🌟Enhance your #energysolutions step by step with #Dyness!🔋
🚀Watch this C&I ESS- DH100F installation guide #video, with clear and detailed instructions, you'll quickly learn how to properly install the Dyness C&I #ESS- DH100F.
#DH100F series all-in-one multi-function integration, support PV and generator access, grid and off-grid switching. Stand-alone capacity 71~100kWh selectable, 280Ah LFP battery with high energy density, #EMS intelligent control, modular design, reduce infrastructure cost.
👇Watch the full demonstration now!
#3D#InstallationGuide#Commercial
Der TechTalk des TeDo Verlags zeigt auf, welche Maßnahmen zur Erhöhung des aktiven und passiven Störlichtbogenschutzes ergriffen werden können. Rittal und Dehn erläutern die Möglichkeiten und Chancen für einen optimalen Schutz!
#Rittal#Energy#Power#OneEnergy#AllElectricSociety
🎤TechTalk by TeDo Verlag: Effective protection of switchgear 🎤
What unites the control cabinet for the operation of machines and systems, the power distribution in buildings and the switchgear in data centers? The need for effective and reliable protection! On the one hand, this involves the permanent availability of the system and, on the other, the safety of life and limb of employees.
The TechTalk from TeDo Verlag highlights measures that can be taken to increase active and passive arc fault protection. Rittal and Dehn explain the possibilities and opportunities for optimum protection.
Find out more and take a look: https://hubs.li/Q02qJ5qH0 👈
#ElectrifyYourSystem#AllElectricSociety#OneEnergy#EnergyFlash#ElectrifyingIdeas#EnergyTransition#EnergyManagement#Rittal#Energiewende#Energiemanagement
Das neue AC/DC Powermodul für Kontaktkühlung von TDK-Lambda erreicht durch den Einsatz neuester #GaN- und #SiC-Halbleiter einen Wirkungsgrad von 92% und kann so bei Abmessungen von gerade einmal 101,6 x 61 mm eine Ausgangsleistung von 504W bereitstellen. Damit ist das Metallgehäuse mit #Baseplate noch etwas kompakter als ein Standard Fullbrick.
Zudem verfügt es über eine #PMBus™-Schnittstelle zur Steuerung und Überwachung verschiedener Geräteparameter wie Ausgangsspannung, Remote ON/OFF oder Baseplate-Temperatur.
Das Modul hat einen Weitbereichseingang (85-265Vac) und liefert je nach Model Ausgangsspannungen von 12V, 28V oder 48V. Per #Trim-Pin oder PMBus lässt sich die Ausgangsspannung jeweils im Bereich von +/-20% einstellen.
Die zulässige Baseplate-Temperatur erstreckt sich von #-40°C bis +100°C. Das Kühlungskonzept kann jeder Anwender individuell auf seine Anforderung anpassen.
Entwickeln Sie an eine Applikation, die eine solche Stromversorgung benötigt? Sprechen Sie mich an, mit meinem Ingenieur Team unterstütze ich Sie sehr gerne.
Sind Ihnen bereits Situationen begegnet, in denen die Gasdetektion nicht wie erwartet funktioniert hat? Bei 𝗥𝗜𝗞𝗘𝗡 𝗞𝗘𝗜𝗞𝗜 setzen wir auf 𝟭𝟳 𝘂𝗻𝘁𝗲𝗿𝘀𝗰𝗵𝗶𝗲𝗱𝗹𝗶𝗰𝗵𝗲 𝗦𝗲𝗻𝘀𝗼𝗿𝗱𝗲𝘁𝗲𝗸𝘁𝗶𝗼𝗻𝘀𝗽𝗿𝗶𝗻𝘇𝗶𝗽𝗶𝗲𝗻, um zuverlässige Gasdetektoren für diverse Umgebungen anzubieten.
Erfahren Sie mehr über das Detektionsprinzip und die Funktionen jedes einzelnen unter: https://lnkd.in/gJHeyyas#rikenkeikigmbh#gasdetektion#sicherheit#detektionsprinzipien
Gerade mal ein paar Monate nach Marktstart in Deutschland stellt Aira heute seine eigene Aira Wärmepumpe vor, um die Abhängigkeit deutscher und europäischer Haushalte von Öl und Gas weiter zu verringern und die Elektrifizierung des Heizsektors zu beschleunigen.
