Problems with the Plara Dam include the amount of sedimentation so that the water flow retained i... more Problems with the Plara Dam include the amount of sedimentation so that the water flow retained in the dam is not optimal. One effort to overcome sedimentation is to normalize sedimentation. The availability and need of water do not always meet the needs of life, both for humans, animals and plants. This happens because there is no balance between availability and water demand. Erosion and sedimentation are a series of processes related to the process of weathering, releasing, transporting and settling soil/crust material. With erosion in the watershed and the amount of sedimentation observed in the river flow at the bottom of the catchment is closely related to the hydrological system of the watershed. Rain as input in the hydrological system after experiencing the process will produce output in the form of flowrate and sediment load. The purpose of this study was to determine the volume of sedimentation in the Plara Dam. The method used in this research is to take primary and secondary data. The results of this study are the smallest rainfall intensity occurred in 2011 amounted to 1051.5 mm/sec and the highest occurred in 2016 amounted to 1734.7 mm/sec. Sedimentation volume occurred in the P19 - P20 area of 12129.32 m3 with total sedimentation of the P1-P20 area of 338588.93 m3.
Asphalt mixture is a very important component that needs to be taken into account in flexible pav... more Asphalt mixture is a very important component that needs to be taken into account in flexible pavement construction to achieve the durability of a highway construction. In order to achieve the durability of road construction, it is necessary to control the quality of the mixture used to determine the quality of the mixture used in road construction. Evaluation of the mixture is carried out in the laboratory to check asphalt content, aggregate gradation and field density which must meet the required tolerances for the working mixture (JMF). Evaluation of the asphalt mixture can be done by the extraction method. The extraction method used in this study is the centrifugal extraction method. With this extraction method, the composition of a mixture can be known so that it can be compared with the mixture required in the Job Mix Formula (JMF). In conclusion, there is a decrease in the extracted asphalt content with the planned asphalt content, that is, with an average asphalt content val...
Pemerintah Indonesia menerapkan suatu program yang diberi nama Zona Selamat Sekolah (ZoSS) sebaga... more Pemerintah Indonesia menerapkan suatu program yang diberi nama Zona Selamat Sekolah (ZoSS) sebagai salah satu instrumen untuk mengurangi kecepatan kendaraan serta mengantisipasi perilaku anak sekolah yang tidak bisa direncanakan sehingga memicu kecelakaan lalu lintas. Banyak sekolah di kota-kota besar khususnya kota Sumbawa berada di dekat area jalan raya dengan kesadaran pengemudi yang masih kurang sehingga masih banyak pengemudi yang melaju dengan kecepatan tinggi. Tujuan penelitian ini untuk menganalisis kinerja ZoSS di kota Sumbawa dan akan di mulai dengan survei kelengkapan ZoSS, geometri jalan, hambatan samping, arus bebas untuk menentukan tingkat pelayanan ruas jalan yang terdapat ZoSS, volume kendaraan, kecepatan/spot speed dan perilaku penyeberang. Analisa data menggunakan pedoman MKJI 1997 dan Statistik Distribusi Normal (Uji Z) yang mangacu pada Peraturan Dirjen HubDat No. SK 3236/AJ 403/DRDJ/2006. Berdasarkan hasil analisis dari kelengkapan fasilitas ZoSS di dua lokasi b...
Kondisi pembangunan infrastuktur Jalan Samota mengalami permasalahan dikarenakan kondisi jalan ya... more Kondisi pembangunan infrastuktur Jalan Samota mengalami permasalahan dikarenakan kondisi jalan yang mengalami berbagai kerusakan pada struktur jalan akibat dari gerakan aliran air pada segmen jalan. Gerakan aliran air akan menyebabkan terjadinya kerusakan jalan seiring berjalannya waktu. Tujuan penelitian ini dimaksudkan untuk mengetahui pengaruh gerakan aliran air terhadap kerusakan jalan berdasarkan tinjaun hidrologi dan hidrolika, serta mengetahui jenis kerusakan dan tingkat kerusakan jalan pada Jalan Samota akibat gerakan aliran air.Objek dalam penelitian adalah STA 006+000 – STA 008+050 pada Jalan Samota, Kabupaten Sumbawa, Nusa Tenggara Barat. Penelitian dilakukan dengan mengidentifikasi gerakan aliran air pada tiap segmen jalan yang menyebabkan kerusakan konstruksi jalan berdasarkan jenis dan tingkat kerusakan perkerasan jalan. Lokasi Penelitian dibagi menjadi 3 segmen, yaitu segmen 1 berada pada STA 006+000 – STA 006+045, segmen 2 yaitu pada STA 007+100 – STA 007+150, dan se...
