We named the apartment construction project planning system as FASTrak-APT. Integration of the case-based approach and constraint- based approach has the ...
grammers for the new systems. Development Cost. The development costs of FASTRAK-APT for the two years were calculated at approximately. $42,000 for the ...
The case and constraint based architecture inherently supports cross-checking cases with constraints during the system development and maintenance. This system ...
When the user inputs the design specification of the current project, FASTrak-APT selects the most similar case using a two-step procedure. The first one is ...
Apr 5, 2016 · In FASTrak-APT project [18] developed by Hyundai and KAIST, Constraint-Based Adaptation is used to compensate incomplete cases. In this ...
This case and constraint based project planning expert system for apartment domain, FASTrak-APT, has drastically reduced the time and effort required for ...
The system, FASTRAK-APT, is inspired by the use of previous cases by a human expert project planner for planning a new project and the modification of these ...
This large-scale, case based and mixed-initiative planning system integrated with intensive constraint-based adaptation utilizes compensating incomplete cases ...
Mar 1, 1998 · The system, fastrak-apt, is inspired by the use of previous cases by a human expert project planner for planning a new project and the ...
Nov 4, 2010 · The case- and constraint-based architecture inherently supports cross-checking cases with constraints during system development and maintenance.