🚩 Die Markteinführung der Aira Wärmepumpe, flankiert von einem umfassenden Serviceversprechen, einer 15-jährigen Komfort-Garantie und dem flexiblen Ratenzahlungsmodell, ist ein weiterer Meilenstein in dem Bestreben, die nächste Generation sauberer Energietechnologien für Millionen von Menschen zugänglich zu machen.
💡 Die Aira Wärmepumpe arbeitet mit #AiraIntelligence – einer Reihe von intelligenten, vernetzten Funktionen, die kontinuierlich die Anforderungen des Haushalts erlernen – um Heiz- und Warmwassermuster präzise zu planen. So wird nicht nur der Komfort erhöht, sondern auch die Energieeffizienz optimiert.
🫰🏼 Mit der Einführung der Aira Wärmepumpe bietet Aira deutschen Verbraucher:innen nun auch eine maßgeschneiderte Finanzierungsoption an, um die Technologie zu geringen monatlichen Kosten in der Breite zugänglich zu machen.
Hier gibt es alle Infos: https://lnkd.in/eTvJv7_p
Today marks a historical moment in our story as we proudly unveil the Aira Heat Pump! 🚀 Our unique end to end home energy solution will take Europe off gas and accelerate the electrification of home heating.
The Aira Heat Pump system is full of smart, connected features which heat your home and hot water with optimal efficiency. We call it Aira Intelligence. Constantly learning your home routines to create the just-right indoor climate.
Our product and engineering team have been working on heat pumps for over 20+ years and have used their expertise and deep understanding of the technology to create the new Aira Heat Pump.
We said 2024 was going to be exciting!
More on the launch here: https://lnkd.in/etEFx3BU#AiraHeatPump#CleanEnergyTech
The application of wind-assisted propulsion systems across a variety of vessel types is nearing a tipping point with deployment likely to increase rapidly, but the lack of standardisation for verifying fuel savings and concerns about equipment availability must be addressed.
Dr Santiago Suarez de la Fuente, LR’s Ship Performance Manager, said: “Wind-assisted propulsion systems are increasingly being used by ship operators to reduce fuel consumption, meet energy efficiency regulations and minimise exposure to carbon costs. With 29 installations between 2018-2023 and 72 in the orderbook, LR’s new research report demonstrates that there is growing confidence in the available solutions.”
Download our new report to learn more: https://loom.ly/m4saWbc#EnergyTransition#Retrofit#Windpower
Passend zu einem aktuellen Diskussionspunkt: Ist es besser, den Bremswiderstand im Schaltschrank zu verbauen oder außerhalb?
Meine Meinung: Am besten eine Lösung verwenden, die gar keinen Bremswiderstand benötigt!
Mit der integrierten Netzrückspeisung des i550motec:
✅ sparen Sie sich die Beschaffungs- und Montagekosten für den Bremswiderstand.
✅ schonen Sie die Umwelt, sowie den Geldbeutel, durch die höhere Energieeffizienz.
✅ gibt es keine starke Erwärmung des Bremswiderstandes, so dass eine Verbrennungsgefahr ausgeschlossen ist.
Diese Lösung ist ein Gewinn für den Anlagenbauer und den Betreiber. Besser geht es nicht! 💡
As individual as your application – Reduce energy consumption, using inverters for motor control 🍃
Today it is all about the energy efficiency of your machine! Drive systems are responsible for about 70% of the electricity demand in industry. So why not start saving energy directly at the motor control? Check out our inverter!
There are several ways to achieve greater energy efficiency:
👉 Energy-saving mode
👉 Automatic adjustment of the output frequency to the load
👉 Recovery of braking energy into the grid
Our drive packages guarantee low electricity costs, high energy efficiency and long-term planning for future regulations.
Find out more about our inverter portfolio ➡️ https://lnkd.in/exSKpPhg#Lenze#energyefficiency#motorcontrol
Alpitronic Hypercharging - Unleash Scalable Megawatt Power
Get a first look at Alpitronic's upcoming Megawatt Charger, designed to deliver high power with industry-leading efficiency.
Key Features:
– MW power unit with up to 1500 A per dispenser
– 97% efficiency driven by cutting-edge technology
– SiC power stack for high power density and a small footprint
– Scalable to meet future power demands
Stay tuned for more information!
#Alpitronic#Hypercherger#MCS#megawattcharging#TruckCharging#CommercialVehicleCharging#ChargingInfrastructure#ElectricVehicle
Da wir häufiger gefragt werden, wie mit Bestandsgeräten umgegangen werden soll bzw. mit neuen steuerbaren Verbrauchseinrichtungen, die (noch) über keine EEBUS-Schnittstelle verfügen.