Penelitian ini bertujuan untuk mengetahui hasil dari tegangan yang terjadi pada balok setelah ter... more Penelitian ini bertujuan untuk mengetahui hasil dari tegangan yang terjadi pada balok setelah terjadi komposit. Lokasi sungai Gontar yang akan di rencanakan jembatan berada di desa Gontar, Alas Barat. Tiang sandaran yang direncanakan didapatkan hasil diameter pipa = 76,3 mm dengan jarak tiang sandaran 200 cm, penulangan tiang sandaran Mu = 2,3 x 106 Nm, dipakai tulangan lentur 2 Ø 10, dan tulangan geser didapatkan jarak sengkang Ø 8-120 mm. Hasil penelitian diperoleh kesimpulan yaitu hasil tulangan lentur Ø 13-100 mm, tulangan pembagi Ø 10-300 mm.dimensi plat lantai trotoar dengan lebar 100 cm, dan tinggi dari pelat lantai 25 cm; hasil penulangan arah melintang (lx) digunakan tulangan pokok Ø 10-75 mm, dan penulangan arah memanjang (ly) digunakan tulangan pokok Ø 10-75 mm; jarak antar gelagar memanjang 1,88 meter dengan jumlah 11 buah, gelagar melintang 5 meter dengan jumlah 7 buah; plat injak menggunakan tulangan lentur Ø 16-210 mm dan tulangan pembagi menggunakan Ø 8-1000 mm.
Lingkungan Perikanan dan Karya Bakti Merupakan daerah padat penduduk terutama Lingkungan karya ba... more Lingkungan Perikanan dan Karya Bakti Merupakan daerah padat penduduk terutama Lingkungan karya bakti yang menjadi salah satu kawasan kumuh di Kelurahan pekat Sumbawa besar. Isu lingkungan seperti kondisi pengolahan air limbah dan sanitasi yang buruk pada kawasan ini mengakibatkan lingkungan yang kurang sehat. Perencanaan sanitasi yang tidak sesuai standar kerap terjadi pada daerah-daerah padat penduduk seperti Lingkungan Karya Bakti. Berdasarkan observasi menunjukkan bahwa jarak Septictank dan sumur air bersih warga ternyata ada yang kurang dari 5 m sehingga air sumur bisa saja terkontaminasi oleh air dari Septictank masyarakat yang mengandung zat dan mikroba berbahaya. Jika tidak cepat di atasi menjadi salah satu dampak yang sangat berbahaya terhadap lingkungan masyarakat maupun makhluk hidup lainnya.Penelitian ini bertujuan untuk mengetahui bagaimana perencanaan dan besarnya anggaran biaya untuk pembangunan IPAL Komunal di Kelurahan Pekat Lingkungan Perikanan dan Karya Bakti khusu...
Problems with the Plara Dam include the amount of sedimentation so that the water flow retained i... more Problems with the Plara Dam include the amount of sedimentation so that the water flow retained in the dam is not optimal. One effort to overcome sedimentation is to normalize sedimentation. The availability and need of water do not always meet the needs of life, both for humans, animals and plants. This happens because there is no balance between availability and water demand. Erosion and sedimentation are a series of processes related to the process of weathering, releasing, transporting and settling soil/crust material. With erosion in the watershed and the amount of sedimentation observed in the river flow at the bottom of the catchment is closely related to the hydrological system of the watershed. Rain as input in the hydrological system after experiencing the process will produce output in the form of flowrate and sediment load. The purpose of this study was to determine the volume of sedimentation in the Plara Dam. The method used in this research is to take primary and secondary data. The results of this study are the smallest rainfall intensity occurred in 2011 amounted to 1051.5 mm/sec and the highest occurred in 2016 amounted to 1734.7 mm/sec. Sedimentation volume occurred in the P19 - P20 area of 12129.32 m3 with total sedimentation of the P1-P20 area of 338588.93 m3.
Asphalt mixture is a very important component that needs to be taken into account in flexible pav... more Asphalt mixture is a very important component that needs to be taken into account in flexible pavement construction to achieve the durability of a highway construction. In order to achieve the durability of road construction, it is necessary to control the quality of the mixture used to determine the quality of the mixture used in road construction. Evaluation of the mixture is carried out in the laboratory to check asphalt content, aggregate gradation and field density which must meet the required tolerances for the working mixture (JMF). Evaluation of the asphalt mixture can be done by the extraction method. The extraction method used in this study is the centrifugal extraction method. With this extraction method, the composition of a mixture can be known so that it can be compared with the mixture required in the Job Mix Formula (JMF). In conclusion, there is a decrease in the extracted asphalt content with the planned asphalt content, that is, with an average asphalt content val...
