Jump to content

User:Yaminhussaini93

From Wikipedia, the free encyclopedia

Klang Valley Integrated Transit System

[edit]
Batu Caves-Pulau Sebang Line
1
Keretapi Tanah Melayu KTM Komuter
Overview
Native nameLaluan Seremban
StatusOperational
OwnerKeretapi Tanah Melayu
Line number1 (Blue)
LocaleSelangor
Kuala Lumpur
Negeri Sembilan
Malacca
Termini
Stations26 + 3 reserve stations
Websitewww.ktmb.com.my
Service
TypeCommuter Rail
SystemKTM Komuter
ServicesBatu Caves - Pulau Sebang/Tampin
Operator(s)Keretapi Tanah Melayu
Depot(s)Seremban
Rolling stockKTM Class 92 Komuter CSR EMU
37 six-car trains
History
OpenedAugust 14, 1995 (1995-08-14)
Technical
Line length135 km (84 mi)
Track gauge1,000 mm (3 ft 3+38 in) metre gauge
ElectrificationOverhead 25 KV 50 Hz
Operating speedUp to 120 km/h (75 mph)
Route map
Line 1 - KTM Batu Caves–
Pulau Sebang Line
KC05
Batu Caves
KC04
Taman Wahyu
KC03
Kampung Batu
KC02
Batu Kentonmen
KC01
Sentul
(KTM)
PWTC
KA04
Putra
Bandaraya
KA03
Bank Negara
Pasar Seni
KA02
Kuala Lumpur  ETS 
Muzium Negara
KA01
KL Sentral  ETS 
Multiple fare trips5 6 7 8 10
KB01
Mid Valley
KB02
Seputeh
Bandar Malaysia
Selatan (future)
Bandar
Malaysia
(future)
KB03
Salak Selatan
(KTM)
KB04
Bandar Tasik Selatan
Kuala Lumpur International Airport Terminal Bersepadu Selatan
Sungai Besi
Maju KL
(future)
KB05
Serdang
KB06
Kajang
KB06A
Kajang 2
KB07
UKM
KB08
Bangi
KB09
Batang Benar
KB10
Nilai Kuala Lumpur International Airport
KB11
Labu
 HSR 
KB12
Tiroi
KB13
Seremban
 ETS 
KB14
Senawang
KB15
Sungai Gadut
KB16
Rembau
 ETS 
KB17
Pulau Sebang/
Tampin
 ETS 

Interchange stations

integrated paid area
single fare trip
non-integrated paid area
multiple fare trips
interchange within same building
or cross-platform interchange

Tanjung Malim-Port Klang Line
2
Keretapi Tanah Melayu KTM Komuter
KTM Class 92 trainset at Bangsar Junction towards  KD19  Port Klang
Overview
Native nameLaluan Pelabuhan Klang
StatusOperational
OwnerKeretapi Tanah Melayu
Line number2 (Red)
LocalePerak
Selangor
Kuala Lumpur
Termini
Stations34
Websitewww.ktmb.com.my
Service
TypeCommuter Rail
SystemKTM Komuter
ServicesTanjung Malim - Port Klang
Operator(s)Keretapi Tanah Melayu
Depot(s)Seremban
Rolling stockKTM Class 92 Komuter CSR EMU
37 six-car trains
History
OpenedAugust 14, 1995
Technical
Line length126 km (78 mi)
CharacterAt grade
Track gauge1,000 mm (3 ft 3+38 in) metre gauge
ElectrificationOverhead 25 KV 50 Hz
Operating speed120 km/h (75 mph)
Route map
Line 2 - KTM Tanjung Malim–
Port Klang Line
KA15
Tanjung Malim  ETS 
KA14
Kuala Kubu Bharu  ETS 
KA13
Rasa
KA12
Batang Kali
KA11
Serendah
 ECR 
KA10
Rawang  ETS 
KA09
Kuang
KA08
Sungai Buloh  ETS 
KA07
Kepong Sentral  ETS 
Sri Damansara Timur
KA06
Kepong
Segambut 2
(planned)
KA05
Segambut
Jalan Kuching
(planned)
PWTC
KA04
Putra
Bandaraya
KA03
Bank Negara
Pasar Seni
KA02
Kuala Lumpur  ETS 
Muzium Negara
KA01
KL Sentral  ETS 
Multiple fare trips5 6 7 8 10
KD01
Abdullah Hukum
KD02
Angkasapuri
KD03
Pantai Dalam
KD04
Petaling
KD05
Jalan Templer
KD06
Kampung Dato Harun
KD07
Seri Setia
KD08
Setia Jaya
KD09
Subang Jaya
KD10
Batu Tiga
KD11
Shah Alam
KD12
Padang Jawa
KD13
Bukit Badak
KD14
Klang
Pasar Jawa 11
KD15
Teluk Pulai
KD16
Teluk Gadong
KD17
Kampung Raja Uda
KD18
Jalan Kastam
KD19
Port Klang

