjællandske pendlere |date=2008-10-14 |language=da |publisher=[[Danske Statsbaner]] |access-date=2009-03-03}}</ref>
From the end of 2007, class 605 trains were used in regular service on the [[Berlin]]&ndash;[[Hamburg]]&ndash;[[Copenhagen]] route, as a replacement for the Danish [[DSB Class MF|IC3]] trains in Hamburg&ndash;Copenhagen service ([[Vogelfluglinie]]), due to delays in the introduction of [[DSB (railway company)|DSB]]'s [[IC4]] trains which were caused by technical problems. The ten class 605 used on these services were equipped with the Danish [[Automatic Train Control|ATC]] safety system. From 2008, the Denmark-compatible 605 were also used for Berlin&ndash;Hamburg&ndash;[[Aarhus]] services (previously, IC3 was used on the [[Flensburg]]&ndash;[[Aarhus]] route, and regional trains on Hamburg&ndash;Flensburg services). From mid-2009, three more ICE-TD units were used on Germany&ndash;Denmark services, allowing DSB to free up more IC3 trains for domestic use.<ref>{{cite web |url=http://193.28.147.158/Om-DSB/Presse/Pressemeddelelser/DSB-skaffer-nye-tog-til-sjallandske-pendlere/ |title=DSB skaffer nye tog til sjællandske pendlere |date=2008-10-14 |language=da |publisher=[[Danske Statsbaner]] |access-date=2009-03-03 |archive-date=29 May 2011 |archive-url=https://web.archive.org/web/20110529140838/http://193.28.147.158/Om-DSB/Presse/Pressemeddelelser/DSB-skaffer-nye-tog-til-sjallandske-pendlere/ |url-status=dead }}</ref>


===Demise===
On 11 December 2016, most class 605 trainsets were taken out of service. DB did not want to invest in the necessary major overhaul procedure where all components are checked and replaced if needed. DSB was offered the opportunity to buy the trainsets, but declined to do so.<ref name="ts15062015">{{cite web |last=Kurpjuweit |first=Klaus |url=http://www.tagesspiegel.de/berlin/deutsche-bahn-direktverbindung-nach-daenemark-droht-das-aus/11915488.html |title=Direktverbindung nach Dänemark droht das Aus |trans-title=Direct service to Denmark threatened with closure |date=June 15, 2015 |language=German |work=[[Der Tagesspiegel]] |archive-url=https://web.archive.org/web/20201001060941/https://www.tagesspiegel.de/berlin/deutsche-bahn-direktverbindung-nach-daenemark-droht-das-aus/11915488.html |archive-date=October 1, 2020 |url-status=live}}</ref> The trains suffered from overall high maintenance and operation costs.<ref name="rj01062015">{{cite web |last=Fender |first=Keith |url=http://www.railjournal.com/index.php/rolling-stock/dsb-to-withdraw-ice-td-fleet-as-db-terminates-lease.html |url-access=limited |title=DSB to withdraw ICE-TDs as DB terminates lease |work=[[International Railway Journal]] |language=English |date=1 June 2015 |archive-url=https://web.archive.org/web/20180519082028/http://www.railjournal.com/index.php/rolling-stock/dsb-to-withdraw-ice-td-fleet-as-db-terminates-lease.html |archive-date=March 19, 2018 |url-status=live}}</ref> The ''Vogelfluglinie'' between Hamburg and Copenhagen continues to be operated with Danish [[IC3]] trainsets as well as the Aarhus-Hamburg route, however both with fewer departures. One single remaining ICE TD trainset was operated on the Hamburg-Copenhagen route until 1 October 2017 and then also retired.<ref>{{cite web |url=https://community.bahn.de/questions/1191214-ice-td-kopenhagen |title=ICE-TD nach Kopenhagen |archive-url=https://web.archive.org/web/20181118123006/https://community.bahn.de/questions/1191214-ice-td-kopenhagen |language=German |website=community.bahn.de |archive-date=November 18, 2018 |url-status=dead}}</ref>{{unreliable source|date=April 2021}}
[[File:20230916.Advanced TrainLab.-012.jpg|thumb|The sole remaining Class 605 trainset has been repurposed as the ''advanced TrainLab'' (2023).]]
On 11 December 2016, most class 605 trainsets were taken out of service. DB did not want to invest in the necessary major overhaul procedure where all components are checked and replaced if needed. DSB was offered the opportunity to buy the trainsets, but declined to do so.<ref name="ts15062015">{{cite web |last=Kurpjuweit |first=Klaus |url=http://www.tagesspiegel.de/berlin/deutsche-bahn-direktverbindung-nach-daenemark-droht-das-aus/11915488.html |title=Direktverbindung nach Dänemark droht das Aus |trans-title=Direct service to Denmark threatened with closure |date=June 15, 2015 |language=German |work=[[Der Tagesspiegel]] |archive-url=https://web.archive.org/web/20201001060941/https://www.tagesspiegel.de/berlin/deutsche-bahn-direktverbindung-nach-daenemark-droht-das-aus/11915488.html |archive-date=October 1, 2020 |url-status=live}}</ref> The trains suffered from overall high maintenance and operation costs.<ref name="rj01062015">{{cite web |last=Fender |first=Keith |url=http://www.railjournal.com/index.php/rolling-stock/dsb-to-withdraw-ice-td-fleet-as-db-terminates-lease.html |url-access=limited |title=DSB to withdraw ICE-TDs as DB terminates lease |work=[[International Railway Journal]] |language=English |date=1 June 2015 |archive-url=https://web.archive.org/web/20180519082028/http://www.railjournal.com/index.php/rolling-stock/dsb-to-withdraw-ice-td-fleet-as-db-terminates-lease.html |archive-date=19 May 2018 |url-status=live}}</ref> The ''Vogelfluglinie'' between Hamburg and Copenhagen continues to be operated with Danish [[DSB Class MF|IC3]] trainsets as well as the Aarhus-Hamburg route, however both with fewer departures. One single remaining ICE TD trainset was operated on the Hamburg-Copenhagen route until 1 October 2017 and then also retired.<ref>{{cite web |url=https://community.bahn.de/questions/1191214-ice-td-kopenhagen |title=ICE-TD nach Kopenhagen |archive-url=https://web.archive.org/web/20181118123006/https://community.bahn.de/questions/1191214-ice-td-kopenhagen |language=German |website=community.bahn.de |archive-date=November 18, 2018 |url-status=dead}}</ref>{{unreliable source|date=April 2021}}


