Genex Power

Genex Power

Renewable Energy Power Generation

Sydney, NSW 9,169 followers

Genex Power Limited is a renewable energy generation and storage developer based in Australia.

About us

Genex Power Limited is Australian-based public company focused on developing a diverse portfolio of renewable energy generation and storage projects in Australia. Our operations span Queensland and New South Wales, encompassing large-scale batteries, pumped storage hydro, wind, and solar energy solutions. As of 31 July 2024, Genex is a wholly owned subsidiary of Electric Power Development Co., Ltd (J-POWER). Our flagship project, the Kidston Clean Energy Hub in North Queensland, represents the co-location of solar, pumped storage hydro, and wind energy on a large scale. It includes the 50MW Stage 1 Solar Project, which is already operational, the 250MW/2,000MWh Kidston Pumped Storage Hydro Project currently under construction, and the up to 258MW Kidston Wind Project in development. Genex also has a 50MW/100MWh operational battery energy storage system (BESS) at Bouldercombe in central Queensland and a 50MW operating solar farm at Jemalong in central west NSW. In line with our growth strategy, we are expanding our dynamic portfolio with the Bulli Creek Clean Energy Park, located 45km southwest of Millmerran, Queensland. This multi-stage development aims to achieve up to 2 GW of large-scale solar and BESS capacity. With a committed portfolio of 400MW and up to approximately 2.3GW of renewable energy and storage projects in the company’s pipeline, Genex is well placed in its strategy to become a leading renewable energy and storage company in Australia. Subscribe here and get the latest updates straight to your inbox: https://genexpower.com.au/subscribe/

Industry
Renewable Energy Power Generation
Company size
11-50 employees
Headquarters
Sydney, NSW
Type
Public Company
Founded
2015
Specialties
Renewable Energy, Energy Production, and Energy Storage

Locations

Employees at Genex Power

Updates

  • View organization page for Genex Power, graphic

    9,169 followers

    Global Hydropower Day 2024! 💧🌍 #GlobalHydropowerDay is an annual event, started in 2022, and dedicated to celebrating the role of #hydropower in advancing clean energy and sustainable development worldwide. The day raises awareness about the ongoing innovations and projects in the hydropower sector, promoting engagement between governments, industry leaders, and communities to drive the global energy transition. In collaboration with our stakeholder Clean Energy Council, we are all working together and doing our part for Australia. Genex Power 250MW Kidston Pumped Storage Hydro Project (K2-Hydro) has become a beacon of #innovation and #progress. K2-Hydro stands out for its innovative reuse of existing mining pits, Wises and Eldridge, as its upper and lower reservoirs. With a significant water height difference and the ability to store large volumes of water, the project operates with substantial efficiency. ♻ It can generate an impressive 2,000MWh of electricity per cycle, providing 250MW of power over 8 hours - enough to power over 100,000 homes! Designed to operate for 80 years, K2-Hydro is a cornerstone of the #KidstonCleanEnergyHub, which includes the already operating 50MW Kidston Solar Farm and a wind project in development. 🌞💨 K2-Hydro is contributing to the nation’s energy security whilst boosting regional economies and creating job opportunities.👷♂️ ✨

    View organization page for Clean Energy Council, graphic

    79,462 followers

    Happy Global Hydropower Day. One of the most mature forms of renewable generation available, hydropower provided 6.5 per cent of Australia’s electricity in 2023. Hydropower will play a crucial role in Australia’s energy future, providing not just generation but storage as well. With that in mind, it’s great to see the progress of Genex Power's Kidston Pumped Storage Hydro Project, a 250 MW project scheduled to be commissioned in early 2025. When connected to the grid, it will be the first pumped hydro project built in Australia for over 40 years. Check out the video for more information. For more on large-scale storage, visit our website: https://lnkd.in/g8fEtiBP #cleanenergy #renewableenergy #hydropower