Interchange stations

integrated paid area
single fare trip
non-integrated paid area
multiple fare trips
interchange within same building
or cross-platform interchange
Ampang Line & Sri Petaling Line
3 4
Rapid KL (brand)
6-car CSR Zhuzhou Amy Articulated LRV at SP4 PWTC
Overview
Native nameLRT Laluan Ampang & LRT Laluan Sri Petaling
StatusOperational
Owner
Line number3 (Orange) & 4 (Maroon)
LocaleKlang Valley
Termini
Stations36 & 2 reserve
WebsiteMy Rapid
Service
TypeLight rapid transit
SystemRapid KL - LRT KL System 1 (LRT1)
Servicesi) Sentul Timur - Ampang
ii) Sentul Timur - Putra Heights
Operator(s)Rapid Rail
Depot(s)Ampang Depot &
Kuala Sungai Baru Depot
Rolling stockCSR Zhuzhou Articulated LRV
50[1] six-car trainsets
Width: 2.65 m (8 ft 8 in)
Length: 84.0 m (275.6 ft)
Daily ridership170,814 (Fourth Quarter 2018)[2]
Ridership60.96 million (2018)[2]
History
Opened16 December 1996; 27 years ago (1996-12-16)
Last extension30 June 2016; 8 years ago (2016-06-30)
Technical
Line length45.1 km (28.0 mi)
CharacterElevated and at-grade
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
ElectrificationThird rail 750 V DC
Operating speedAverage: 60 km/h (37 mph)
Route map

Kelana Jaya Line
5
Rapid KL (brand)
4-car Set 76 approaching KJ25 Lembah Subang station
Overview
Native nameLRT Laluan Kelana Jaya
StatusFully operational
Owner
Line number5 (Ruby)
LocaleKlang Valley
Termini
Stations37 [3]
Websitemyrapid.com.my
Service
TypeLight rapid transit
SystemRapid KL - LRT KL System 2 (LRT2)
ServicesGombakPutra Heights
Operator(s)Rapid Rail
Depot(s)Subang Depot
Rolling stockBombardier Innovia Metro 200 & 300
266 carriages; 2-car & 4-car trainsets
Width: 2.65 m (8 ft 8 in)
Length: 67.1 m (220 ft) & 33.7 m (111 ft)
Daily ridership245,569 (Fourth Quarter 2018)[4]
Ridership87.2 million (2018)[4]
History
OpenedPhase 1 Kelana Jaya - Pasar Seni
1 September 1998; 26 years ago (1998-09-01)
Phase 2 Pasar Seni - Gombak
1 June 1999; 25 years ago (1999-06-01)
Last extensionKelana Jaya - Putra Heights
30 June 2016; 8 years ago (2016-06-30)
Technical
Line length46.4 km (28.8 mi)
CharacterMostly elevated
Subsurface station(s): Sri Rampai
Underground station(s): Ampang Park - Masjid Jamek
Track gauge1,435 mm (4 ft 8+12 in) standard gauge Standard gauge
ElectrificationFourth rail 750 V DC – Linear induction motor
Operating speed80 km/h (50 mph)
Route map
Line 5 - LRT Kelana Jaya Line
yard
KJ1
Gombak Parking Integrated Transport Terminal Gombak
 ECR 
KJ2
Taman Melati Parking
KJ3
Wangsa Maju Parking
KJ4
Sri Rampai Parking
KJ5
Setiawangsa Parking
KJ6
Jelatek Parking
KJ7
Dato' Keramat
KJ8
Damai
KJ9
Ampang Park
PY16
KJ10
KLCC
KJ11
Kampung Baru
MR8
Bukit Nanas
KJ12
Dang Wangi
AG7
SP7
Masjid Jamek
KJ13
KG16
KJ14
Pasar Seni
Kuala Lumpur KTM ETS
KG15
Muzium Negara
Multiple fare trips9
KJ15
KL Sentral-redONE Parking KTM ETS
KJ16
Bank Rakyat-Bangsar
KJ17
Abdullah Hukum
KJ18
Kerinchi
KJ19
Universiti
KJ20
Taman Jaya Parking
KJ21
Asia Jaya Parking
KJ22
Taman Paramount Parking
KJ23
Taman Bahagia Parking
KJ24
Kelana Jaya Parking
Subang Depot
KJ25
Lembah Subang
KJ26
Ara Damansara Parking
KJ27
CGC-Glenmarie Parking
KJ28
Subang Jaya Parking List of bicycle-sharing systems#Malaysia
KJ29
SS15
KJ30
SS18
KJ31
SB7
USJ7
KJ32
Taipan
KJ33
Wawasan
KJ34
USJ21 Parking
KJ35
Alam Megah Parking
KJ36
Subang Alam Parking
KJ37
SP31
Putra Heights Parking

