Rizzani de Eccher

Rizzani de Eccher

Ingegneria civile

Pozzuolo del Friuli, UD 68.779 follower

General Contracting / High-quality Buildings and Infrastructures

Chi siamo

Specialisation, globalisation, capacity and flexibility are all keys to the success of Rizzani de Eccher. This allows the Group to stand out for its ability to add value to every project, from general building to infrastructure. Professionalism, rapidity of execution and dynamism allow the Group to deal simultaneously with complex and articulated activities in diverse geographic locations. With the objective of always fulfilling our clients’ requirements, the Group has successfully delivered hundreds of projects over the past century in Italy and abroad.

Sito Web
http://www.rde.it
Settore
Ingegneria civile
Dimensioni dell’azienda
1001 - 5000 dipendenti
Sede principale
Pozzuolo del Friuli, UD
Tipo
Società privata non quotata
Data di fondazione
1831
Settori di competenza
General contracting, Construction, Buildings, Infrastructures, Bridges, Viaducts e Civil Engineering

Località

Dipendenti presso Rizzani de Eccher

Aggiornamenti

  • Visualizza la pagina dell’organizzazione di Rizzani de Eccher, immagine

    68.779 follower

    #BrisbaneCityCouncil Kangaroo Point Bridge reached another important milestone through June 2024, with the erection of the last bridge deck module above the Brisbane River, which occurred after the successful completion of the installation and stressing of the last of the 32 cable stays supplied by #Tensa. #RizzanideEccher has played a key role, within the Connect Brisbane Consortium led by #BESIXWatpac, since the early design phases through temporary works development, shop drawing management, construction engineering, sequencing and planning, to ultimately ensure safe and smooth delivery of the bridge elements travelling via barge from the Port of Brisbane to the City, and lift in position by heavy-lift cranes. Our team consisted of specialized and experienced staff who has also helped the BESIX Watpac team in the early engineering, modelling and planning for other areas of the project such as the restaurant on the bridge, the Plaza works at CBD area and the high-quality finishes such as golden aluminum works supported on dedicated steel structures, and stainless steel balustrades.

    • Nessuna descrizione alternativa per questa immagine
    • Nessuna descrizione alternativa per questa immagine
    • Nessuna descrizione alternativa per questa immagine
    • Nessuna descrizione alternativa per questa immagine
    • Nessuna descrizione alternativa per questa immagine
  • Rizzani de Eccher ha diffuso questo post

    Visualizza la pagina dell’organizzazione di ERB Rail, immagine

    700 follower

    Buongiorno! The third member of the joint venture is Rizzani de Eccher S.p.a., an Italian General Contractor. 🇮🇹 The Company currently operates and has completed works in over 70 countries. Rizzani de Eccher specialises in general contracting, high-quality buildings and major restorations, infrastructure projects as well as engineering and manufacture of special equipment for bridges and viaducts. #ERBRail

    • Nessuna descrizione alternativa per questa immagine
  • Rizzani de Eccher ha diffuso questo post

    Visualizza la pagina dell’organizzazione di BESIX, immagine

    330.406 follower

    Paving the way for a connected Europe in Riga 🇱🇻! 🚆🤩 We're excited to share a glimpse of our recent progress on the Rail Baltica Central Hub project in Riga 🇱🇻. 📸 Works include a new central station building, a railway bridge across the River Daugava and track works over a 2.5-kilometre-distance! 💪 As part of the BERERIX joint venture, we are responsible for the design and construction of this significant project. It is part of the broader RB Rail AS | Rail Baltica initiative, which aims to integrate the Baltic States into the European railway network. 🙌 BERERIX consists of BESIX, Rizzani de Eccher & SIA RERE BŪVE. #BESIX #RailBaltica #Construction #Railway #BERERIX

    • Nessuna descrizione alternativa per questa immagine
    • Nessuna descrizione alternativa per questa immagine
    • Nessuna descrizione alternativa per questa immagine
    • Nessuna descrizione alternativa per questa immagine
  • Rizzani de Eccher ha diffuso questo post

    Visualizza la pagina dell’organizzazione di BESIX Watpac, immagine

    77.352 follower

    We’ve reached a huge milestone in the construction of the Kangaroo Point Bridge! The final span has been installed meaning that Kangaroo Point is now connected to the City Botanic Gardens. Works are ongoing to complete the bridge for #BrisbaneCityCouncil but we’re very excited to see this final piece go in! Congratulations to all involved in completing the installation seamlessly! 🌉 #brisbanebridge #kangaroopoint #brisbaneinfrastructure Beenleigh Steel Fabrications, Rizzani de Eccher, Brisbane City Council