As of 2019, DB was in the process to gradually scrap most of the remaining ICE TD trainsets.
605 017 entered non-passenger service as a test train in February 2019, 605 019 followed in August 2021.<ref name="bw19042019">{{cite web |last=Martin |first=Ulrike |url=https://www.berliner-woche.de/steglitz-zehlendorf/c-verkehr/laborzug-absolviert-testfahrt-auf-der-alten-stammbahntrasse_a208192 |title=Laborzug absolviert Testfahrt auf der alten Stammbahntrasse |trans-title=Laboratory train completed test run on old Stammbahn tracks |language=German |date=April 4, 2019 |website=Berliner Woche |publisher=FUNKE Berlin Wochenblatt |access-date=April 12, 2021 |archiveurl=https://archive.today/20210312105217/https://www.berliner-woche.de/steglitz-zehlendorf/c-verkehr/laborzug-absolviert-testfahrt-auf-der-alten-stammbahntrasse_a208192 |archivedate=12 March 2021 |url-status=live }}</ref> Named ''Advanced TrainLab'', the trains serve as a testbed for new technologies.<ref name="bw19042019"/>


605 017 entered non-public service as a test train in February 2019, 605 019 followed in August 2021.<ref name="bw19042019">{{cite web |last=Martin |first=Ulrike |url=https://www.berliner-woche.de/steglitz-zehlendorf/c-verkehr/laborzug-absolviert-testfahrt-auf-der-alten-stammbahntrasse_a208192 |title=Laborzug absolviert Testfahrt auf der alten Stammbahntrasse |trans-title=Laboratory train completed test run on old Stammbahn tracks |language=German |date=April 4, 2019 |website=Berliner Woche |publisher=FUNKE Berlin Wochenblatt |access-date=April 12, 2021 |archiveurl=https://archive.today/20210312105217/https://www.berliner-woche.de/steglitz-zehlendorf/c-verkehr/laborzug-absolviert-testfahrt-auf-der-alten-stammbahntrasse_a208192 |archivedate=12 March 2021 |url-status=live }}</ref> Named ''Advanced TrainLab'', the trains serve as a testbed for new technologies.<ref name="bw19042019"/>
<gallery>
File:渡り鳥コース_航送されICE-TD.JPG|An ICE TD aboard a ferry between [[Puttgarden]] and [[Rødby]], August 2012
File:Berlin Ost ICE 35-380 Koebenhavn-Flensburg (15526191579).jpg|An ICE TD in DSB livery, seen in November 2014
File:ICE-TD-Advanced-Train-Lab-Nürnberg-Hbf 2018-11-28.jpg|''advanced TrainLab'' at Nuremberg main station in November 2018
</gallery>


