#BrisbaneCityCouncil Kangaroo Point Bridge reached another important milestone through June 2024, with the erection of the last bridge deck module above the Brisbane River, which occurred after the successful completion of the installation and stressing of the last of the 32 cable stays supplied by #Tensa. #RizzanideEccher has played a key role, within the Connect Brisbane Consortium led by #BESIXWatpac, since the early design phases through temporary works development, shop drawing management, construction engineering, sequencing and planning, to ultimately ensure safe and smooth delivery of the bridge elements travelling via barge from the Port of Brisbane to the City, and lift in position by heavy-lift cranes. Our team consisted of specialized and experienced staff who has also helped the BESIX Watpac team in the early engineering, modelling and planning for other areas of the project such as the restaurant on the bridge, the Plaza works at CBD area and the high-quality finishes such as golden aluminum works supported on dedicated steel structures, and stainless steel balustrades.
JIJEL ALGERIA
Fantastic update!
Great job!
Congratulations!
Sr MEP Manager , 25+ Years Driving Project Success & Efficiency
3mocongrats