Pemerintah Indonesia menerapkan suatu program yang diberi nama Zona Selamat Sekolah (ZoSS) sebaga... more Pemerintah Indonesia menerapkan suatu program yang diberi nama Zona Selamat Sekolah (ZoSS) sebagai salah satu instrumen untuk mengurangi kecepatan kendaraan serta mengantisipasi perilaku anak sekolah yang tidak bisa direncanakan sehingga memicu kecelakaan lalu lintas. Banyak sekolah di kota-kota besar khususnya kota Sumbawa berada di dekat area jalan raya dengan kesadaran pengemudi yang masih kurang sehingga masih banyak pengemudi yang melaju dengan kecepatan tinggi. Tujuan penelitian ini untuk menganalisis kinerja ZoSS di kota Sumbawa dan akan di mulai dengan survei kelengkapan ZoSS, geometri jalan, hambatan samping, arus bebas untuk menentukan tingkat pelayanan ruas jalan yang terdapat ZoSS, volume kendaraan, kecepatan/spot speed dan perilaku penyeberang. Analisa data menggunakan pedoman MKJI 1997 dan Statistik Distribusi Normal (Uji Z) yang mangacu pada Peraturan Dirjen HubDat No. SK 3236/AJ 403/DRDJ/2006. Berdasarkan hasil analisis dari kelengkapan fasilitas ZoSS di dua lokasi b...
Kondisi pembangunan infrastuktur Jalan Samota mengalami permasalahan dikarenakan kondisi jalan ya... more Kondisi pembangunan infrastuktur Jalan Samota mengalami permasalahan dikarenakan kondisi jalan yang mengalami berbagai kerusakan pada struktur jalan akibat dari gerakan aliran air pada segmen jalan. Gerakan aliran air akan menyebabkan terjadinya kerusakan jalan seiring berjalannya waktu. Tujuan penelitian ini dimaksudkan untuk mengetahui pengaruh gerakan aliran air terhadap kerusakan jalan berdasarkan tinjaun hidrologi dan hidrolika, serta mengetahui jenis kerusakan dan tingkat kerusakan jalan pada Jalan Samota akibat gerakan aliran air.Objek dalam penelitian adalah STA 006+000 – STA 008+050 pada Jalan Samota, Kabupaten Sumbawa, Nusa Tenggara Barat. Penelitian dilakukan dengan mengidentifikasi gerakan aliran air pada tiap segmen jalan yang menyebabkan kerusakan konstruksi jalan berdasarkan jenis dan tingkat kerusakan perkerasan jalan. Lokasi Penelitian dibagi menjadi 3 segmen, yaitu segmen 1 berada pada STA 006+000 – STA 006+045, segmen 2 yaitu pada STA 007+100 – STA 007+150, dan se...
Penelitian ini bertujuan untuk mengetahui hasil dari tegangan yang terjadi pada balok setelah ter... more Penelitian ini bertujuan untuk mengetahui hasil dari tegangan yang terjadi pada balok setelah terjadi komposit. Lokasi sungai Gontar yang akan di rencanakan jembatan berada di desa Gontar, Alas Barat. Tiang sandaran yang direncanakan didapatkan hasil diameter pipa = 76,3 mm dengan jarak tiang sandaran 200 cm, penulangan tiang sandaran Mu = 2,3 x 106 Nm, dipakai tulangan lentur 2 Ø 10, dan tulangan geser didapatkan jarak sengkang Ø 8-120 mm. Hasil penelitian diperoleh kesimpulan yaitu hasil tulangan lentur Ø 13-100 mm, tulangan pembagi Ø 10-300 mm.dimensi plat lantai trotoar dengan lebar 100 cm, dan tinggi dari pelat lantai 25 cm; hasil penulangan arah melintang (lx) digunakan tulangan pokok Ø 10-75 mm, dan penulangan arah memanjang (ly) digunakan tulangan pokok Ø 10-75 mm; jarak antar gelagar memanjang 1,88 meter dengan jumlah 11 buah, gelagar melintang 5 meter dengan jumlah 7 buah; plat injak menggunakan tulangan lentur Ø 16-210 mm dan tulangan pembagi menggunakan Ø 8-1000 mm.
Lingkungan Perikanan dan Karya Bakti Merupakan daerah padat penduduk terutama Lingkungan karya ba... more Lingkungan Perikanan dan Karya Bakti Merupakan daerah padat penduduk terutama Lingkungan karya bakti yang menjadi salah satu kawasan kumuh di Kelurahan pekat Sumbawa besar. Isu lingkungan seperti kondisi pengolahan air limbah dan sanitasi yang buruk pada kawasan ini mengakibatkan lingkungan yang kurang sehat. Perencanaan sanitasi yang tidak sesuai standar kerap terjadi pada daerah-daerah padat penduduk seperti Lingkungan Karya Bakti. Berdasarkan observasi menunjukkan bahwa jarak Septictank dan sumur air bersih warga ternyata ada yang kurang dari 5 m sehingga air sumur bisa saja terkontaminasi oleh air dari Septictank masyarakat yang mengandung zat dan mikroba berbahaya. Jika tidak cepat di atasi menjadi salah satu dampak yang sangat berbahaya terhadap lingkungan masyarakat maupun makhluk hidup lainnya.Penelitian ini bertujuan untuk mengetahui bagaimana perencanaan dan besarnya anggaran biaya untuk pembangunan IPAL Komunal di Kelurahan Pekat Lingkungan Perikanan dan Karya Bakti khusu...
Uploads
Papers by Ady Purnama