==Routes==
==Former routes==
ICE TD trainsets were, in chronological order, used on the following routes:<ref name="hochgeschwindigkeitszuege.com">[http://www.hochgeschwindigkeitszuege.com/deutschland/ice-td.php hochgeschwindigkeitszuege.com - ICE-TD der Deutschen Bahn AG] (German) retrieved 1 November 2016</ref>


* '''[[Nuremberg]]''' – [[Bayreuth]] – [[Chemnitz]] – '''[[Dresden]]''' (served June 2001 December 2003; first replaced by [[Intercity (Deutsche Bahn)|Intercity]] and then [[Regional-Express]] trains)<ref name="hochgeschwindigkeitszuege.com"/>
===Former routes===
* '''[[Munich]]''' – [[Lindau]] – '''[[Zürich]]''' (served June 2001 December 2003; replaced by [[EuroCity]] trains)
ICE TD trainsets were used on the following routes:<ref name="hochgeschwindigkeitszuege.com">[http://www.hochgeschwindigkeitszuege.com/deutschland/ice-td.php hochgeschwindigkeitszuege.com - ICE-TD der Deutschen Bahn AG] (German) retrieved 1 November 2016</ref>
* ([[Berlin]] ) '''[[Hamburg]]''' – [[Flensburg]] – '''[[Aarhus]]''' (served December 2007 December 2016; replaced by [[DSB Class MF|IC3]] trainsets)

* '''Hamburg''' – [[Lübeck]] – [[Puttgarden]] – [[Rødby]] – '''[[Copenhagen]]''' (served December 2007 - September 2017)
* '''Hamburg''' – [[Lübeck]] – [[Puttgarden]] – [[Rødby]] – '''[[Copenhagen]]''' (served December 2007 September 2017)
* '''[[Nuremberg]]''' – [[Bayreuth]] – [[Chemnitz]] – '''[[Dresden]]''' (served June 2001 - December 2003; first replaced by [[Intercity (Deutsche Bahn)|Intercity]] and then [[Regional-Express]] trains)<ref name="hochgeschwindigkeitszuege.com"/>
* '''[[Munich]]''' – [[Lindau]] – '''[[Zürich]]''' (served June 2001 - December 2003; replaced by [[EuroCity]] trains)
* ([[Berlin]] -) '''[[Hamburg]]''' – [[Flensburg]] – '''[[Aarhus]]''' (served December 2007 - December 2016; replaced by [[IC3]] trainsets)


==See also==
==See also==
Line 90: Line 87:
* [[Intercity-Express|Description of the Intercity-Express system in Germany]]
* [[Intercity-Express|Description of the Intercity-Express system in Germany]]
* [[Tilting train#Germany|Abstract on tilting trains in Germany]]
* [[Tilting train#Germany|Abstract on tilting trains in Germany]]
* [[ICE T|ICE T: the electric sister classes]]
* [[ICE T]]
* [[Intercity Express]]


==References==
==References==
Line 110: Line 108:
[[Category:Tilting trains]]
[[Category:Tilting trains]]
[[Category:Passenger trains running at least at 200 km/h in commercial operations]]
[[Category:Passenger trains running at least at 200 km/h in commercial operations]]
[[Category:Bombardier Transportation multiple units]]
[[Category:Train-related introductions in 2001]]

