IEA Wind TCP Task 42

Wind Turbine Lifetime Extension
Services

About Task 42

The objectives of the proposed IEA Wind Task on wind turbine lifetime extension are to coordinate international research activities towards the assessment of the remaining operational life of wind turbines near the end of their certified design life and identification of strategies for extending the end of useful life.

This will be done through research activities for determining the probability of failure of different wind turbine components upon continued operation, the examination of procedures that demonstrate the feasibility for life extension, the requirements for maintenance, and to recommend findings to international standards and regulatory bodies.

The partners in this task have significant experience on the above topics and also have analyzed measurements from many commercial wind farms.

A key initial part of this task will be to document the existing state-of-the-art lifetime extension as applied to wind turbines and to identify missing segments that are necessary to assess the remaining life of the wind turbine. The usefulness of different types of wind farm data and the volume of data needed to assess remaining life or plan maintenance will be investigated.

The project will on a continual basis quantify the site-specific remaining useful life of different types of wind turbines and the procedures to establish this based on the level of available data from the site. The scope is valid for both onshore and offshore wind turbines. This will be done by assessing different failure modes of components and quantifying the probability of failure of these turbine components upon life extension by utilizing existing data systematically.

Services

Task 42 Publications

Find more information about our publications and results here

Task 42 Roadmap

09/2019-03/2020

Phase l

Gap analysis on existing procedures required for life extension

04/2020-09/2020

Phase ll

Defining the benchmark study for quantifying uncertainty in life prediction methods

10/2020-03/2021

Phase lll

Implementing the benchmark study, investigating structural health monitoring processes and preventive maintenance

04/2021-09/2021

Phase lV

Comparison of results from benchmark study and determining the value of data

10/2021-03/2022

Phase V

Regulatory frameworks and recommendations to standards

04/2022-08/2022

Phase Vl

Final IEA Task report with recommended verified practice for life extension

Participation

Task 42 Participants

Who can participate in Task 42?

To participate in the research activities of Task 42, researchers must reside in a country that participates in the IEA Wind Agreement AND has agreed by official letter to participate in Task 42. The participating member country of the IEA Wind TCP must designate a lead institution that agrees to the obligations of Task participation (pay the annual fee and agree to perform specified parts of the work plan).

Active researchers (performing part of the work plan) benefit from meetings and professional exchange during the term of the Task. Countries participating in the Task benefit from the information developed by the Task. The value of the research performed is many times the cost of the country participation fee or the labor contributed to carrying out the work plan.

For more information, contact the temporary Operating Agent, Asger Bech Abrahamsen, or the IEA Wind TCP Secretariat.

Participation

Operating Agent

Please contact the Operating Agent below with any questions

????????????????????????????????????

Athanasios Kolios

Task 42 Operating Agent (temporary)

Any Question at

Tel: +45 93 51 15 11

DTU Wind Energy

DTU Risø Campus
Frederiksborgvej 399
4000 Roskilde
Denmark

Monday to Friday

9 am – 17 pm Central European Time

Send your mail at

[email protected]