Rizzani de Eccher ti aspetta al Recruiting Day il 30 ottobre! Se sei pronto a cogliere nuove sfide professionali e desideri crescere in un ambiente dinamico e innovativo, questa è la tua occasione. Vieni a conoscere il nostro team e scopri le opportunità di carriera che abbiamo da offrire! Per info e candidature: https://lnkd.in/dwZgCKKF
Rizzani de Eccher
Ingegneria civile
Pozzuolo del Friuli, UD 70.563 follower
General Contracting / High-quality Buildings and Infrastructures
Chi siamo
Specialisation, globalisation, capacity and flexibility are all keys to the success of Rizzani de Eccher. This allows the Group to stand out for its ability to add value to every project, from general building to infrastructure. Professionalism, rapidity of execution and dynamism allow the Group to deal simultaneously with complex and articulated activities in diverse geographic locations. With the objective of always fulfilling our clients’ requirements, the Group has successfully delivered hundreds of projects over the past century in Italy and abroad.
- Sito Web
-
http://www.rde.it
Link esterno per Rizzani de Eccher
- Settore
- Ingegneria civile
- Dimensioni dell’azienda
- 1001 - 5000 dipendenti
- Sede principale
- Pozzuolo del Friuli, UD
- Tipo
- Società privata non quotata
- Data di fondazione
- 1831
- Settori di competenza
- General contracting, Construction, Buildings, Infrastructures, Bridges, Viaducts e Civil Engineering
Località
-
Principale
via Buttrio 36
Fraz. Cargnacco
Pozzuolo del Friuli, UD 33050, IT
Dipendenti presso Rizzani de Eccher
Aggiornamenti
-
💼 Il 26 ottobre ti aspettiamo alla Fiera del Lavoro FVG a Udine. Rizzani de Eccher sarà presente per farvi conoscere le opportunità di carriera e inserimento all'interno dell’azienda. Sarà l'occasione perfetta per incontrare i nostri recruiter, sostenere colloqui e scoprire come possiamo costruire insieme il tuo futuro professionale. 👉 Non perdere questa opportunità unica!
🎉 Siamo lieti di annunciare le ultime aziende che saranno presenti alla #FieraDelLavoroFVG2024! 🚀 Scoprite chi sono le ultime realtà ad aver confermato la loro adesione e continuate a seguirci per rimanere aggiornati su tutte le novità. Siamo entusiasti di presentarvi la 20ª edizione della Fiera del Lavoro FVG organizzata da ALIg! Regione Autonoma Friuli Venezia Giulia, Lidl Italia, Faber Industrie, UniCredit, Rizzani de Eccher, Midolini Group S.p.A., Credifriuli, Codognotto.
-
We are delighted that our high-rise mixed-use project Yvie, situated in Amsterdam North, has now reached its final stages, with the Residential Section being fully occupied in August, and Hotel and Extended Stay operators both now making their preparations for opening! This achievement has come after over four and half years of dedication and effort on the project by the Rizzani de Eccher design & construct team, working closely with our customer Union Investments, through COVID and more recently the market effects of the Ukraine War. Thank you all for such great work! Thank you also to our customer, project stakeholders including Gemeente Amsterdam and our loyal supply chain for all the support. We now look forward to the final grand opening and Yvie becoming an icon of the Amsterdam skyline.
-
Rizzani de Eccher and TENSA - Your Challenges, Our Solutions would like to express our greatest gratitude to #BrisbaneCityCouncil and #BesixWatpac for the amazing opportunity to participate and successfully deliver together the #KangarooPointBridge. Our journey started long before the EOI, developed through the ECI tender phase and culminated as part of the delivery phase through design, engineering, procurement and construction phases. We are very proud to have been part of, and positively contributed to, this unbelievably outstanding project, and to have placed a part of our Italian culture and technical know-how into this unique landmark bridge.
