๐ฅ๐ฒ๐พ๐๐ฒ๐๐ ๐ณ๐ผ๐ฟ ๐ค๐๐ฎ๐น๐ถ๐ณ๐ถ๐ฐ๐ฎ๐๐ถ๐ผ๐ป๐: ๐๐ป๐ด๐ถ๐ป๐ฒ๐ฒ๐ฟ๐ถ๐ป๐ด ๐ฆ๐ฒ๐ฟ๐๐ถ๐ฐ๐ฒ๐ ๐ณ๐ผ๐ฟ ๐๐ต๐ฒ ๐๐ฒ๐๐ถ๐น๐ ๐๐ฎ๐ธ๐ฒ ๐ข๐๐๐น๐ฒ๐๐ ๐ข๐ฝ๐ฒ๐ฟ๐ฎ๐๐ถ๐ผ๐ป DWR is soliciting submissions of qualifications from engineering firms desiring to provide professional services to the DWRโs Water Development Division. The chosen engineering firm is required to provide engineering services and assistance for maintaining the continued operations of the Devils Lake West and East Outlets and will be retained for a period up to five years starting from the contract award date. The deadline for the submittal is January 23, 2024, 5:00 PM Central Standard Time. The complete Request for Qualifications can be accessed here: https://lnkd.in/gCPqCB7i
North Dakota Department of Water Resourcesโ Post
More Relevant Posts
-
Lesson To Learned of Cisundawu Toll Road affected by Landslide: First is the detailed geotechnical field investigation, where borehole drilling, standardย penetration testsย (SPTs), and trialย pit excavationย were conductedย properly? Second is the field monitoring program conducted to assess the in-situย hydrologic changesย in the soil using real-time measurements of rainfall and volumetric water content of the soil? Third is Compacted backfill soil or original soil done satisfactory and DCP done by per layer of compaction? Fourth is Soil Stabilization done correctly? I Love to hear and have any comment from all of professional involved in Road Construction or Engineering.
To view or add a comment, sign in
-
Groundwater control and dewatering are critical aspects of many construction projects, ensuring that sites remain dry and workable throughout the building process. However, choosing the right groundwater control and dewatering company can be a daunting task. To help streamline the selection process, itโs essential to consider several key factors before making a decision. https://bit.ly/4dkqNB2
To view or add a comment, sign in
-
In general, in a water supply pipeline project, due to weak gps signals, we use these cameras to maintain work accuracy. Especially in the next phases, that is, soil regulation of the canal floor and piping and implementation of air discharge basins and drainages. #surveying #survey #surveyor #pipeline #waterpipe #licacams #gps #accuracy #civil #engineering
To view or add a comment, sign in
-
Our new build services start right from conducting feasibility studies and arriving at a right solution for your maritime needs. Some of the service inter alia include the following : -Feasibility Studies -Concept Designย /Preliminary Design -Detailed Engineering -Conversion and Refurbishment Engineering (e.g. Life Extension, Vessel Type Conversion) -Material Selection and Corrosion Engineering -Retrofit Engineering (eg: Scrubber, Ballast Water Treatment Systems, etc.) -Yard Selection/audit -Bid Management -New Build Supervision -Complete Project Management for your Newbuild or Conversion Project Contact Us: [email protected] Visit Us: https://floatsys.com Phone: +1 (346) 410 0991 #MaritimeEngineering #ShipDesign #NewBuildServices #FeasibilityStudies #ProjectManagement #ShipyardSelection #RetrofitEngineering #ConversionProjects #EngineeringSolutions #VesselRefurbishment #BidManagement #CorrosionEngineering #EnvironmentalCompliance #ConstructionSupervision #NavalArchitecture #MaritimeIndustry #Shipbuilding #EngineeringExcellence #SustainableShipping #InnovationAtSea #VesselTechnology #ProjectConsultancy #QualityControl #EfficiencySolutions #SeafaringSolutions #OceanEngineering #ShipLifecycle #GlobalShipping #MarineTechnology #FutureOfShipping #floatsys #marineengineering #elearning
Newbuild/ Conversion Services | FloatSys
To view or add a comment, sign in
-
Project Manager with a talent for integration and coordination, leading projects across multiple business areas. Let my expertise help drive your next project to success.
