Rizzani de Eccher

Rizzani de Eccher

Ingegneria civile

Pozzuolo del Friuli, UD 69.774 follower

General Contracting / High-quality Buildings and Infrastructures

Chi siamo

Specialisation, globalisation, capacity and flexibility are all keys to the success of Rizzani de Eccher. This allows the Group to stand out for its ability to add value to every project, from general building to infrastructure. Professionalism, rapidity of execution and dynamism allow the Group to deal simultaneously with complex and articulated activities in diverse geographic locations. With the objective of always fulfilling our clients’ requirements, the Group has successfully delivered hundreds of projects over the past century in Italy and abroad.

Sito Web
http://www.rde.it
Settore
Ingegneria civile
Dimensioni dell’azienda
1001 - 5000 dipendenti
Sede principale
Pozzuolo del Friuli, UD
Tipo
Società privata non quotata
Data di fondazione
1831
Settori di competenza
General contracting, Construction, Buildings, Infrastructures, Bridges, Viaducts e Civil Engineering

Località

Dipendenti presso Rizzani de Eccher

Aggiornamenti

  • Rizzani de Eccher ha diffuso questo post

    Visualizza la pagina dell’organizzazione di Brisbane City Council, immagine

    95.671 follower

    Last month, the Kangaroo Point Bridge reached a significant milestone with the final bridge span installed and the concrete deck poured - resulting in a completed connection from the CBD to Kangaroo Point! The full connection and concreting of the bridge decks brings the project to 90% complete, with all major structural elements completed. The focus has now turned to completing the bridge landings at Kangaroo Point and CBD, and removing the temporary structures in the Brisbane River that have supported the building of the bridge. The bridge is anticipated to be completed in late 2024. Find out more about the project: https://lnkd.in/gpxZRHYn #SEQCityDeal @australiangovernment

  • Rizzani de Eccher ha diffuso questo post

    Visualizza la pagina dell’organizzazione di Rail Baltica in Lithuania, immagine

    3.486 follower

    🚅 #RailBaltica contractors - Lithuanian capital company Fegda, UAB and Italian company Rizzani de Eccher - had to solve the technological challenges of the longest bridge in the Baltic States. • Rizzani de Eccher is building the bridge structures, Fegda is building the retaining walls on the approaches to the bridge; • By working together, the contractors found the technological possibilities to install the retaining walls earlier, thus ensuring a smooth workflow; • In the construction of such a large-scale linear structure, intersecting design solutions are not uncommon; • In this case, the contractors' input, flexibility and ability to communicate will allow the project to move forward 🛠 Justas Vyžintas, LTG Infra Head for Rail Baltica Management, said that the speed of construction is one of the main priorities at the moment. "Rail Baltica Lithuania project managers have reached the necessary agreements by taking proactive steps and initiating constructive dialogue. The Lithuanian contractor, Fegda, also sets high standards and is very progress-oriented. Constant communication between the client, engineers and contractors leads to the best possible results," said Justas Vyzintas. 🌐 Read more in Lithuanian 👉 https://lnkd.in/dqpCZ4g4 #Infrastructure #Railways #Fegda #RizzanideEccher #Bridge #FutureInTrain

    • Nessuna descrizione alternativa per questa immagine
  • Rizzani de Eccher ha diffuso questo post

    Visualizza la pagina dell’organizzazione di BESIX NL, immagine

    22.832 follower

    🏗️ Gevelbogen POST woontoren goed zichtbaar 👏 Projectteam The Post Bouw (BESIX NL & Rizzani de Eccher) heeft opmerkelijke vooruitgang geboekt, waarbij de torenkern nu 90 meter bereikt. Bovendien hebben ze tot nu toe met succes 30 bogen van glasvezelversterkt beton (GFRC) geïnstalleerd en zijn ze begonnen met het monteren van de aluminium vliesgevel die is ontworpen voor eersteklas energieprestaties. Go, team POST! 💪 📸 BeemFlights #BESIXNL #BESIX #POSTRotterdam #Construction

    • Nessuna descrizione alternativa per questa immagine
    • Nessuna descrizione alternativa per questa immagine
    • Nessuna descrizione alternativa per questa immagine
  • Rizzani de Eccher ha diffuso questo post

    Visualizza la pagina dell’organizzazione di RB Rail AS | Rail Baltica, immagine

    17.384 follower

    Good progress on the Neris bridge construction in Lithuania. At the end of July 2024, contractor Rizzani de Eccher kicked off a new phase in the construction of the #RailBaltica bridge over the Neris River in Jonava district. Rail Baltica in Lithuania 🚧 Sheet pilings have been delivered to the site, marking the start of this stage. These will create a temporary protective perimeter, enabling the safe installation of bridge pile heads. 🌉 The Neris bridge is a massive 1.51-kilometer structure, making it not only the longest bridge in the Rail Baltica project but also one of the most complex infrastructure undertakings in Lithuania’s history. 🏗️ To date, substantial preparatory work has been completed, with 262 of the planned 376 piles already installed, utilizing 7.6 thousand cubic meters of concrete. Read more ➡ https://lnkd.in/d5ETmKkZ

    • Nessuna descrizione alternativa per questa immagine
    • Nessuna descrizione alternativa per questa immagine
  • Rizzani de Eccher ha diffuso questo post