Latest revision as of 23:02, 20 August 2024

DBAG Class 605
ICE TD trainset
Second class interior
In service2001–2017 (passenger service)
2019–present (test train)
ManufacturerBombardier/Siemens
Constructed1998–2000
Number built20 trainsets
Formation4 cars per trainset
Capacity154 standard class, 41 first class
OperatorsDB Fernverkehr
DSB
Specifications
Car body constructionSteel
Articulated sectionsFlexible diaphragm (within unit only)
Maximum speed200 km/h (125 mph)
Weight232 t (228 long tons; 256 short tons)
Traction systemDEMU
Prime mover(s)Cummins QSK19 (four engines)
Power output4 × 560 kilowatts (750 hp) = 3,000 hp (2,200 kW) at 1,800 rpm
TransmissionDiesel-electric transmission
UIC classification2Bo+Bo2+2Bo+Bo2
Braking system(s)Rheostatic
Safety system(s)Sifa, PZB90, LZB, Eurobalise
Coupling systemDellner[1][failed verification]
Track gauge1,435 mm (4 ft 8+12 in) standard gauge

The DBAG Class 605, commonly known as the ICE TD is a high-speed diesel multiple unit (DMU) train, formerly in service with Deutsche Bahn and DSB. It was retired from active passenger service in 2017 after years of operational issues with one trainset being kept and repurposed as a technology testbed.

History

[edit]

Development

[edit]

Following the successful inauguration of the Intercity-Express system in 1991 and the order to develop the ICE 2, in 1994 DB started plans to upgrade long-distance services using conventional lines, with comfort level raised near the ICE standard and higher speeds, with tilting electric multiple units to replace locomotive-pulled InterCity (IC) and InterRegio (IR) trains. DB assigned the name IC T to the project, with "T" standing for Triebzug (multiple unit). This development resulted in the ICE T.

Later, Deutsche Bahn also saw the need for a similar new train on its non-electrified routes, and started the ICT-VT project, with "VT" standing for Verbrennungstriebwagen (internal combustion motor car).

Deutsche Bahn pursued the development of the ICE 3, IC T and ICT-VT projects in parallel. The trains share a general styling concept, most prominently a lounge section in the front cars with a view forward at the tracks, being separated only by a glass wall from the driver's compartment. Technically, the trains share a lot of components and technical layout, as well as the concept of distributed traction: in contrast to the ICE 1 and ICE 2 designs, the new units were planned not with powerheads, but with peripheral underfloor motors, in order to reduce axle load (quite important for tilting trains) and increase tractive effort.

For the ICT-VT, a four-car configuration was chosen, without a restaurant car, otherwise, Deutsche Bahn aimed for a common appearance and the greatest possible technical commonality with the IC T. Even the possibility of coupling together an electric and diesel train and operate them jointly was to be provided.

Production

[edit]

In 1996, Deutsche Bahn placed an order for 20 diesel multiple units with a consortium led by Siemens.

As for the ICE T, DWA (Bombardier) produced the end cars and Siemens produced the middle cars. The ICE TD was fitted with an electro-mechanic tilting actuator system developed by Siemens, rather than the Fiat (Alstom) Pendolino hydraulic system used in the ICE T. Also, the secondary suspension between bogie and carbody is air springs rather than metal coils for higher ride comfort.[2] A characteristic element of the Siemens system visible on the outside is the crescent-shaped top of the outer carbody supports (above the bogie center).

The tilting system also left room for electric motors on both axles in a bogie, thus every car of the diesel-electric train has an unpowered bogie and a powered bogie (2Bo configuration).[2] The power for the electric motors of the class 605 is generated by four diesel engines, one on each car, with 560 kW power each. These engines are based on engines for trucks. Electrically, the two halves of the train form two independent power units of two cars each, with the theoretical possibility of the addition of a fifth car as middle trailer.

The first train was assembled in 1998, trials on track started in April 1999. During a test run on 13 January 2000 with train set 5502, 222 km/h (138 mph) was achieved.[2]

Shortly before the first IC T entered service in 1999, the names of the electric and diesel trains were changed to ICE T and ICE TD respectively, with "T" now standing either for the English word tilt(ing) or the German Triebzug (trainset, trains with underfloor-engines as opposed to the older ICEs which consisted of carriages coupled between locomotives), and "TD" for tilt(ing) / trainset diesel.

Operations

[edit]
An ICE TD trainset in DSB livery on route from Berlin to Copenhagen (2014).