-
Rizzani de Eccher ha diffuso questo post
🚧 282 of the 376 piles that will support the #RailBaltica Neris bridge have already been installed. The 1.51 km long and 40 m high #bridge, currently under #construction, marks a milestone in Lithuanian engineering. It is the first time in Lithuania where piles with a diameter of 1.8 m and a depth exceeding 20 m are being used for bridge construction. The deepest piles will reach a depth of 33 m. The work is being carried out using a 27 m high rotary drilling machine. Once the piles are in place, work will begin on installing the pile caps, which will support the bridge columns. Italian company Rizzani de Eccher is building the bridge structures, and Lithuanian capital company Fegda grupė, UAB is building the retaining walls on the approaches to the bridge. 🌉 The Neris bridge is one of the most complex infrastructure projects in Lithuania's history and is set to become the longest bridge in the Baltic States. #Infrastructure #Lithuania #Engineering #SustainableTransport #ConstructionInnovation
-
Rizzani de Eccher ha diffuso questo post
Last month, the Kangaroo Point Bridge reached a significant milestone with the final bridge span installed and the concrete deck poured - resulting in a completed connection from the CBD to Kangaroo Point! The full connection and concreting of the bridge decks brings the project to 90% complete, with all major structural elements completed. The focus has now turned to completing the bridge landings at Kangaroo Point and CBD, and removing the temporary structures in the Brisbane River that have supported the building of the bridge. The bridge is anticipated to be completed in late 2024. Find out more about the project: https://lnkd.in/gpxZRHYn #SEQCityDeal @australiangovernment
-
Rizzani de Eccher ha diffuso questo post
🚅 #RailBaltica contractors - Lithuanian capital company Fegda, UAB and Italian company Rizzani de Eccher - had to solve the technological challenges of the longest bridge in the Baltic States. • Rizzani de Eccher is building the bridge structures, Fegda is building the retaining walls on the approaches to the bridge; • By working together, the contractors found the technological possibilities to install the retaining walls earlier, thus ensuring a smooth workflow; • In the construction of such a large-scale linear structure, intersecting design solutions are not uncommon; • In this case, the contractors' input, flexibility and ability to communicate will allow the project to move forward 🛠 Justas Vyžintas, LTG Infra Head for Rail Baltica Management, said that the speed of construction is one of the main priorities at the moment. "Rail Baltica Lithuania project managers have reached the necessary agreements by taking proactive steps and initiating constructive dialogue. The Lithuanian contractor, Fegda, also sets high standards and is very progress-oriented. Constant communication between the client, engineers and contractors leads to the best possible results," said Justas Vyzintas. 🌐 Read more in Lithuanian 👉 https://lnkd.in/dqpCZ4g4 #Infrastructure #Railways #Fegda #RizzanideEccher #Bridge #FutureInTrain
-
Rizzani de Eccher ha diffuso questo post
🏗️ Gevelbogen POST woontoren goed zichtbaar 👏 Projectteam The Post Bouw (BESIX NL & Rizzani de Eccher) heeft opmerkelijke vooruitgang geboekt, waarbij de torenkern nu 90 meter bereikt. Bovendien hebben ze tot nu toe met succes 30 bogen van glasvezelversterkt beton (GFRC) geïnstalleerd en zijn ze begonnen met het monteren van de aluminium vliesgevel die is ontworpen voor eersteklas energieprestaties. Go, team POST! 💪 📸 BeemFlights #BESIXNL #BESIX #POSTRotterdam #Construction
-
Rizzani de Eccher ha diffuso questo post
Good progress on the Neris bridge construction in Lithuania. At the end of July 2024, contractor Rizzani de Eccher kicked off a new phase in the construction of the #RailBaltica bridge over the Neris River in Jonava district. Rail Baltica in Lithuania 🚧 Sheet pilings have been delivered to the site, marking the start of this stage. These will create a temporary protective perimeter, enabling the safe installation of bridge pile heads. 🌉 The Neris bridge is a massive 1.51-kilometer structure, making it not only the longest bridge in the Rail Baltica project but also one of the most complex infrastructure undertakings in Lithuania’s history. 🏗️ To date, substantial preparatory work has been completed, with 262 of the planned 376 piles already installed, utilizing 7.6 thousand cubic meters of concrete. Read more ➡ https://lnkd.in/d5ETmKkZ
-
Rizzani de Eccher ha diffuso questo post
🚅 Rizzani de Eccher, the contractor of the #RailBaltica bridge over the Neris River, has started a new construction phase in the Jonava district, bringing sheet piles to the construction site. "The complexity of the bridge over the Neris River is not only its length (1,51 km) but also its height (40 m). The Rail Baltica Lithuania team initiated a dialogue between the designer and the contractor, and appropriate technical solutions were found. It was a complex, but necessary process that will allow the project to move ahead with the construction work at a faster pace and on a larger scale," said Justas Vyzintas, LTG Infra Head for Rail Baltica Management. 🛠 Construction progress: - 262 out of 376 poles have been installed; - 7.6 thousand cubic metres of concrete used; - 3 technologies are used in the construction process; - 700 workers and 500 pieces of machinery are working daily on the active Rail Baltica sections in Lithuania. 📡 For more information about the project's progress in Lithuanian, please visit our website 👉 https://lnkd.in/dTQ2rK_r #RailBaltica #Infrastructure #Lithuania #Europe #SustainableTransport