A survey on software cost estimation in the chinese software industry

Published: 09 October 2008 Publication History

Abstract

Although a lot of attention has been paid to software cost estimation since 1960, making accurate effort and schedule estimation is still a challenge. To collect evidence and identify potential areas of improvement in software cost estimation, it is important to investigate the estimation accuracy, the estimation method used, and the factors influencing the adoption of estimation methods in current industry. This paper analyzed 112 projects from the Chinese software project benchmarking dataset and conducted questionnaire survey on 116 organizations to investigate the above information. The paper presents the current situations related to software project estimation in China and provides evidence-based suggestions on how to improve software project estimation. Our survey results suggest, e.g., that large projects were more prone to cost and schedule overruns, that most computing managers and professionals were neither satisfied nor dissatisfied with the project estimation, that very few organizations (15%) used model-based methods, and that the high adoption cost and insignificant benefit after adoption were the main causes for low use of model-based methods.

References

[1]
Beohm, B. W. 1981. Software Engineering Economics. Prentice Hall PTR, Upper Saddle River, NJ.
[2]
Briand and Wieczorek, L. C. 2002. Resource estimation in software engineering. In: J. J. Marcinak, Editor, Encyclopedia of Software Engineering, John Wiley & Sons, New York.
[3]
Moløkken, K., Jørgensen, M., Tanilkan, S. S., H, Gallis, Lien, A. C. and Hove, S. E. 2004. A survey on software estimation in the Norwegian industry. In Proceedings of the 10th International Symposium on Software Metrics.
[4]
Wydenbach, G. and Paynter, J. 1995. Software Project Estimation: a Survey of Practices in New Zealand. New Zealand Journal of Computing. 6, 1B, 317--327.
[5]
Shepperd, M. J. 2007. Software Project Economics: A Roadmap. International Conference on Software Engineering: Future of Software Engineering. 304--315.
[6]
Jenkins, A. M., Naumann, J. D. and Wetherbe, J. C. 1984. Empirical Investigation of Systems Development Practices and Results. Information & Management, 7: p. 73--82.
[7]
Phan, D. 1990. Information Systems Project Management: an Integrated Resource Planning Perspective Model, in Department of Management and Information Systems. Arizona: Tucson.
[8]
Heemstra, F. J. 1992. Software cost estimation. Information and Software Technology. 34, 10, 627--639.
[9]
Lederer, A. L. and Prasad, J. 1995. Causes of Inaccurate Software Development Cost Estimates. Journal of Systems and Software. 31, 125--134.
[10]
Bergeron, F. and St-Arnaud, J.-Y. 1992. Estimation of Information Systems Development Efforts: A Pilot Study. Information & Management. 22, 239--254.
[11]
Sauer, C. and Cuthbertson, C. 2003. The State of IT Project Management in the UK 2002--2003. Templeton College, University of Oxford.
[12]
Jørgensen, M. and Moløkken, K. How large are software cost overruns? A review of the 1994 Chaos Report. Information and Software Technology. 48, 4 (Apr. 2006).
[13]
Moores, T. T. and Edwards, J. S. 1992. Could Large UK Corporations and Computing Companies Use Software Cost Estimating Tools? - A Survey. European Journal of Information Systems. 1, 5, 311--319.
[14]
McAulay, K. 1987. Information Systems Development and the Changing Role of MIS in the Organisation. First New Zealand MIS Management Conference, Wellington.
[15]
Briand, L. C., Emam, K. E. and Bomarius, F. 1998. COBRA: a hybrid method for software cost estimation, benchmarking, and risk assessment. Proceedings of the 20th international conference on Software engineering. (Kyoto, Japan, April 19-25, 1998). 390--399.
[16]
Ruhe, M., Jeffery, R. and Wieczorek, I. 2003. Cost estimation for web applications. Proceedings of the 25th International Conference on Software Engineering. Portland, Oregon, May 03-10, 2003).
[17]
Jørgensen, M. 2004. A review of studies on expert estimation of software development effort. Journal of Systems and Software. 70, 1-2, 37--60.
[18]
Lederer, A. L. and Prasad, J. 1992. Nine Management Guidelines for Better Cost Estimating. Communications of the ACM. 35, 2 (Feb, 1992), 51--59.
[19]
Boehm, B., Abts, C. and Chulani, S. 2000. Software Development Cost Estimation Approaches - A Survey. Annals of Software Engineering. 10, 177--205.
[20]
Stutzke, R. D. 2005. Estimating Software-Intensive Systems. Addison Wesley.
[21]
Boehm, B., et al, Software Cost Estimation with COCOMO II. 2000. Prentice Hall.
[22]
Park, R. E., Goethert, W. B. and Webb, J. T. 1994. Software cost and schedule estimating: A process improvement initiative. Special Report CMU/SEI-94-SR-3, Software Engineering Institute, Carnegie Mellon University. URL = http://www.sei.cmu.edu/publications/documents/94.reports/94.sr.003.html.
[23]
McConnell, S. 1996. Rapid Development: Taming Wild Software Schedules. Microsoft Press.
[24]
Gryphon, S., Kruchten, P., McConnell, S. and Little, T. 2006. Letters: The Cone of Uncertainty. IEEE Software. 23, 5, (September/October, 2006), 8--10.
[25]
Conte, S. D., Dunsmore, H. E. and Shen, V. Y. 1986, Software Engineering Metrics and Models. Menlo Park: Benjamin-Cummings.
[26]
Kasunic, M. 2005. Designing an Effective Survey. Technical Handbook. Pittsburg: Software Engineering Institute. Carnegie Mellon University. (September, 2005).
[27]
Bryman, A. and Cramer, D. 2005. Quantitative Data Analysis with SPSS, Routledge.
[28]
Venkatesh, V. and et. al, User Acceptance of Information Technology: Toward a Unified View. MIS Quarterly. Vol. 27 No. 3, 425--478
[29]
Keung, J., Jeffery, R. and Kitchenham, B. The Challenge of Introducing a New Software Cost Estimation Technology into a small Software Organization. Proceedings of the 2004 Australian Software Engineering Conference (ASWEC'04)
[30]
Yang, D., et al, 2006. "COCOMO-U: An Extension of COCOMO II for Cost Estimation with Uncertainty", In: Wang, Q., Pfahl, D., Raffo, D. M., Wernick, P. (eds.) Software Process Change. LNCS, 3966, 132--141. Springer, Heidelberg (2006)
[31]
Yang, D., Boehm, B., Yang, Y., Wang, Q. and Li, M. 2007. Coping with the cone of uncertainty: an empirical study of the SAIV process model. In Proceedings of International Conference on Software Process. (May, 2007) 37--48

