Jump to content

Corby railway station

Coordinates: 52°29′20″N 0°41′17″W / 52.489°N 0.688°W / 52.489; -0.688
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by 2a00:23c7:ed6a:dc01:719c:5fe0:c25c:3d0 (talk) at 17:17, 25 September 2023 (Services). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Corby
National Rail
General information
LocationCorby, North Northamptonshire
England
Coordinates52°29′20″N 0°41′17″W / 52.489°N 0.688°W / 52.489; -0.688
Grid referenceSP891886
Managed byEast Midlands Railway
Platforms1
Other information
Station codeCOR
ClassificationDfT category E
Key dates
1879Opened
18 April 1966[1]Closed
13 April 1987Reopened
2 June 1990Closed
23 February 2009Reopened
Passengers
2017/18Increase 0.297 million
2018/19Increase 0.302 million
2019/20Steady 0.302 million
2020/21Decrease 65,878
 Interchange  227
2021/22Increase 0.300 million
 Interchange Increase 811
Notes
Passenger statistics from the Office of Rail and Road

Corby railway station, owned by Network Rail and managed by East Midlands Railway, is in Corby, Northamptonshire, England. The current station, opened on 23 February 2009, replaces an earlier one dating from 1879, first closed on 18 April 1966[1] but reopened between 1987 and 1990.

Plans for the current station, opposite the original, were approved in late 2007. It opened with just one daily train each way on Mondays to Fridays. The full current service of hourly trains to and from London began on 27 April 2009, after East Midlands Trains had taken delivery of the additional trains needed for its implementation.

History

The briefly used 1987 station, seen here in 1990 shortly before closure.

The Midland Railway opened Corby station in 1879.[2] It was on the Nottingham direct line of the Midland Railway between Kettering and Nottingham, serving Corby, Oakham and Melton Mowbray, instead of Market Harborough, Leicester and Loughborough. The station was initially named "Weldon and Corby" to avoid confusion with Corby Glen station in Lincolnshire, which closed in 1959.[2] British Railways (BR) withdrew passenger services from all stations on the Oakham to Kettering Line, including Corby, in May 1967.[3] For some decades, Corby was one of the largest towns in Europe without a railway station[4] (claimed as the largest in an episode of Series C of BBC TV show QI in 2005).

BR kept the Oakham to Kettering line through Corby open for freight and as a diversionary route. It reduced the southern end of the line, from Glendon Junction (near Kettering) to Corby, to single track in 1986 after the closure of the town's steel works saw freight traffic levels decline. On 13 April 1987, a passenger service of 11 shuttle trains daily between Corby and Kettering, usually operated by a single DMU, was reintroduced with local council subsidy.[2] More than 100,000 people used the service within the first 12 months and an extension to Leicester was proposed. However, the service became unreliable and the council withdrew its subsidy, leading Network Southeast to withdraw the service on 2 June 1990.[2]

Reopening

Proposals

The East Midlands Branch of the independent campaign group Railfuture proposed that the Kettering – Corby line should be included in a cross-country SwindonPeterborough service,[5] but this was not implemented. In 2001, Midland Mainline, the rail operator of the Midland Main Line franchise, decided against building a new station for Corby. In 2003, Corby's urban regeneration company, Catalyst Corby, announced plans to build a new station by 2011.[6]

In June 2006, the Department for Transport (DfT) told prospective bidders for the new East Midlands rail franchise (combining Midland Main Line services from London St Pancras and the eastern section of the Central Trains network) that they would have to include in their tenders a price for a service to a new station in Corby. The DfT's East Midlands rail franchise consultation noted that Corby had been targeted for substantial housing growth over the course of the franchise and the provision of a station would be in line with the Sustainable Communities Plan. A new service could be created as an extension of the hourly London to Kettering service.[7]

Announcements

The new station at Corby, looking south. The platform of the 1987 station can be seen on the right.

In April 2007, Network Rail announced that it had allocated £1.2-million towards the rebuilding of the station as a response to housing and jobs growth in the county. A final decision on the station, planned to be open by December 2008, would be made by the Department for Transport.[8] On 22 June, the DfT confirmed that Stagecoach had won the franchise and revealed that the company – operating as East Midlands Trains (EMT) – would run an extra hourly London to Kettering service, with the possibility of extending this to a new station in Corby[9] and putting Corby within 75 minutes of central London.[10]

An article in the June 2008 edition of Modern Railways,[11] produced in cooperation with EMT, suggested that, from December 2008, Corby could be served by trains leaving St Pancras for Kettering at 8 minutes past each hour. However, pending the removal of infrastructure constraints – notably, the need to reinstate a third track between Wellingborough and Kettering and raise the line speed between Corby and Kettering – an hourly through-service to and from Corby would have been unfeasible initially, trains being unable to make the run from Kettering to Corby and back within the projected timings. Therefore, with the possible exception of some peak-time services, the connection to and from Corby would have to be provided mostly by a shuttle service, with a change of trains at Kettering. For this, EMT would need to lease additional rolling stock, speculated to be Class 222 stock cascaded from Hull Trains.[12][13] In addition, DfT approval of the hourly Kettering service was still awaited.