Interchange stations

integrated paid area
single fare trip
non-integrated paid area
multiple fare trips
interchange within same building
or cross-platform interchange
KLIA Ekspres
6
Express Rail Link
Overview
OwnerExpress Rail Link
Line number6 (Purple)
LocaleKuala Lumpur - KLIA
Termini
Stations3
Service
TypeNon-stop direct airport rail link
SystemERL
Operator(s)Express Rail Link
Rolling stockSiemens Desiro ET 425 M Articulated Electric Multiple Unit & CRRC Changchun Equator Articulated Electric Multiple Unit
Daily ridership6,015 (2018)[5]
Ridership2.2 million (2018)[5]
History
Opened14 April 2002; 22 years ago (2002-04-14)
Technical
Line length57 km
CharacterFully subsurface
Track gauge1 435 mm Standard gauge
Conduction systemWith driver
Route map
Line 6 - ERL KLIA Ekspres Line
5 8 9 Up arrow
KL Sentral Parking
5 9 Down arrow
Bandar Tasik Selatan
Putrajaya & Cyberjaya
Kompleks Rel
Udara Depot
Salak Tinggi
KLIA Terminal 1
7 
KLIA Terminal 2
7 

Interchange stations

integrated paid area
single fare trip
non-integrated paid area
multiple fare trips
interchange within same building
or cross-platform interchange
KLIA Transit
7
Express Rail Link
KLIA Transit train-set at a currently unused station platform at KLIA, which is for KLIA Transit.
Overview
OwnerExpress Rail Link
Line number7 (Teal)
LocaleKuala Lumpur - Bandar Tasik Selatan - Putrajaya - KLIA
Termini
Stations6
Service
TypeCommuter rail (Airport rail link)
SystemERL
Operator(s)Express Rail Link
Rolling stock4 4-car Desiro ET 425 M Articulated EMU
4 4-car CRRC Changchun Articulated EMU
Daily ridership17,987 (Third quarter 2018)[5]
Ridership6.443 million (2017)[5]
History
Opened14 April 2002; 22 years ago (2002-04-14)
Technical
Line length57 km (35 mi)
CharacterMostly subsurface
Surface (Bandar Tasik Selatan - Salak Tinggi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Conduction systemWith driver
Route map
Line 7 - ERL KLIA Transit Line
5 8 9 Up arrow
KL Sentral Parking
5 9 Down arrow
4 Up arrow
Bandar Tasik
Selatan
Terminal Bersepadu Selatan
1 4 Down arrow
Putrajaya Sentral
Kompleks Rel
Udara Depot
Salak Tinggi
KLIA Terminal 1
6 
KLIA Terminal 2
6 