  • View organization page for Genex Power, graphic

    9,169 followers

    Exciting Partnership Update! We’re thrilled to announce that Genex Power has strengthened its partnership with Stanwell Corporation Limited through a 15-year Power Purchase Agreement (PPA) for 550MW of capacity from our Bulli Creek Stage 1 Solar Project (BCS)! Here are some key highlights: 🌞 Capacity: Stanwell will purchase 550MW from the 775MW BCS solar project, set to become the largest solar farm in the National Electricity Market. 👷♂️ Jobs: Up to 800 clean energy jobs will be created during the construction phase, which kicks off in early 2025. ⚡ Sustainability: This project is a major step toward Queensland's clean energy future, with the BCS expected to become operational in 2027. ⚙ Operations & Maintenance: A new 5-year contract with Stanwell Asset Maintenance Company (SAMCo) to manage operations for Genex’s 50MW Kidston Solar Farm. 📈 Future Growth: We are also exploring further partnerships with Stanwell to expand our clean energy portfolio. This agreement, securing 71% of the BCS capacity, marks a significant milestone for our project, as we move toward a final investment decision by the end of 2024. ✍ Stay tuned as we continue to drive the transition to renewable energy and create opportunities across Australia! Read the media release ➡ https://lnkd.in/gcNjyKqj #Renewableenergy #Solarpower #Sustainability #Cleanenergyjobs #Partnerships #Energytransition #Bullicreek

  • View organization page for Genex Power, graphic

    9,169 followers

    At Genex Power, we recognise that our projects have a substantial impact on the communities where we develop and build 🌍. That’s why we are committed to being socially responsible and making positive contributions to these areas 🤝. One of the ways we foster an impactful footprint in affected communities is through the promotion of education, training, and career pathways at a grassroots level 🎓. Over the past few weeks, we’ve had the privilege of participating in the Careers for Net Zero roadshow 🚀a collaborative initiative by Clean Energy Council and Energy Efficiency Council! Australia’s clean economy is driving the creation of thousands of exciting career and training opportunities for students, graduates, career changers, and job seekers from all walks of life and backgrounds, especially in regional Queensland. At Genex Power, we were delighted to showcase the work, apprenticeships, and traineeship opportunities tied to the 775MW Bulli Creek Stage 1 Solar Project ☀️, which forms part of the multi-stage Bulli Creek Clean Energy Park, in Toowoomba on August 6th, alongside our preferred EPC contractor, PCL Construction. We then joined our civil works contractor Nacap Pty Ltd Paula P. at the Townsville event on August 14th, focusing on the up to 258MW K3-Wind Project 🌬️, which is part of the Kidston Clean Energy Hub, and the many diverse upcoming roles available! #Careersfornetzero is an excellent networking platform for locals who otherwise may not be aware of the opportunities available to them and can benefit from key insights on how to take the first step forward toward a place in this emerging and purposeful industry! #NetZero #RenewableEnergy #Sustainability #CleanEnergy #CareerOpportunities #CommunityImpact

    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
      +8
  • View organization page for Genex Power, graphic

    9,169 followers

    We are thrilled to be at the forefront of innovation with our flagship pumped storage hydro project, achieving several industry firsts. 🌟 Not only is this the first pumped storage hydro project developed in over 40 years, but it also ingeniously repurposes a disused gold mine into a large-scale water battery. 💧🏗️ We are proud to have set a new benchmark as a business case study in the safe and efficient execution of draw line installation for the project, using Infravision's cutting-edge drone technology! 😱 🚁 Infravision, in collaboration with Powerlink Queensland, has been instrumental in this achievement. Their innovative Unmanned Aircraft Systems (UAS) facilitated the power line stringing over an impressive 186-kilometre transmission line. This line connects the Aurumfield Substation in Kidston to the Guybal Munjan Substation in Mount Fox and will help the hydro project distribute power into the national electricity market. ⚡ In deploying renewable energy projects, we prioritise safety and efficiency above all else. A big thank you to our partners, Powerlink Queensland and Infravision, for their crucial role in bringing this vision to life! 🙌🤝 #RenewableEnergy #Innovation #Sustainability #NetZero #HydroPower #DroneTechnology #EnergyIndustry #IndustryBenchmark #Goals

    View organization page for Infravision, graphic

    5,433 followers

    Want to see how Infravision does business in the field? We are proud to publicly share our latest project case study in partnership with Powerlink Queensland on the Genex Power Kidston transmission project, where we safely and successfully delivered draw line installation at an industrial scale with drones. Infravision's technology, services, and construction methods enabled Powerlink to unlock significant benefits including increased construction schedule flexibility and compression, the ability to operate during multiple cyclone events and adverse weather conditions, reduced impact to the local community and environment, and a notable reduction in safety risk exposure to workers. Check out the video case study or get in contact with Matt Jones to learn more! #Infravision #Powerlink #QueenslandEnergy #Innovation #DroneTechnology #RenewableEnergy #Sustainability #EnergyFuture Department of Energy and Climate | Trade and Investment Queensland | Australian Department of Foreign Affairs and Trade