Services had been due to start on 14 December 2008,[14] but EMT admitted that it had yet to secure agreement with the DfT and the rolling stock company (ROSCO) for the four additional trains needed. EMT then announced that services would not commence until 20 March 2009.[15]

The station's opening was then brought forward to 23 February 2009,[16] but with a very limited interim timetable of one train to London and back each day.[17] EMT promised that more services would begin once an additional three trains had become available.[18][failed verification] On 7 April 2009, East Midlands Trains announced that the full hourly service (13 trains each way) would begin from Monday 27 April 2009.[18][failed verification]

Transport secretary Geoff Hoon presided over the official opening of the station on 30 April 2009, with hourly passenger trains to London and a limited northbound service.[19]

Design and construction

Site clearance works in March 2008. The platform from the old station can just be seen at the right of the picture, below some 'British Rail lights', from the period when the station was briefly open in the 1980s.

The North Northants Development Company and English Partnerships submitted plans for the design of the station in late July 2007 and detailed planning permission was granted by the Council in November. The Development Company predicted that the new station would unlock an estimated £200-million of further commercial investment in Corby, creating more than 1,200 jobs. It added that the station would also provide added impetus for residential development and aid the transformation of town centre shopping and civic facilities.[20]

The project cost £8.3 million, and construction began in June 2008, following the conclusion of an agreement with Kettering construction firm Mainline Contractors.[21] The station was built at Station Road, adjacent to the site of the old station, to act as a transport interchange for Corby, with bus and taxi facilities being relocated there.[22] A new road was planned to lead into the interchange, which would also have a 140-space car park, taxi rank, drop-off and pick-up areas and a bus area.[23][24] Site clearance works began in March 2008 and were completed in the summer.

The station is the third to be built to the modular station design developed by Network Rail, following Mitcham Eastfields and Greenhithe.[25] There has been criticism of the design by the Commission for Architecture and the Built Environment that:

[t]here is no evidence of strong design thinking and little indication to suggest the concept has been considered as an integrated whole. This can be read in the awkward junction between the station building and the canopy and poor siting of the railings and street furniture in relation to the station structure. There is also a lack of finesse to the elevations, as illustrated by the mismatch between doors and panels. Taken together, these shortcomings lend the station an ungainly and impoverished form.

An artist's impression of the station was on the website of the local MP, Phil Hope.[27] In June 2009, it was announced that the station had won the Chartered Institution of Highways and Transportation's Award for Effective Partnerships and received praise for having been built on time, within budget and to a high standard.[21]

Future

Redoubled line and electrification since 2021. The platform of the 1987 station can be seen on the right.

It was planned that a half-hourly London St Pancras International to Nottingham via Corby service would be operated by East Midlands Railway from May 2021[28] using Class 360 electric trains, once the Midland Main Line has been electrified beyond Bedford as part of the Electric Spine project.[29] However large portions of the spine project were cancelled.[30] Network Rail did complete the re-doubling of the singled Glendon Junction to Corby section as part of the overall upgrade scheme in March 2018.[31] Electric services were duly introduced in May 2021.[32] Although the spine project has been cancelled, the Midland Main Line railway upgrade is in progress with the electrification and modernisation of the section from Kettering to Market Harborough ongoing from December 2021.[33][34][35] In addition, the Integrated Rail Plan for the North and Midlands published by the DfT on 18 November 2021 shows the entire line to Sheffield will now proceed.[36] Meanwhile, the planning of building 150 new flats to the south of the station was approved by Corby council in May 2018.[37][38][39]

East-West Rail – Northern Route

The Kettering – Manton line via Corby was also considered for reopening to passengers as part of the East West Rail between Oxford, Cambridge and Norwich.[citation needed] Three routes were considered, with Corby on the northern route. A new chord would have been needed at Manton for direct running between Corby and Stamford. Despite being the cheapest of the three options, the northern route has been ruled out as being too indirect.[citation needed]

Electrification and associated works

In July 2009, the Labour government published a document and said it was looking at electrification of the Midland Main Line but no funds had been committed.[40] When originally planned and announced, the line upgrade was costed at £1.6 billion and it was expected that the line would be electrified as far as Kettering and Corby by 2017. The 2012 announcement by the Conservative led coalition government was that electrification of the railway line between Bedford, Wellingborough, Corby, Leicester, Derby, Nottingham and Sheffield would go ahead. This was part of the High Level Output Specification for Control Period 5.[41] This was also part of a rolling programme of railway electrification projects. An extra track was to be installed between Kettering and Corby.[42] It appeared in the autumn statement of 2011.[43]

2012 Department for Transport plans for UK rail electrification by 2019 including Northern Hub (red), Electric Spine (yellow/green), Great Western Main Line and South Wales Main Line (red) and Valleys & Cardiff Local Routes (blue). For 'HLOS', see Network Rail > Control periods.