    Visualizza la pagina dell’organizzazione di Rail Baltica in Lithuania, immagine

    3.486 follower

    🚅 Rizzani de Eccher, the contractor of the #RailBaltica bridge over the Neris River, has started a new construction phase in the Jonava district, bringing sheet piles to the construction site.   "The complexity of the bridge over the Neris River is not only its length (1,51 km) but also its height (40 m). The Rail Baltica Lithuania team initiated a dialogue between the designer and the contractor, and appropriate technical solutions were found. It was a complex, but necessary process that will allow the project to move ahead with the construction work at a faster pace and on a larger scale," said Justas Vyzintas, LTG Infra Head for Rail Baltica Management.    🛠 Construction progress: - 262 out of 376 poles have been installed; - 7.6 thousand cubic metres of concrete used; - 3 technologies are used in the construction process; - 700 workers and 500 pieces of machinery are working daily on the active Rail Baltica sections in Lithuania.    📡 For more information about the project's progress in Lithuanian, please visit our website 👉  https://lnkd.in/dTQ2rK_r   #RailBaltica #Infrastructure #Lithuania #Europe #SustainableTransport

    • Nessuna descrizione alternativa per questa immagine
    • Nessuna descrizione alternativa per questa immagine
  • Visualizza la pagina dell’organizzazione di Rizzani de Eccher, immagine

    69.774 follower

    #BrisbaneCityCouncil Kangaroo Point Bridge reached another important milestone through June 2024, with the erection of the last bridge deck module above the Brisbane River, which occurred after the successful completion of the installation and stressing of the last of the 32 cable stays supplied by #Tensa. #RizzanideEccher has played a key role, within the Connect Brisbane Consortium led by #BESIXWatpac, since the early design phases through temporary works development, shop drawing management, construction engineering, sequencing and planning, to ultimately ensure safe and smooth delivery of the bridge elements travelling via barge from the Port of Brisbane to the City, and lift in position by heavy-lift cranes. Our team consisted of specialized and experienced staff who has also helped the BESIX Watpac team in the early engineering, modelling and planning for other areas of the project such as the restaurant on the bridge, the Plaza works at CBD area and the high-quality finishes such as golden aluminum works supported on dedicated steel structures, and stainless steel balustrades.

    • Nessuna descrizione alternativa per questa immagine
    • Nessuna descrizione alternativa per questa immagine
    • Nessuna descrizione alternativa per questa immagine
    • Nessuna descrizione alternativa per questa immagine
    • Nessuna descrizione alternativa per questa immagine
  • Rizzani de Eccher ha diffuso questo post

    Visualizza la pagina dell’organizzazione di ERB Rail, immagine

    805 follower

    Buongiorno! The third member of the joint venture is Rizzani de Eccher S.p.a., an Italian General Contractor. 🇮🇹 The Company currently operates and has completed works in over 70 countries. Rizzani de Eccher specialises in general contracting, high-quality buildings and major restorations, infrastructure projects as well as engineering and manufacture of special equipment for bridges and viaducts. #ERBRail

    • Nessuna descrizione alternativa per questa immagine
  • Rizzani de Eccher ha diffuso questo post

    Visualizza la pagina dell’organizzazione di BESIX, immagine

    341.385 follower

    Paving the way for a connected Europe in Riga 🇱🇻! 🚆🤩 We're excited to share a glimpse of our recent progress on the Rail Baltica Central Hub project in Riga 🇱🇻. 📸 Works include a new central station building, a railway bridge across the River Daugava and track works over a 2.5-kilometre-distance! 💪 As part of the BERERIX joint venture, we are responsible for the design and construction of this significant project. It is part of the broader RB Rail AS | Rail Baltica initiative, which aims to integrate the Baltic States into the European railway network. 🙌 BERERIX consists of BESIX, Rizzani de Eccher & SIA RERE BŪVE. #BESIX #RailBaltica #Construction #Railway #BERERIX

    • Nessuna descrizione alternativa per questa immagine
    • Nessuna descrizione alternativa per questa immagine
    • Nessuna descrizione alternativa per questa immagine
    • Nessuna descrizione alternativa per questa immagine
  • Rizzani de Eccher ha diffuso questo post

    Visualizza la pagina dell’organizzazione di BESIX Watpac, immagine

    79.105 follower

    We’ve reached a huge milestone in the construction of the Kangaroo Point Bridge! The final span has been installed meaning that Kangaroo Point is now connected to the City Botanic Gardens. Works are ongoing to complete the bridge for #BrisbaneCityCouncil but we’re very excited to see this final piece go in! Congratulations to all involved in completing the installation seamlessly! 🌉 #brisbanebridge #kangaroopoint #brisbaneinfrastructure Beenleigh Steel Fabrications, Rizzani de Eccher, Brisbane City Council

  • Visualizza la pagina dell’organizzazione di Rizzani de Eccher, immagine

    69.774 follower

    On May 21, Rizzani de Eccher participated at the groundbreaking ceremony for the construction of the Rail Baltica Mainline in Riga. This significant event marks the start of work on a crucial infrastructure for the future of transportation in Europe. Rizzani de Eccher, together with its ERB Rail JV PS partners - Eiffage Génie Civil and Budimex - had the honor of taking part in this historic day, in the presence of important political figures. To mark the occasion, a time capsule containing symbolic objects was created and will be left at the construction site as a symbolic gesture to send a message to future generations. Rail Baltica is an innovative rail project designed to provide a fast and reliable connection between the Baltic region and Western Europe. Rizzani de Eccher is proud to contribute to this landmark project, which represents a decisive step towards a more connected and sustainable future. #RizzanideEccher #RailBaltica #ERBRail #Infrastructure #Europe

    • Nessuna descrizione alternativa per questa immagine
    • Nessuna descrizione alternativa per questa immagine
    • Nessuna descrizione alternativa per questa immagine
    • Nessuna descrizione alternativa per questa immagine
    • Nessuna descrizione alternativa per questa immagine
      + 5

Pagine affiliate

Pagine simili

Sfoglia le offerte di lavoro