Jump to content

Pobeda Solar Park

Coordinates: 43°31′16″N 24°32′30″E / 43.5211°N 24.5417°E / 43.5211; 24.5417
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Imac2Mac (talk | contribs) at 07:00, 19 February 2013. The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Pobeda Solar Park
Map
CountryBulgaria
Coordinates43°31′16″N 24°32′30″E / 43.5211°N 24.5417°E / 43.5211; 24.5417
StatusOperational
Commission date2012
Owner(s)Hareon Solar
Operator(s)ABB
Solar farm
Type

Pobeda Solar Park is a 50.6 MW photovoltaic (PV) plant in Pobeda, in the Pleven Province of Northern Bulgaria. The power plant is monitored from a control center in Sofia, along with three other photovoltaic power plants totaling 85 MW, expected to produce a combined total of 95 GWh/year.[1][2][3]

 This projects was funded through the E.U and is one more step that Bulgaria is making to modernize and join their fellow E.U. contries with efforts to expand clean energy. 

On July 2, 2012 the control module and transformer were damaged by a rocket-propelled grenade, shortly before the power plant was connected to the grid.[4]

See also

References