  • View organization page for Genex Power, graphic

    9,169 followers

    We've reached a pivotal milestone in developing what is set to be Australia's largest solar farm connected to the energy grid 🌞— the Stage One Bulli Creek Solar Project (BCS-1) within the Bulli Creek Clean Energy Park (BCCEP)⚡ We're collaborating with our preferred EPC contractor, PCL Construction 🏗️, on various work packages and procurement workstreams for this mega project and are thrilled to be delivering all the details on the 25th of July at the 'Connecting Industry Update'📅, where Landon Douglas (PLC’s Operations Lead - Project Management), will be spearheading the discussion on the exciting supply chain opportunities🔗 Key Takeaways 🚀 🔹 Introduction to PCL Construction, their core services, and an overview of project pipeline activities 🔹 Organisational background of Genex Power and co-developer J-POWER 🔹 Key focus into the Bulli Creek Solar Project: facts, scope, timeline, highlights, and upcoming activities 🔹 Available work packages and procurement opportunities and associated release dates  🔹 Proposed facilities, amenities, and job opportunities at the 800-ensuite room Workers Camp which will be constructed at the energy park to accommodate our contractors, subcontractors, and employees This is the first, and the biggest online platform (with targeted 200+ audiences from the resource and construction sector Australia-wide and internationally tuning in) where we be delivering the first stage of works for BCS-1 starting this month! REGISTER NOW to be part of building Australia’s largest solar farm and contributing to sustainable developments for a clean energy future in Australia! 🌏 https://lnkd.in/gJeMjjwr Kieran Moran - Connecting Industry. #registernow #industryupdate #procurement #workopportunities 

    • No alternative text description for this image
  • View organization page for Genex Power, graphic

    9,169 followers

    As a leading renewable energy and storage developer, we are deeply committed to our role as a socially responsible organisation. 🌿 We prioritise implementing best practices that safeguard the environment and fostering positive, enduring relationships with the communities impacted by our projects. Our commitment to social responsibility is evident throughout every phase of our projects. We engage proactively with all stakeholders, including landowners, residents, councils, and government agencies, ensuring they are informed and updated. We provide an open and dynamic communication platform where questions are addressed, and collaborative opportunities are explored. 🔎🤝 One of our most exciting ventures yet is the Bulli Creek Energy Park (Energy Park), a large-scale, multi-stage solar PV and Battery Energy Storage System (BESS) development located 45km southwest of Millmerran, Queensland. Co-developed by Genex Power and J-POWER, this project is set to encompass Australia’s largest grid-connected solar farm once in operation, while simultaneously bringing significant benefits and opportunities to the community. 🌞 The first stage of the Energy Park, Stage 1 Bulli Creek Solar, is on track to commence construction in early 2025. The upcoming 'Community Information Session' marks the first of many opportunities for stakeholders to meet the team behind the Stage 1 Bulli Creek Solar project and its associated workers camp, which is set to accommodate up to 800 workers across the development of the Energy Park. The Community Session will be held at the Mill Inn Tavern in Millmerran on 30 May 2024 at 6pm. 📅 Click on the link below to find out more about the Community Session and gain other key takeaways including: 🔸 An overview of the Bulli Creek Energy Park 🔸 Project location and timeline 🔸 Key infrastructure details 🔸 Industry trends and statistics 🔸 Employment and procurement opportunities with PCL Construction, our principal contractor 🔸 Details about the worker's camp and more See our digital flyer below for all the details!📖 We look forward to continuing our work with the #community and #stakeholders to ensure the #success and #sustainability of our landmark project. Stay tuned for regular updates as we progress – we’re committed to keeping you informed every step of the way! 🌱📢✨