  • Visualizza la pagina dell’organizzazione di Rizzani de Eccher, immagine

    68.779 follower

    On May 21, Rizzani de Eccher participated at the groundbreaking ceremony for the construction of the Rail Baltica Mainline in Riga. This significant event marks the start of work on a crucial infrastructure for the future of transportation in Europe. Rizzani de Eccher, together with its ERB Rail JV PS partners - Eiffage Génie Civil and Budimex - had the honor of taking part in this historic day, in the presence of important political figures. To mark the occasion, a time capsule containing symbolic objects was created and will be left at the construction site as a symbolic gesture to send a message to future generations. Rail Baltica is an innovative rail project designed to provide a fast and reliable connection between the Baltic region and Western Europe. Rizzani de Eccher is proud to contribute to this landmark project, which represents a decisive step towards a more connected and sustainable future. #RizzanideEccher #RailBaltica #ERBRail #Infrastructure #Europe

    • Nessuna descrizione alternativa per questa immagine
    • Nessuna descrizione alternativa per questa immagine
    • Nessuna descrizione alternativa per questa immagine
    • Nessuna descrizione alternativa per questa immagine
    • Nessuna descrizione alternativa per questa immagine
      + 5
  • Rizzani de Eccher ha diffuso questo post

    Visualizza la pagina dell’organizzazione di RB Rail AS | Rail Baltica, immagine

    17.134 follower

    👏 Another #milestone in the #RailBaltica project in Latvia reached by beginning construction of its #mainline. 🏗 On 21 May the Rail Baltica team, representatives from the European Commission and international partners from France, Italy, Poland, Lithuania and Estonia gathered in Riga to mark the occasion by sending messages to future generations through a time capsule to be embedded at the construction site. 🗣 “The significance of the Rail Baltica project in ensuring a fast and reliable connection for the Baltic region with Western Europe is particularly high in the current geopolitical conditions. The delivery of our shared ambition is to ensure a cross-border connection during the first phase of the Rail Baltica project by 2030, including the integration of Riga. Thus, the construction of the mainline is a top #priority,” explained minister of Transport of Latvia Kaspars Briškens. Satiksmes ministrija / Ministry of Transport 💬 “Rail Baltica has strong support from the European Commission, especially since the war, as its importance has increased even more,” says European Coordinator for the North Sea-Baltic TEN-T Corridor Catherine Trautmann. “It is not just a priority; it is a #necessity." 🔵 The joint venture ERB Rail JV, employed by the Rail Baltica national implementing body in Latvia Eiropas Dzelzceļa līnijas | Rail Baltica will oversee the construction of approximately 230 km of the mainline railway. This includes 175 engineering structures, 11 animal crossings, 42 viaducts, 81 road bridges, and 32 rail bridges. ℹ The construction will proceed in sections, beginning with the first set of works in the Bauska region near Iecava, where the future Rail Baltica infrastructure maintenance facility will be located. The maintenance center will cover an area of approximately 16.5 hectares. These infrastructure maintenance points will serve as logistic bases during the construction of the Rail Baltica mainline, facilitating the construction of connections to the existing 1520 mm track network and maximizing the use of the railway for transporting construction materials and machinery. 💬 “This year, over 150 km of the Rail Baltica mainline will be under construction. While many milestones remain to be achieved and challenges to be faced, the success of the next phases will hinge on the collaboration between the various project partners and contractors involved,” said interim Chairperson of the Management Board of RB Rail AS Marko Kivila. 👉 https://lnkd.in/ds_J7eyF

    • Nessuna descrizione alternativa per questa immagine
    • Nessuna descrizione alternativa per questa immagine
    • Nessuna descrizione alternativa per questa immagine
    • Nessuna descrizione alternativa per questa immagine
    • Nessuna descrizione alternativa per questa immagine
      + 5
  • Rizzani de Eccher ha diffuso questo post

