Line 12 (Mumbai Metro)

From Wikipedia, the free encyclopedia

This is the current revision of this page, as edited by Naren.Ayinala (talk | contribs) at 09:44, 20 August 2024 (Stations). The present address (URL) is a permanent link to this version.

(diff) ← Previous revision | Latest revision (diff) | Newer revision → (diff)

Mumbai Metro Orange Line 12 Extension
Overview
Other name(s)Orange Line
StatusApproved
OwnerMumbai Metropolitan Region Development Authority
Line number12
LocaleNavi Mumbai and Thane, Maharashtra, India
Termini
Stations19
Service
TypeMetro
SystemMumbai Metro
Operator(s)MMRDA
Technical
Line length22.17 km (13.78 mi)
Number of tracks2
CharacterElevated
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Route map

Line 12
to Line 5
0.0000
Kalyan APMC
Kalyan APMC Depot
Central line
0.9541
Ganesh Nagar
2.4303
Pisavali Gaon
3.5103
Golavali
4.6774
Dombivali MIDC
5.6836
Sagaon
6.8103
Sonarpada
7.8000
Manpada (Dombivali East)
Badlapur–Katai Road
9.0582
Hedutane
10.0886
Kolegaon
11.2036
Nilaje Gaon
12.6636
Vadavali
14.0848
Bale
15.5892
Vaklan
16.4372
Turbhe
Pisarve Depot
17.2871
Pisarve Depot
19.0920
Pisarve
Taloja Navi Mumbai Metro Depot
20.6357
Taloja on Vasai Road–Roha line
Panchanand on Line 1
to Line 1

Orange Line 12 (Extension), or the Kalyan-Dombivli-Taloja Line is a proposed line of Mumbai Metro. It will be an extension of Orange Line. The total length of the line is planned to be 22.17 kilometres (13.78 mi), and the route will be completely elevated. The total cost of construction is confirmed to be Rs 2037.20 crore.[1] MMRDA approved the Kalyan-Dombivli-Taloja Metro line. There will be 19 stations. This line will connect Navi Mumbai city with Kalyan-Dombivali city.[2]

Delhi Metro authority show red flag to Kalyan-Dombivli-Taloja Metro line.[3] However the construction work is yet to start and is expected to be completed on 2026 with Revenue Opening Date (ROD) as 01/11/2024. MMRDA in its 138th Authority Meeting held on 26/08/2015 vide Resolution No. 1340 has granted In-principle Approval to develop growth Centre in Kalyan Taluka (area approx. 1089 Ha.) through implement

Stations

[edit]

Line 12 will have 19 stations, all elevated.

Orange Line 12
# Station Name Status Connections Layout
English Marathi
1 Kalyan APMC कल्याण एपीएमसी Under Construction Line 5 ( Partially Under Construction) Elevated
2 Kalyan कल्याण Under Construction None Elevated
3 Ganesh Nagar (Kalyan) गणेश नगर (कल्याण) Under Construction None Elevated
4 Pisavali Gaon पिसावली गाव Under Construction None Elevated
5 Golavali गोलावली Under Construction None Elevated
6 Dombivali MIDC डोंबिवली एमआयडीसी Under Construction None Elevated
7 Sagaon सागांव Under Construction None Elevated
8 Sonarpada सोनारपाडा Under Construction None Elevated
9 Manpada (Dombivali East) मानपाडा (डोंबिवली पूर्व) Under Construction None Elevated
10 Hedutane हेदुतने Under Construction None Elevated
11 Kolegaon कोलेगाव Under Construction None Elevated
12 Nilaje Gaon निळजे गाव Under Construction None Elevated
13 Vadavali वडवली Under Construction None Elevated
14 Bale बाळे Under Construction None Elevated
15 Waklan वाक्लन Under Construction None Elevated
16 Turbhe तुर्भे Under Construction None Elevated
17 Pisarve Depot पिसार्वे आगार Under Construction None Elevated
18 Pisarve पिसार्वे Under Construction None Elevated
19 Amandoot(Taloja) तळोजा Under Construction Line 1 (Navi Mumbai Metro) Elevated

References

[edit]
  1. ^ "Gawar Wins Mumbai Metro Line 12's Construction Contract CA-240". The Metro Rail Guy. 9 February 2024. Retrieved 9 February 2024.
  2. ^ "Mumbai Metro 12 Approved".
  3. ^ "Delhi authority red-flags Kalyan-Taloja Metro line". dna. 2 December 2018.