Quotation Report 2

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

4.

0 SURVEY QUOTATION
4.1 DETAIL SURVEY
Details Ref. RM
Preparatory work @ 1 party day 2.2 1960.00
Mobilization and Demobilization @ 2 party day 2.3 3920.00
Point positioning by GNSS @ 1 party day 1.4 2600.00
Demarcation of Boundaries and Planimetric Control 2.4 1724.90
- Demarcation of boundaries and planimetric control
250m @ RM 5.00 / meter = RM 1250
- Connection
94.98m @ RM 5.00 / meter = RM 474.90
Height Controls and Connections 2.5 366.22
- Around the project area
250m @ 1.6km / party day = RM 306.25
- Connection
48.959m @ 1.6km / party day = RM 59.97
Monumenting 2.6 980
Total 2 @ 4 monument / party day
Survey in security area 2.7 -
Survey in inaccessible area 2.8 -
Reimbursable 2.9 -
Topographical survey 2.10 4573.33
1.75 Ha @ 0.75 Ha / party day
Minimum fee 2.11 3920
Preparation of Land Acquisition Plan 2.12
Digital data @ 20% of total survey fees 2.13 4008.89
Transformation of coordinates 2.14
Supply of plans and documents 2.15 770
TOTAL 24823.34

4.2 DETAIL SURVEY


Details Ref. RM
Digital data @ 20% of total survey fees 2.13 4008.89
Supply of plans and documents 2.15 770.00
TOTAL 4778.89

5.3 Quotation
The quotation process is to estimate the cost of the project that are needed to pay. This is to
ensure that LJT know and pay the amount stated on the quotation. The quotation happen
before the survey work started. Each of the value that were stated on the quotation are been
calculated based on the condition of the site, the process of survey work and process of
preparing all the related documents. The information on the quotation will help to deliver the
message about the work process cost.