Interchange stations

integrated paid area
single fare trip
non-integrated paid area
multiple fare trips
interchange within same building
or cross-platform interchange
KL Monorail
8
Rapid KL (brand)
Overview
Native nameLaluan Monorel KL
StatusOperational
Owner
Line number8 (light green)
LocaleKuala Lumpur
Termini
Stations11
Websitehttp://www.myrapid.com.my/
Service
TypeStraddle-beam Monorail
SystemRapid KL -People-mover Rapid Transit (PRT)
ServicesKL Sentral Monorail-Titiwangsa
Operator(s)Rapid Rail
Depot(s)Brickfields
Rolling stockScomi SUTRA four-car trains
Scomi/MTrans two-car trains
Daily ridership63,778 (2017)
Ridership23.279 million (2017)
History
Opened31 August 2003
Technical
Line length8.6 km (5.3 mi)
CharacterElevated
Operating speed60 km/h (37 mph)
Route map
Line 8 - KL Monorail Line
3 4 Right arrow
MR11
Titiwangsa
MR10
Chow Kit
MR9
Medan Tuanku
KJ12
Dang Wangi
Multiple fare trips5 Right arrow
MR8
Bukit Nanas
MR7
Raja Chulan
KG18A
Pavilion Kuala Lumpur-
Bukit Bintang
Multiple fare trips9 Right arrow
MR6
Bukit Bintang
MR5
Imbi
MR4
BBCC-Hang Tuah
3 4 Right arrow
AG9
SP9
MR3
Maharajalela
MR2
Tun Sambanthan
Monorail depot
Multiple fare trips1 2 Up arrow
KG15
Muzium Negara
Multiple fare trips9 
MR1
KL Sentral KTM ETS

Interchange stations

integrated paid area
single fare trip
non-integrated paid area
multiple fare trips
interchange within same building
or cross-platform interchange
Sungai Buloh–Kajang Line
9
Rapid KL (brand)
MRT SBK Semantan Platform 1 viewing KLCC at the background.
A Siemens Inspiro EMU stock designed by BMW Group Designworks leaving SBK14 Semantan station.
Overview
Native nameMRT Laluan Sungai Buloh–Kajang
StatusFully operational
Line number9 (Green)
LocaleKlang Valley
Termini
Stations31 + 3 reserved stations
Websitemyrapid.com.my
Service
TypeRapid transit
SystemRapid KL- KVMRT Line 1 (MRT1)
ServicesSungai BulohSemantan (16 Dec 2016)
SemantanKajang (17 July 2017)
Operator(s)Rapid Rail
Depot(s)Sungai Buloh Depot and Kajang Depot
Rolling stockSiemens Inspiro
58 four-car trainsets
Width: 3.1 m (10 ft)
Length: 89.56 m (293.8 ft)
Daily ridership158,247 (Fourth Quarter 2018) [6]
Ridership51.3 million (2018)[6]
History
OpenedPhase 1
16 December 2016; 7 years ago (2016-12-16)[7]
Sungai Buloh - Semantan
Phase 2
17 July 2017; 7 years ago (2017-07-17)
Semantan - Kajang
Technical
Line length51 km (32 mi)
Elevated: 41.5 km (25.8 mi)
Underground: 9.5 km (5.9 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
ElectrificationThird rail, 750 VDC
Conduction systemAutomated and driverless
Line 9 - MRT Kajang Line
KG04
Kwasa Damansara
Parking Integrated Transport Terminal Sungai Buloh
KG05
Kwasa Sentral
Parking
KG05A
Teknologi
(future)
KG06
Kota Damansara-Thomson Hospital
KG07
Surian
KG08
Mutiara Damansara
KG09
Bandar Utama Parking
Shah Alam Line
to Johan Setia
KG10
Taman Tun Dr Ismail-Deloitte
KG12
Phileo Damansara Parking
KG12A
Bukit Kiara Selatan
(future)
KG13
Pavillion Damansara Heights-
Pusat Bandar Damansara
Parking
KG14
Semantan
KG15
Muzium Negara
KL Sentral KTM ETS
Kuala Lumpur KTM ETS
MR1
KG16
Pasar Seni
KG17
Merdeka
AG8
SP8
Plaza Rakyat Pudu Sentral
MR6
Bukit Bintang
KG18A
Pavillion Kuala Lumpur-Bukit Bintang
KG20
Tun Razak Exchange –
Samsung Galaxy
KG21
Cochrane
KG22
AEON-Maluri Parking
AG13
Maluri
KG23
Taman Pertama
KG24
Taman Midah
KG25
Taman Mutiara
KG26
Taman Connaught
Parking
KG27
Taman Suntex Parking
KG28
Sri Raya
KG29
Bandar Tun Hussein Onn
Parking
KG30
Batu 11 Cheras
KG31
Bukit Dukung
Parking
KG32
Taman Mesra
(future)
KG33
Sungai Jernih
Parking
KG34
Stadium Kajang
KG35
Kajang
Parking KTM ETS