Hier im Beitrag stellt gridX eine Lösungsmöglichkeit vor 💡:
🤨 We know a lot about the theory of §14a EnWG, but what about the technical implementation?
💡For example, when a DSO needs to dim or limit the consumption, they send a steering signal to the Smart Meter Gateway (SMGW) and the Control Box via a secure CLS Connection, but what happens next? How does this work with multiple assets?
🙅 Having an analog wiring or relays to all assets makes it hard for asset owners to fulfill their documentation requirements and it could lead to a complete shut-off of all devices, even when there is local production available.
🧠 So, what’s the solution?
⚡️A digital connection to an EMS via EEBUS.
🏋️♂️ For gridX, this plays to our strengths: handling a limitation signal in a HEMS setup. Our energy management system can adjust the consumption of assets accordingly while simultaneously minimizing the impact and maximizing the comfort for owners.
🗣️ And if those assets don’t “speak” the same language as EEBUS Initiative e.V. , that’s absolutely fine. As we’ve said before, the gridBox is a polyglot able to translate non-EEBUS speaking assets into other protocols such as Modbus TCP or OCPP. This enables §14a EnWG conform control for all assets.
To learn more about how we are compliant with §14a, check out our Grid Signal Processor module: https://hubs.li/Q02D0Xh40#paragraph14a#14a#EnWG#energymanagement#energytech#gridtechnology#gridoperations#EEBUS
⚡ Handeln die europäischen Regulatoren hier etwas kurzsichtig? Ich fürchte ja! ⚠
Ich befürchte, dass hier nicht alles zu Ende gedacht wurde und die Behauptung, dass mit dieser Maßnahme "die Sicherheit der Stromversorgung durch Optimierung der Nutzung des bestehenden Netzes erhöht wird", sehr kurzsichtig ist!
Denn es gibt auch erhebliche Schattenseiten dieser Ausweitung des Handels, die systemische Effekte ignoriert. Robuste Systeme zeichnen sich eben durch Redundanzen und Reserven aus.
In einem System, in dem großräumiger (verlustbehafteter = Wärme) Stromaustausch stattfindet, kann eine Störung auch zu großräumigen Ausfällen führen, da im Störungsfall (z.B. System Split) die Kapazitäten zum Ausgleich fehlen. Dies gilt umso mehr, je mehr Momentanreserve durch EE-Einspeisung verloren geht. Wurde dies wirklich berücksichtigt?
👉 https://lnkd.in/dKj8qAwk#Vorsorge #krisenfit.jetzt
⏰ ACER alerts European Parliament and European Commission of pressing need for power grid operators to maximise the electricity transmission capacity they make available for cross-border trading.
📄 Today, ACER releases its Opinion, addressed to the European Parliament and European Commission, highlighting the urgency for #Transmission#SystemOperators (#TSOs) to meet their obligation of making #70% of transmission capacity available for cross-border #electricity trading by the end of 2025.
⌛ As making transmission capacity available to trade electricity with neighbours is crucial to achieving the ambitious political objectives set for #renewable generation, and as the legal deadline (of the end of 2025) for doing so nears, steps to realise the minimum 70% requirement become more urgent.
🤔 Why is maximising transmission capacity important?
Maximising interconnection capacity by reaching the minimum 70% requirement:
👉 is a pre-requisite for the #EnergyTransition;
👉 enhances security of #ElectricitySupply by optimising the use of the existing grid;
👉 mitigates prices and price volatility;
👉 provides the #market with much-needed flexibility; and
👉 ensures a level playing field between domestic and #CrossBorder trades.
❗ There is much at stake in not reaching the minimum 70% requirement and Member States are still far off it.
🎯 Where are we on the path to reaching 70% minimum requirement and how to get there?
The last ACER report (July 2023) found that most Member States in highly meshed areas of the #PowerGrid made available on average 30-50% of the capacity for certain network elements. In parallel, the costs of managing grid congestions in the #EU exceeded €4 billion in 2022.
There are 3 tools foreseen by the EU rules for maximising capacity for cross-border electricity #trading:
🔵 TSO to do optimal and coordinated actions to relieve grid congestion;
🔵 TSOs to undertake targeted grid developments; and
🔵 TSOs to complete the bidding zone review process.
This ACER Opinion calls for the swift implementation by Member States and TSOs of the 3 tools foreseen by EU rules to get us to the 70% minimum requirement.
Read more about the ACER Opinion 🔗 https://lnkd.in/dRex8ykU