Cited By

View all

Recommendations

Comments

Information & Contributors

Information

Published In

cover image ACM Conferences
ESEM '08: Proceedings of the Second ACM-IEEE international symposium on Empirical software engineering and measurement
October 2008
374 pages
ISBN:9781595939715
DOI:10.1145/1414004
  • General Chair:
  • Dieter Rombach,
  • Program Chairs:
  • Sebastian Elbaum,
  • Jürgen Münch
Permission to make digital or hard copies of all or part of this work for personal or classroom use is granted without fee provided that copies are not made or distributed for profit or commercial advantage and that copies bear this notice and the full citation on the first page. Copyrights for components of this work owned by others than ACM must be honored. Abstracting with credit is permitted. To copy otherwise, or republish, to post on servers or to redistribute to lists, requires prior specific permission and/or a fee. Request permissions from [email protected]

Sponsors

Publisher

Association for Computing Machinery

New York, NY, United States

Publication History

Published: 09 October 2008

Permissions

Request permissions for this article.

Check for updates

Author Tags

  1. estimation method
  2. estimation model
  3. software cost estimation

Qualifiers

  • Research-article

Conference

ESEM '08
Sponsor:

Acceptance Rates

Overall Acceptance Rate 130 of 594 submissions, 22%

Upcoming Conference

Contributors

Other Metrics

Bibliometrics & Citations

Bibliometrics

Article Metrics

  • Downloads (Last 12 months)17
  • Downloads (Last 6 weeks)3
Reflects downloads up to 14 Sep 2024

Other Metrics

Citations

Cited By

View all

View Options

Get Access

Login options

View options

PDF

View or Download as a PDF file.

PDF

eReader

View online with eReader.

eReader

Media

Figures

Other

Tables

Share

Share

Share this Publication link

Share on social media