    Visualizza la pagina dell’organizzazione di Eiffage in Latvia, immagine

    152 follower

    🚆 Celebrating the Future of Rail Baltica 🚆 Yesterday marked a significant milestone in the Rail Baltica project, celebrated at a grand #ceremony held at the Latvijas Nacionālā bibliotēka / National Library of Latvia. This event was graced by numerous political figures such as Kaspars Briškens, Latvian Minister of Transport, Franck Riester our French Minister Delegate for Foreign Trade and Economic Attractiveness, Catherine Trautmann, European Coordinator for the North Sea-Baltic TEN-T Corridor, Aurélie Royet-Gounin, French Ambassador to Latvia, Arvils Aseradens, Latvian Minister of Finance, Alessandro Monti, Italian Ambassador to Latvia or Grzegorz Jagielski, Polish Embassy Counselor for Political and Economic Affairs These leaders represented the key companies of the ERB Rail JV PS: Eiffage Génie Civil (France), Budimex (Poland), and Rizzani de Eccher (Italy). The ceremony was not only a celebration of the progress of the Rail Baltica high-speed line, which will span across the Baltic countries with a 230km section handled by the JV ERB Rail JV PS, but also an occasion for stakeholders, CEOs, such as ours CEOs Guillaume Sauvé and Olivier de Guinaumont who attended especially for the occasion, and teams to come together. 🤝A unique time capsule, containing message for the future authenticated by 18 signatories and symbolic objects, will be buried at the site to commemorate this collaborative effort and to send a message to future generations. The presence of Franck Riester, Catherine Trautmann, and Aurélie Royet-Gounin is a testament to the strong support and commitment from France towards this transformative project. This event underscores the dedication and #collaboration of multiple nations and companies towards #building a more #connected and prosperous future. A warm thanks to all the people who contributed and will contribute to the success of this project. Here’s to the next chapter of Rail Baltica! 🚄✨ #RailBaltica #EiffageGenieCivil #ERBRail #InternationalCooperation

    • Nessuna descrizione alternativa per questa immagine
    • Nessuna descrizione alternativa per questa immagine
    • Nessuna descrizione alternativa per questa immagine
    • Nessuna descrizione alternativa per questa immagine
    • Nessuna descrizione alternativa per questa immagine
      + 4
  • Rizzani de Eccher ha diffuso questo post

    Visualizza il profilo di Artur Popko, immagine

    Rozpoczynamy największy historycznie dla Budimeksu i jednocześnie największy w Europie kontrakt kolejowy dofinansowany przez UE - Rail Baltica w Łotwie! Wczoraj oficjalnie wmurowaliśmy kapsułę czasu. To strategiczny kontrakt dla całego regionu, który łączy Polskę, Litwę, Łotwę i Estonię. Wykonamy go w ramach konsorcjum ERB RAIL, w którym udział Budimeksu wynosi 30 proc. Po raz pierwszy w historii polska firma będzie miała tak znaczący udział w budowie kolei dużych prędkości w innym kraju UE.  Zespół wykonawczy to międzynarodowa grupa pracowników Budimex, francuskiego Eiffage Génie Civil i włoskiego Rizzani de Eccher.  Stoimy przed ogromnym wyzwaniem, które jest też dla naszej firmy zaszczytem i dowodem uznania dla dużego doświadczenia i kompetencji. Jesteśmy zorientowani na wielopoziomową współpracę i integrację ze wszystkimi uczestnikami tego kontraktu, przed nami 8 lat prac. #RailBaltica #Budimex #Łotwa

    • Nessuna descrizione alternativa per questa immagine
    • Nessuna descrizione alternativa per questa immagine
    • Nessuna descrizione alternativa per questa immagine
  • Rizzani de Eccher ha diffuso questo post

    Visualizza la pagina dell’organizzazione di BESIX NL, immagine

    22.722 follower

    Gisteren bracht Nic De Roeck een bezoek aan het POST-project in Rotterdam waar een inzichtelijke rondleiding werd gegeven, door onze collega Abdel el Idrissi, vanuit de klimbekisting, die nu elke 7 dagen 1 verdieping springt. Ga zo door, team POST! Een mooi voorbeeld van internationale samenwerking met Rizzani de Eccher.Samen maken we dit unieke bouwproject tot een succes! Doka | BESIX NL | Rizzani de Eccher |Amvest | Spindler Installatietechniek

    • Nessuna descrizione alternativa per questa immagine
    • Nessuna descrizione alternativa per questa immagine
    • Nessuna descrizione alternativa per questa immagine
    • Nessuna descrizione alternativa per questa immagine

Pagine affiliate

Pagine simili

Sfoglia le offerte di lavoro