Jump to content

Template:Brightline West rail

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Amtrak Guy (talk | contribs) at 01:32, 6 July 2024 (This had to be updated because Brightline West began construction on April 23, 2024.). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

This template's initial visibility currently defaults to autocollapse, meaning that if there is another collapsible item on the page (a navbox, sidebar, or table with the collapsible attribute), it is hidden apart from its title bar; if not, it is fully visible.

To change this template's initial visibility, the |state= parameter may be used:

  • {{Brightline West rail|state=collapsed}} will show the template collapsed, i.e. hidden apart from its title bar.
  • {{Brightline West rail|state=expanded}} will show the template expanded, i.e. fully visible.