×
In this paper, we analyse the properties of flow shop scheduling problems to minimise maximum completion time, and generate a new dominance rule that is ...
In this paper, we analyse the properties of flow shop scheduling problems to minimise maximum completion time, and generate a new dominance rule that is ...
People also ask
Two new PDRs with a leveraged weighting factor are proposed to minimise makespan and average completion time and a new dominance rule is generated that is ...
In this paper, we analyse the properties of flow shop scheduling problems to minimise maximum completion time, and generate a new dominance rule that is ...
A lever concept integrated with simple rules for flow shop scheduling ; Li, Wei ; Freiheit, Theodor ; Miao, Enming · International journal of production research.
Oct 19, 2016 · A lever concept integrated with simple rules for flow shop scheduling · Department of Mechanical engineering, University of Kentucky, Lexington, ...
Jan 17, 2022 · A lever concept integrated with simple rules for flow shop scheduling. Int. J. Prod. Res. 55, 3110–3125 (2017). Article Google Scholar. Li, W ...
For solving the flow-shop scheduling problem, this paper examines elimination techniques that reduce the set of solutions to a subset that must contain the ...
This paper presents an average processing time and lever (APT-LVR) heuristic, integrated with a closed-loop feedback control scheme, to achieve adaptive ...
A lever concept integrated with simple rules for flow shop scheduling. Int. J. Prod. Res. 55, 3110–3125 (2017). https://doi.org/10.1080/00207543.2016.1246762 ...