MV Hallaig: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
→‎Service: wikify; cn
No edit summary
Line 56: Line 56:


==Service==
==Service==
''Hallaig'' was built for the service between [[Sconser]] on Skye and [[Raasay]] and commenced service on 17 October 2013.<ref name="ek"/> The Clydebuilt ''Hallaig'' began her first sea trials on 5 August 2013, eight months after her launch, although she had moved in and out of dry dock in [[Greenock]] under her own power in July 2013. The delay in her entry to service was caused by a last minute change in fire safety regulations which required her and her sister ''Lochinvar'' to have insulation fitted extensively to exposed steel and aluminium on board. In April 2014, ''Hallaig'' temporarily relieved on the [[Mallaig]] - [[Armadale]] service after {{MV|Coruisk}} was involved in an incident at [[Dunoon]] and had to have her bow extensively rebuilt.{{cn|date=April 2014}}
''Hallaig'' was built for the service between [[Sconser]] on Skye and [[Raasay]] and commenced service on 17 October 2013.<ref name="ek"/> The Clydebuilt ''Hallaig'' began her first sea trials on 5 August 2013, eight months after her launch, although she had moved in and out of dry dock in [[Greenock]] under her own power in July 2013. The delay in her entry to service was caused by a last minute change in fire safety regulations which required her and her sister ''Lochinvar'' to have insulation fitted extensively to exposed steel and aluminium on board. In April 2014, ''Hallaig'' temporarily relieved on the [[Mallaig]] - [[Armadale]] service after {{MV|Coruisk}} was involved in an incident at [[Dunoon]] and had to have her bow extensively rebuilt.<ref>{{cite news| url=http://www.whfp.com/2014/04/17/repairs-delay-for-regular-armadale-ferry/| title=Repairs delay for regular Armadale ferry| author=Keith MacKenzie| date=17 April 2014| work=West Highland Free Press| accessdate=7 June 2014}}}}</ref>


==Footnotes==
==Footnotes==

Revision as of 20:05, 7 June 2014

Warning: Display title "MV <i>Hallaig</i>" overrides earlier display title "MV<i> Hallaig</i>" (help).
History
UK
NameMV Hallaig
NamesakeHallaig
OwnerCaledonian Maritime Assets Limited
OperatorCaledonian MacBrayne
Port of registryGlasgow
RouteSconser - Raasay
Ordered2011[1]
BuilderFerguson Shipbuilders, Port Glasgow
Cost£10,000,000
Yard number725
Launched17 December 2012
Christenedby Nicola Sturgeon
Completed2013
StatusIn Service
General characteristics
Typero-ro vehicle and passenger ferry
Tonnage135 DWT
Length43.5 m (143 ft)
Beam12.2 m (40 ft)
Draught1.73 m (5 ft 8 in)
Installed powerlist error: <br /> list (help)
Diesel Electric Hybrid: 3 x Volvo Penta Marine D13 MG and Lithium Ion batteries
Machinery: 2 x Permanent Magnet Motor 375kW each[3]
PropulsionVoith 16 R5 EC/90-1 Units
Speed9 kn (expected service)
Capacity150 passengers; 23 cars
Notes[2]

MV Hallaig is a pioneering Diesel Electric Hybrid ferry built for the Caledonian MacBrayne service between Skye and Raasay.

History

Hallaig was launched in December 2012 at Ferguson Shipbuilders in Port Glasgow by Deputy First Minister Nicola Sturgeon.[4] The name comes from a poem, written by Sorley MacLean, itself named after an abandoned township on Raasay.[5] Hallaig is the first commercial ship to be fully built and delivered on the Clyde in over five years. The Scottish Government invested more than £20 million in the project.[4]

Layout

Hallaig is the first of two vehicle roll-on roll-off hybrid-powered ferries. She has a low-carbon system of diesel electric and lithium ion battery power.[4]

The 135-ton vessel is nearly 150 ft long and will accommodate 150 passengers, 23 cars or two HGVs.[6]

Service

Hallaig was built for the service between Sconser on Skye and Raasay and commenced service on 17 October 2013.[4] The Clydebuilt Hallaig began her first sea trials on 5 August 2013, eight months after her launch, although she had moved in and out of dry dock in Greenock under her own power in July 2013. The delay in her entry to service was caused by a last minute change in fire safety regulations which required her and her sister Lochinvar to have insulation fitted extensively to exposed steel and aluminium on board. In April 2014, Hallaig temporarily relieved on the Mallaig - Armadale service after MV Coruisk was involved in an incident at Dunoon and had to have her bow extensively rebuilt.[7]

Footnotes

  1. ^ "Caledonian Maritime Assets Limited announces Scottish shipbuilder as preferred bidder for Low Emissions Hybrid Ferries project". CMAL. 3 November 2011. Retrieved 13 January 2013.
  2. ^ "£20 million ferry deal sees world-first launched on Clyde". CMAL. 17 December 2012. Retrieved 13 January 2013.
  3. ^ "Hallaig". Ships of Calmac. Retrieved 13 January 2013.
  4. ^ a b c d "Hybrid ferry Hallaig to be launched". East Kilbride News. 17 December 2012. Retrieved 13 January 2013.
  5. ^ "NAME Announced For New Ferry". Inverclyde Now. 4 October 2012. Retrieved 13 January 2013.
  6. ^ "Hybrid Ferries Project". CMAL. Retrieved 13 January 2013.
  7. ^ Keith MacKenzie (17 April 2014). "Repairs delay for regular Armadale ferry". West Highland Free Press. Retrieved 7 June 2014.}}