  • Genex Power reposted this

    View organization page for Genex Power, graphic

    9,169 followers

    🚀 Join us at Australia's standalone storage event on May 21-22 where our CEO, Craig Francis, alongside other industry leaders, take a deep dive into key themes - all things #batteries and #storage!🔋 With 19 #BESS projects launched last year alone, totaling 2GW, we're proud to be part of this number via our Bouldercombe Battery Project commencing operation and ramping up to its full capacity of 50MW/100MWh since December 2023. Our first large-scale storage infrastructure has provided critical support to the #Queensland grid over the recent summer period whereby all-time peak demand and significant volatility were experienced, driven by extreme weather conditions.🌞 Key themes of discussions include the nation’s renewable energy transition, storage and its impact on the #NEM, technology and #innovation solutions, #investment and #revenue considerations, and case studies from across the country. 🔎 🔔Craig Francis is a panel speaker on ‘Barriers to Market for Energy Storage Projects’, commencing at 11:30 am – 12:20 pm (AEST) on Day One, the 21st of May. Don't miss out on this opportunity to meet all the most important investors, developers, IPPs, grid operators, policymakers, utilities, energy buyers, service providers, consultancies, and technology providers under one roof and be part of the energy storage revolution! 💪 Secure your ticket: https://lnkd.in/eZwe5MtE #AustraliaStorageEvent #RenewableEnergy #EnergyStorage #storagesummit 

  • View organization page for Genex Power, graphic

    9,169 followers

    🚀Proudly sharing the latest results from our renewable energy and storage portfolio of >$1.1 billion! 🏭 Our CEO, Craig Francis, and CFO, Patrick McCarthy, were pleased to deliver our Q3 FY24 results, which saw numerous milestones achieved and exciting progress taking place across our development and construction pipeline, finance, and corporate areas of the organisation. Notably, a key achievement this past quarter was our standalone #BESS, the 50MW/100MWh Bouldercombe Battery Project, which emerged as a revenue powerhouse, outperforming our solar projects, all in its first full quarter of operations, all the while critically bolstering much-needed grid resilience for the state of #Queensland. Whether you're a seasoned stakeholder or new to #Genex, this webinar offers a comprehensive 101 overview of our operations as we continue our strategy to play a leading role in the energy transition in Australia. 🏗️📈 Stay for the Q&A towards the end! The full presentation is now available on our YouTube channel: https://lnkd.in/gHvTCfyn Join Genex in shaping a sustainable future💡 #RenewableEnergy #NetZero #Sustainability

    GNX Q3 FY24 Results Webinar final

    https://www.youtube.com/

  • View organization page for Genex Power, graphic

    9,169 followers

    🚀 Join us at Australia's standalone storage event on May 21-22 where our CEO, Craig Francis, alongside other industry leaders, take a deep dive into key themes - all things #batteries and #storage!🔋 With 19 #BESS projects launched last year alone, totaling 2GW, we're proud to be part of this number via our Bouldercombe Battery Project commencing operation and ramping up to its full capacity of 50MW/100MWh since December 2023. Our first large-scale storage infrastructure has provided critical support to the #Queensland grid over the recent summer period whereby all-time peak demand and significant volatility were experienced, driven by extreme weather conditions.🌞 Key themes of discussions include the nation’s renewable energy transition, storage and its impact on the #NEM, technology and #innovation solutions, #investment and #revenue considerations, and case studies from across the country. 🔎 🔔Craig Francis is a panel speaker on ‘Barriers to Market for Energy Storage Projects’, commencing at 11:30 am – 12:20 pm (AEST) on Day One, the 21st of May. Don't miss out on this opportunity to meet all the most important investors, developers, IPPs, grid operators, policymakers, utilities, energy buyers, service providers, consultancies, and technology providers under one roof and be part of the energy storage revolution! 💪 Secure your ticket: https://lnkd.in/eZwe5MtE #AustraliaStorageEvent #RenewableEnergy #EnergyStorage #storagesummit 

  • View organization page for Genex Power, graphic

    9,169 followers

    📣REGISTRATION IS NOW OPEN: #Genex Quarterly Results Webinar We are pleased to invite you to an exclusive virtual briefing on our quarterly results for the quarter ending 31 March 2024. Join us on Monday, 29th of April 2024, at 11:00 am (AEST) as our Chief Executive Officer, Craig Francis, and Chief Financial Officer, Patrick McCarthy, lead an in-depth discussion on the highlights and results from the past quarter as well as exciting insights on Genex’s project pipeline and exciting plans and prospects!🎯 This is your opportunity to gain valuable insights and participate in a Q&A session with our senior management. Click the link to register: https://lnkd.in/g-euurAG

    One platform to connect | Zoom

    One platform to connect | Zoom

    us06web.zoom.us

Similar pages

Browse jobs

Funding

Genex Power 9 total rounds

Last Round

Post IPO debt

US$ 25.1M

Investors

Infradebt
See more info on crunchbase