Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.
PART 7 Miscellaneous and general
3.(1) The total number of offshore electrical platforms forming part...
4.(1) The total length of the inter-array cables comprised within...
5.(1) In relation to a wind turbine generator, each gravity...
6.(1) In relation to a meteorological mast, each gravity base...
7.(1) In relation to each offshore electrical platform, the gravity...
8.(1) In relation to a construction, operation and maintenance platform,...
9.The total amount of scour protection for the wind turbine...
13.Landfall construction method statement and monitoring plan
25.Control of artificial light emissions during operational phase
38.Restriction on carrying out grid connection works where consented in another order
2.(1) Without prejudice to the generality of paragraph 1, the...
3.(1) Without limitation on the scope of paragraph 1, the...
6.The following provisions of the 1965 Act (which state the...
9.Section 22 of the 1965 Act (interests omitted from purchase)...
10.For Schedule 2A to the 1965 Act substitute— SCHEDULE 2A...
PART 1 Protection for electricity, gas, water and sewerage undertakers
PART 2 Protection for operators of electronic communications code networks
PART 3 Protection for Anglian Water Services Limited
1.For the protection of Anglian Water, the following provisions of...
2.In this part of this schedule— “alternative apparatus” means alternative...
4.The undertaker must not interfere with, build over or near...
5.The alteration, extension, removal or re-location of any apparatus may...
6.In the situation, where in exercise of the powers conferred...
7.Regardless of any provision in this Order or anything shown...
9.If in consequence of the exercise of the powers conferred...
10.If in consequence of the exercise of the powers conferred...
11.If for any reason or in consequence of the construction...
12.Nothing in paragraph 11 above imposes any liability on the...
13.Anglian Water must give the undertaker reasonable notice of any...
14.Anglian Water must use its reasonable endeavours to mitigate in...
15.Any difference or dispute arising between the undertaker and Anglian...
PART 4 Protection for National Grid as electricity undertaker
PART 6 Protection for East Anglia ONE Offshore Wind Farm and East Anglia THREE Offshore Wind Farm
Deemed licence under the 2009 Act - generation assets
PART 1 Licensed marine activities
3.(1) Such activities are authorised in relation to the construction,...
4.The substances or articles authorised for deposit at sea are—...
5.The grid coordinates for the authorised scheme are specified below—...
6.This licence remains in force until the authorised scheme has...
8.With respect to any condition which requires the licensed activities...
2.(1) The total number of meteorological masts forming part of...
3.(1) The total number of construction, operation and maintenance platforms...
4.(1) The total number of offshore electrical platforms forming part...
6.(1) In relation to a wind turbine generator, each gravity...
7.(1) In relation to a meteorological mast, each gravity base...
8.(1) In relation to any construction, operation and maintenance platform,...
9.(1) In relation to each offshore electrical platform, the gravity...
12.(1) The undertaker must colour all structures yellow (colour code...
18.(1) Any archaeological reports produced in accordance with condition 17(1)(g)(iii)...
23.Reporting of impact pile driving/detonation of explosives
26.Southern North Sea Special Area of Conservation Site Integrity Plan (Piling)
27.Southern North Sea Special Area of Conservation Site Integrity Plan (UXO clearance)
Deemed licence under the 2009 Act – offshore transmission assets
PART 1 Licensed marine activities
3.(1) Such activities are authorised in relation to the construction,...
4.The substances or articles authorised for deposit at sea are—...
5.The grid coordinates for the authorised scheme are specified below—...
6.This licence remains in force until the authorised scheme has...
8.With respect to any condition which requires the licensed activities...
2.(1) The total number of offshore electrical platforms forming part...
4.(1) In relation to any construction, operation and maintenance platform,...
5.(1) In relation to each offshore electrical platform, the gravity...
8.(1) The undertaker must colour all structures yellow (colour code...
14.(1) Any archaeological reports produced in accordance with condition 13(1)(g)(iii)...
19.Reporting of impact pile driving/detonation of explosives
22.Southern North Sea Special Area of Conservation Site Integrity Plan (Piling)
23.Southern North Sea Special Area of Conservation Site Integrity Plan (UXO clearance)
Offshore Ornithology Compensation Measures
PART 1 Flamborough and Filey Coast Special Protection Area: Kittiwake Compensation Measures
1.In this Part— “the kittiwake compensation plan” means Appendix 1...
2.The authorised development may not be commenced until a plan...
3.Following consultation with the KCSG, the KIMP must be submitted...
4.The undertaker must not commence the authorised development unless it...
5.The undertaker must implement the measures as set out in...
6.The undertaker shall notify the Secretary of State of completion...
7.Results from the monitoring scheme must be submitted at least...
8.The artificial nest structure must not be decommissioned without written...
9.The KIMP approved under this Schedule includes any amendments that...
10.In the event of any conflict or inconsistency between the...
PART 2 Alde-Ore Estuary Special Protection Area: Lesser black-backed gull Compensation Measures
1.In this Part— “the lesser black-backed gull compensation plan” means...
2.The authorised development may not be commenced until a plan...
3.Following consultation with the LBBCSG, the LBBIMP must be submitted...
4.The undertaker must not commence the authorised development unless it...
5.The undertaker must implement the measures as set out in...
6.The undertaker shall notify the Secretary of State of completion...
7.Results from the monitoring scheme must be submitted at least...
8.Any predator proof fencing installed must not be decommissioned without...
9.The LBBIMP approved under this Schedule includes any amendments that...
10.In the event of any conflict or inconsistency between the...
PART 3 Outer Thames Estuary Special Protection Area: Red-throated diver Compensation Measures
1.In this Part— “the red-throated diver compensation plan” means Appendix...
2.The authorised development may not be commenced until a plan...
3.Following consultation with the RTDCSG, the RTDIMP must be submitted...
4.The undertaker must not commence the authorised development unless it...
5.The undertaker must implement the measures as set out in...
6.The undertaker shall notify the Secretary of State of completion...
7.Results from the monitoring scheme and aerial digital surveys must...
8.The RTDIMP approved under this Schedule includes any amendments that...
9.In the event of any conflict or inconsistency between the...
The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Whole Instrument you have selected contains over 200 provisions and might take some time to download.
Would you like to continue?
The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: