×
In this paper, we consider the job shop scheduling problem with a particular blocking constraint. The objective is the minimization of the makespan.
A lower bound to solve the job shop scheduling problem with a particular blocking constraint is given and a metaheuristic method based on simulated ...
An algorithm using the heuristic technique of Simulated Annealing to solve a scheduling problem is presented, focusing on the scheduling issues.
People also ask
Jan 4, 2016 · The job shop scheduling problem is one of the most difficult NP hard combinatorial optimization problems. This research investigates finding ...
This paper addresses an extension of Block Job shop Scheduling problem taking AGV. •. Two integer non-linear programming (INLP) models are proposed.
Missing: Lower constrains.
This paper deals with makespan minimization in jobshop scheduling problems with a specific blocking constraint met in several industrial problems. We also ...
May 17, 2017 · A method for solving job-shop scheduling problem using Simulated Annealing has been proposed. The problem explored in this research revolves around the ...
Missing: constrains. | Show results with:constrains.
This paper deals with multi stage jobshop scheduling problem. At each stage, either a fix or a variable number of identical parallel machines are available ...
Missing: constrains. | Show results with:constrains.
In this paper, we study the job-shop scheduling problem with blocking and/or no-wait constraints. A blocking constraint models the absence of storage ...
The preferred neighborhood was embedded into a simulated annealing framework and tested on train-inspired instances [7] as well as benchmark instances given by ...