Interchange stations

integrated paid area
single fare trip
non-integrated paid area
multiple fare trips
interchange within same building
or cross-platform interchange
Skypark Link
10
Keretapi Tanah Melayu KTM Komuter
Skypark Link train-set at Terminal Skypark station.
Overview
Native nameKTM Laluan Skypark
OwnerKeretapi Tanah Melayu
Line number10 (Brown)
LocaleKuala Lumpur - Subang Jaya - Subang Airport
Termini
Stations3 + 2 reserve stations
Service
TypeAirport rail link - Limited express
SystemKTM Komuter
ServicesKL Sentral - Subang Jaya - Terminal Skypark
Operator(s)Keretapi Tanah Melayu
Depot(s)Sentul
Rolling stockKTM Class 83 EMU
Five 3-car trainsets
History
Opened1 May 2018; 6 years ago (2018-05-01)
Technical
Line length24 km (15 mi)
CharacterGround and elevated
Track gauge1,000 mm (3 ft 3+38 in) metre gauge
Conduction systemWith driver
Route map
Line 10 - KTM KL Sentral-Terminal Skypark Line

service suspended since 15 February 2023

KA01
KL Sentral KTM ETS 1 2 5 6 7 8 9
KD01
Abdullah Hukum
KD02
Angkasapuri
KD03
Pantai Dalam
KD04
Petaling
Kuala Lumpur
Selangor
border
KD05
Jalan Templer
KD06
Kampung Dato Harun
KD07
Seri Setia
KD08
Setia Jaya
KD09
Subang Jaya Parking oBike
Glenmarie
(KTM) (planned)
Sri Subang
(planned)
Terminal Skypark Parking

Interchange stations

integrated paid area
single fare trip
non-integrated paid area
multiple fare trips
interchange within same building
or cross-platform interchange
Bandar Utama–Klang line
11
Rapid KL (brand)
Overview
Native nameLaluan LRT Bandar Utama–Klang
StatusUnder construction
Owner
Line number11 (Sky Blue)
LocaleKlang Valley
Termini
StationsFormer
25 elevated stations and 1 underground station for six-car trainsets in length

Revised
25 elevated stations and for a maximum of four-car trainsets in length
Websitelrt3.com.my
Service
TypeLight rapid transit
SystemRapid KLLRT KL System 3 (LRT3)SelTrac CBTC
ServicesBandar Utama, Petaling Jaya via
Shah Alam to Johan Setia, Klang
Operator(s)Rapid Rail Sdn Bhd
Depot(s)Johan Setia Depot, Klang
Rolling stockCRRC Zhuzhou LRV
Width: 2.7 m (8 ft 10 in)
Length: 114.0 m (374.0 ft)
Former
42 six-cars trainsets[8]

Revised
22 three-cars trainsets
History
Planned openingFormer
Phase 1
31 August 2020; 4 years ago (2020-08-31)
Phase 2
28 February 2021; 3 years ago (2021-02-28)

Revised
28 February 2024; 8 months ago (2024-02-28)
Technical
Line length37 km (23 mi)
CharacterElevated
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
ElectrificationThird rail, 750 VDC
Conduction systemAutomated and driverless
Operating speed80km/hour
Route map

Template:Routemap This is a route-map template for the Bandar Utama–Klang line, a light rail transit line in Malaysia.

Note: Per consensus and convention, most route-map templates are used in a single article in order to separate their complex and fragile syntax from normal article wikitext. See these discussions [1],[2] for more information.


#invoke:infobox Template:MRT Sungai Buloh-Serdang-Putrajaya Line Template:Infobox rail line Template:MRT Circle Line Template:Infobox rail line Template:Putrajaya Monorail Line Template:Routemap Template:Infobox rail line Template:Routemap


Bangi-Puncak Alam Line

[edit]

Template:EngvarB Template:Use dmy dates Template:Infobox rail line Template:Routemap