๐ง The Importance of Pile Driving in Infrastructure Projects ๐ง The pile driving phase is critical in any infrastructure project. In our current initiative, we are utilizing piles to enhance the soil's bearing capacity and support the water storage tanks. This is a prime example of how geotechnical engineering and project management work together to ensure project success! Effective Project Planning In the initial stages of this project, we conducted a thorough site investigation, including soil testing and geological surveys. This essential data informed the development of a detailed design for the foundation system. By carefully planning and coordinating all aspects of the project, we aim to minimize risks and ensure timely completion within budget. #geotechnicalengineering #projectmanagement #construction #watertreatmentplant #Consultant
To view or add a comment, sign in
-
Project Well Development Program Multidiscipline : - EarthWork Civil Construction - Structure Civil Construction - Electrical Instrumen Construction - Pipeline Construction Oil,Gas,Water - Pipeline Coating System Construction
To view or add a comment, sign in
-
Retrieving Substrata (rock and soil) Sample During Borehole Drilling in a geotechnical investigation exercise. The sample will be subjected to the following tests: โขDensity moisture relationship โขSieve analysis โขAtterberg limits โขShear box test โขConsolidation โขPoint Load Test on rock sample โขUniaxial Compressive Strength Test on rock specimen โขChemical analysis of Groundwater-pH, chlorides and sulphates Captured in the footage is an active site in Kiambu๐ฐ๐ช We are a leading Engineering and Project Management Firm. We bring together an exemplary team of construction professionals with vast experience in the built environment to deliver any design and build project brief. We partner with quantity surveyors, engineers, architects, project managers and contractors to guarantee optimum actualization of every project brief. We are FOS Engineering Solutions #UsidanganyweNaFundi #AskFOS #ArchitecturalDesign #Consolidation #CivilEngineering #LandscapeArchitecture #EngineeringInspection #BuildingConstruction #StructuralEngineering #Borehole #Coreboxes #ProjectManagement #AtterbergLimits #Concreting #EngineeringSurvey #DensityMoistureRelationship #Logging #SteelFixing #CivilEngineer #EngineeringInspection #DrillingRig #GeotechnicalInvestigation
To view or add a comment, sign in
-
The FSR and/or SWM also state how much surface water needs to be retained on site during a storm event, how groundwater is managed, how much wastewater is estimated to be generated on-site, etc. Some of this information is derived from the design. For example, the number and size of units translate to the amount of wastewater through established formulas. But some of the information requires external studies, notably Hydrogeological (sometimes part of a Geotechnical), Downstream Analysis, Hydrant Flow Test, and sometimes Slope Stability and\or Water Quality Reports. Without information found in such studies, Civil Engineers may not be able to deliver a Civil package for submission. Since this is a core part of SPA submissions, failing to provide the Civil engineer with studies in a timely fashion may cause significant delays to the SPA timeline. Read more ๐ https://lttr.ai/ASGI2
To view or add a comment, sign in
-
Geotechnical instrumentation and monitoring, along with geo-hazard assessments and geotechnical surveys, play an important role in safeguarding assets and infrastructure. Properly planned geotechnical surveys are, along with monitoring programs, of paramount importance in identifying potential hazards and risks. #applusportugal #applus #riportico #riporticoengenharia #instrumentationandmonitoring
Geotechnical Instrumentation and Monitoring
applus.com
To view or add a comment, sign in
-
DM CIVIL PIPELINES: A COMPANY HISTORY continued. Chapter 7 โ Stirling Trunk Main Duplication Stirling Trunk Main Duplication DN1400 โ Shire of Harvey In 2012, DM Civil was awarded a contract to install a 23 kilometre long duplication of the existing DN1400 Stirling Trunk Main (STM) starting from Clifton Road west of Yarloop, up to Fishermans Road west of Coolup. The pipeline was designed to allow Water Corporation an increased hydraulic capacity to take water from the upgraded Southern Seawater Desalination Plant. The installation of the DN1400 pipework duplication was carried out while the STM was in full operation. Accordingly, asset protection measures were second only to safety, and we worked in partnership with the STM operator for the entire project to ensure that the main remained undamaged and fully functional. The contract scope was to install the DN1400 MSCL pipework including DN1200 section valves, along with a cross-connection to the existing surge vessel protection, connection to a DN300 local water supply and electrical protection (CP and VM). Pasture reinstatement, stock control and stakeholder management for the twenty-two land owners was also a contract imperative. Treatment of 57,000 cubic metres of acid sulphate soils along the alignment was an environmental priority with trenchside spoil testing and liming used to streamline production. The project also won the 2013 Civil Contractor Federation WA Earth Awards Category 4. As with our trunk main projects before, this project allowed the increased flow delivered to the system to give Water Corporation more flexible storage and water transfer options for the IWSS. #dmcivil #companyhistory #pipelinesperth