The Kerjaya LRT station is a light rapid transit (LRT) station that serve the suburb of Shah Alam in Selangor, Malaysia. It serves as one of the stations on the Shah Alam line. The station is an elevated rapid transit station in Glenmarie, Shah Alam, Selangor, Malaysia, forming part of the Klang Valley Integrated Transit System.[1]
SA09 Kerjaya | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
| Future LRT station | |||||||||||
General information | |||||||||||
Location | Glenmarie, Shah Alam, Selangor Malaysia | ||||||||||
Owned by | Prasarana Malaysia | ||||||||||
Operated by | Rapid Rail | ||||||||||
Line(s) | 11 Shah Alam | ||||||||||
Platforms | 2 side platforms | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Elevated | ||||||||||
Parking | Available | ||||||||||
Other information | |||||||||||
Status | Under construction | ||||||||||
Station code | SA09 | ||||||||||
Services | |||||||||||
|
The station is marked as Station No. 9 along the RM9 billion line project with the line's maintenance depot located in Johan Setia, Klang.[2] The Kerjaya LRT station was expected to be operational in February 2024, but Transport Minister Anthony Loke mentioned that the overall line would be expected to be operational by 1st March 2025 adding more delays to the opening of the Shah Alam Line.[3] It will have facilities such as public parking, kiosks, restrooms, elevators, taxi stand and feeder bus among others.[4]
Locality landmarks
edit- Politeknik Premier Sultan Salahuddin Abdul Aziz Shah
- HICOM-Glenmarie Industrial Park
- Kolej Komuniti Shah Alam
- UOW-KDU University Malaysia
- The Glenz-Glenmarie Condominium
- Utropolis Marketplace Shopping Mall
- Utropolis Urbano residential
- Montfort Boys Town Training Institute
- Pangsapuri Sri Kerjaya
References
edit- ^ "Pelan Setiap Stesen". Prasarana Malaysia. Archived from the original on 2015-05-22. Retrieved 2015-05-17.
- ^ "Bukit Tinggi LRT Station". MRT Corp Malaysia.
- ^ "LRT3 TO START OPERATION IN MARCH 2025 - ANTHONY LOKE". BERNAMA. 2023-04-07. Retrieved 2023-07-05.
- ^ "Jangka Masa Projek LRT3". Prasarana Malaysia. Archived from the original on 2015-05-27. Retrieved 2015-05-17.