The Criterion Wind Project is a wind farm located on Backbone Mountain east of Oakland, Maryland, United States. The project has a rated capacity of 70 MW and uses 28 Liberty Wind Turbines manufactured by Clipper Windpower. Each of the wind turbines is about 415 feet tall. The Criterion Wind Project is owned by Criterion Power Partners, LLC, which is a subisiary of Exelon, and interconnected with the transmission system of the Potomac Edison Company (a subsidiary of FirstEnergy). Electricity and renewable energy credits from the project are sold to the Old Dominion Electric Cooperative under a 20 year supply contract.[1]
History
The Criterion Wind Project was originally proposed in 2002 by Clipper Windpower as a 101 MW project consisting of 67 1.8 MW. On March 26, 2003, the Maryland Public Service Commission issued a certificate of public convenience and necessity authorizing the construction of the wind farm. Opponents of the project filed a series of lawsuits which delayed construction of the project.[2] In 2007, legislation was enacted by the Maryland General Assembly to streamline the permitting of wind farms with a capacity up to 70 MW. To meet the new statutory requirements, the Criterion Wind Project was then reconfigured as a 70 MW project consisting of 28 2.5 MW wind turbines. Clipper Windpower then sold the project to Constellation Energy,[1] which completed the project in December 2010.
Concerns regarding birds and bats
A lawsuit was filed in December 2010 against the Criterion Wind Project alleging that the project must obtain an Incidental Take Permit from the U.S. Fish and Wildlife Service for any Indiana bats killed or injured by the turbine blades.[3] A pre-construction survey conducted over two years did not find any endangered bats such as the Indiana bat at the project site.[4]
On July 31, 2012, the U.S. Fish and Wildlife Service released a draft Habitat Conservation Plan[5] developed for the Criterion Wind Project with proposed measures to protect the Indiana bat for public comments through September 28, 2012.[6] After the comment period ends, the Service will determine if the application meets the permit issuance requirements.
See also
References
- ^ a b "Constellation Energy Completes Acquisition of Criterion Wind Project in Western Maryland" (Press release). Constellation Energy. 07-04-2010. Retrieved 11 May 2011.
{{cite press release}}
: Check date values in:|date=
(help) - ^ See Clipper WindPower v. Sprenger, 924 A.2d 1160 (Md. 2007). and Sprenger v. Public Service Commission, 926 A.2d 238 (Md. 2007)..
- ^ Wheeler, Timothy B. (Dec 22, 2010). "Maryland wind project sued over endangered bats". The Baltimore Sun. Retrieved 11 Apr 2011.
- ^ Gates, J. Edward (June 2006). "Bird and Bat Species and Risks to Diurnal Migrants on the Clipper Windpower Criterion Project, Backbone Mountain, Garrett County, Maryland" (PDF): 113, 118. Retrieved 11 May 2011.
{{cite journal}}
: Cite journal requires|journal=
(help); Unknown parameter|coauthors=
ignored (|author=
suggested) (help) - ^ Criterion Power Partners, LLC (Nov 29, 2011). "Criterion Wind Project, Garrett County, Maryland: Indiana Bat Habitat Conservation Plan" (PDF). U.S. Fish and Wildlife Service. Retrieved 2 Aug 2012.
- ^ "Maryland energy company requests Endangered Species Act permit from U.S. Fish and Wildlife Service" (Press release). U.S. Fish and Wildlife Service. July 31, 2012. Retrieved 2 Aug 2012.