In 2001, all 20 units were commissioned for Deutsche Bahn, who numbered them as class 605. After pilot runs, the trains entered regular service on the new ICE line 17 between Dresden and Nuremberg from 10 June 2001. Shortly after, they were also used between Munich and Zurich as a replacement for EuroCity trains. Both of these routes between major cities are partially not electrified, which explains the usage of the diesel powered trains.

The service life of the class 605 ICE TD units was rather ill-fated. They were plagued by technical problems from the start. After the breaking of an axle on 2 December 2002, all the remaining 19 units (one fell off a working platform during maintenance) were taken out of service and although the trains were placed back service one year later, DB judged their operation to be overly expensive. DB is required to pay full diesel tax for the fuel.

After four years of storage, the trains were re-activated for a short while, in anticipation of extra traffic during the 2006 FIFA World Cup being held in Germany. After this, they were used for charter and relief trains.

From the end of 2007, class 605 trains were used in regular service on the BerlinHamburgCopenhagen route, as a replacement for the Danish IC3 trains in Hamburg–Copenhagen service (Vogelfluglinie), due to delays in the introduction of DSB's IC4 trains which were caused by technical problems. The ten class 605 used on these services were equipped with the Danish ATC safety system. From 2008, the Denmark-compatible 605 were also used for Berlin–Hamburg–Aarhus services (previously, IC3 was used on the FlensburgAarhus route, and regional trains on Hamburg–Flensburg services). From mid-2009, three more ICE-TD units were used on Germany–Denmark services, allowing DSB to free up more IC3 trains for domestic use.[3]

Demise

[edit]
The sole remaining Class 605 trainset has been repurposed as the advanced TrainLab (2023).

On 11 December 2016, most class 605 trainsets were taken out of service. DB did not want to invest in the necessary major overhaul procedure where all components are checked and replaced if needed. DSB was offered the opportunity to buy the trainsets, but declined to do so.[4] The trains suffered from overall high maintenance and operation costs.[5] The Vogelfluglinie between Hamburg and Copenhagen continues to be operated with Danish IC3 trainsets as well as the Aarhus-Hamburg route, however both with fewer departures. One single remaining ICE TD trainset was operated on the Hamburg-Copenhagen route until 1 October 2017 and then also retired.[6][unreliable source?]

As of 2019, DB was in the process to gradually scrap most of the remaining ICE TD trainsets.

605 017 entered non-public service as a test train in February 2019, 605 019 followed in August 2021.[7] Named Advanced TrainLab, the trains serve as a testbed for new technologies.[7]

Former routes

[edit]

ICE TD trainsets were, in chronological order, used on the following routes:[8]

See also

[edit]

References

[edit]
  1. ^ Dellner Couplers AB – Automatic and Semi-Permanent Couplers
  2. ^ a b c "ICE-TD" (in German). hochgeschwindigkeitszuege.com. Archived from the original on 19 January 2009. Retrieved 19 January 2009.
  3. ^ "DSB skaffer nye tog til sjællandske pendlere" (in Danish). Danske Statsbaner. 14 October 2008. Archived from the original on 29 May 2011. Retrieved 3 March 2009.
  4. ^ Kurpjuweit, Klaus (15 June 2015). "Direktverbindung nach Dänemark droht das Aus" [Direct service to Denmark threatened with closure]. Der Tagesspiegel (in German). Archived from the original on 1 October 2020.
  5. ^ Fender, Keith (1 June 2015). "DSB to withdraw ICE-TDs as DB terminates lease". International Railway Journal. Archived from the original on 19 May 2018.
  6. ^ "ICE-TD nach Kopenhagen". community.bahn.de (in German). Archived from the original on 18 November 2018.
  7. ^ a b Martin, Ulrike (4 April 2019). "Laborzug absolviert Testfahrt auf der alten Stammbahntrasse" [Laboratory train completed test run on old Stammbahn tracks]. Berliner Woche (in German). FUNKE Berlin Wochenblatt. Archived from the original on 12 March 2021. Retrieved 12 April 2021.
  8. ^ a b hochgeschwindigkeitszuege.com - ICE-TD der Deutschen Bahn AG (German) retrieved 1 November 2016
[edit]

Media related to ICE TD at Wikimedia Commons