The Maria Gleta Power Plant is a gas-fired power plant in Godomey, Atlantique Department, Benin.
Maria Gleta Power Plant | |
---|---|
Country | Benin |
Location | Godomey, Atlantique Department |
Coordinates | 6°25′34.3″N 2°18′23.5″E / 6.426194°N 2.306528°E |
Status | Operational |
Construction began | 2017 |
Commission date | 2019 |
Thermal power station | |
Primary fuel | Natural gas |
Power generation | |
Units operational | 7 |
Nameplate capacity | 127 MW |
History
editThe power plant was inaugurated on 29 August 2019 after two years of construction works.[1][2]
Technical specifications
editThe power plant has an installed capacity of 127 MW. It consists of seven generators.[1]