A 2014 RAIL Magazine article gave a detailed account of the work ahead. The whole Midland Main Line scheme also overlapped with the Electric Spine project.[44] In June 2015, Patrick McLoughlin paused the electrification project[45] but on 30 September 2015 the scheme was restarted.[46] The completion dates were now three years later than originally planned, with electrification to Kettering and Corby now targeted for completion in 2019.[47] The line from Kettering to Corby was to be doubled, and Network Rail started work in June 2015.[48] The Enhancements plan update of January 2016 showed the project on target.[49] In January 2021 electrification of the Midland Main Line to Corby was completed.[50] The electrified line is being fed via the autotransformer system. A new grid feeder will be needed at Braybrooke, just south of Market Harborough.[51] Work was announced as starting on the grid feeder in the Market Harborough area on 8 April 2021.[52] The transformers were delivered to site in December 2021.[53]

Services

With the introduction of the EMR Connect Service in May 2021, Corby now has two electric trains per hour to London.[54] EMR operates two intercity trains each way per day from Melton Mowbray and Oakham to London St. Pancras International, one of which terminates at Kettering.[55][56]

In 2023, Luton Airport Express became an official separate brand for the "Connect" service.[57]

Preceding station National Rail National Rail Following station
Kettering   Luton Airport Express
Oakham to Kettering Line
  Terminus
  East Midlands Railway
Oakham to Kettering LineLimited service
  Oakham
Geddington
Line open, station closed
  Midland Railway
Nottingham direct line of the Midland Railway
  Gretton
Line open, station closed

References

  1. ^ a b Butt, R.V.J. (1995). The Directory of Railway Stations. Yeovil: Patrick Stephens Ltd. p. 68. ISBN 1-85260-508-1. R508.
  2. ^ a b c d "Steaming ahead to transform a village". Northamptonshire Evening Telegraph. 16 August 2007. Archived from the original on 16 March 2008. Retrieved 23 February 2009.
  3. ^ Daniels, Gerald David; Dench, Leslie Alan (May 1973) [1964]. Passengers No More (2nd ed.). Shepperton: Ian Allan. p. 65. ISBN 0-7110-0438-2. OCLC 2554248. 1513 CEC 573.
  4. ^ "Back on Track". The Independent. 30 January 2008. p. 4.
  5. ^ Kay, Anthony. "East Midlands". Railwatch. Railfuture. Archived from the original on 17 July 2011.
  6. ^ "New train station 'possible'". BBC News. 20 June 2003. Archived from the original on 28 January 2022. Retrieved 12 July 2006.
  7. ^ "Franchise puts town back on track". Regeneration & Renewal. 16 June 2006. p. 22.[clarification needed]
  8. ^ "Railway station plan gets boost". BBC News. 3 April 2007. Archived from the original on 29 November 2008. Retrieved 8 May 2007.
  9. ^ "Stagecoach wins East Midlands rail franchise". Birmingham Post. 23 June 2007. p. 2.
  10. ^ "Stagecoach wins railway franchise". BBC News. 20 June 2007. Archived from the original on 17 August 2007. Retrieved 24 June 2007.
  11. ^ "(title omitted)". Modern Railways (717). Ian Allan Publishing: 71–74. June 2008.
  12. ^ "East Midlands Trains Interview" (PDF).[permanent dead link]
  13. ^ "(title omitted)". Modern Railways (772). Ian Allan Publishing: not cited. November 2008.
  14. ^ "PDF timetables". East Midlands Trains. 25 November 2008. Archived from the original on 4 November 2008.
  15. ^ "Corby train delays labelled 'shambolic'". Northamptonshire Evening Telegraph. 25 November 2008. Archived from the original on 10 September 2012.
  16. ^ "Train service will leave from Corby this month". Northamptonshire Evening Telegraph. 9 February 2009. Archived from the original on 5 September 2012.
  17. ^ "Direct train service gets going". BBC News. BBC. 23 February 2009. Archived from the original on 26 February 2009. Retrieved 23 February 2009.
  18. ^ a b "East Midlands Trains announces start date for full services from Corby". East Midlands Trains. 7 April 2009. Retrieved 1 September 2013.
  19. ^ "New Corby railway station opened by transport secretary". The Career Engineer. 30 April 2009. Archived from the original on 21 July 2011. Retrieved 1 September 2013.
  20. ^ Regeneration & Renewal, "Green Light for Corby train station after 17 years", 29 June 2007, p. 2.
  21. ^ a b "Award for railway station project". BBC News. 30 June 2009. Archived from the original on 28 January 2022. Retrieved 9 November 2011.
  22. ^ ING Media, "Green light for new train station signals major boost for on-going renaissance of Corby", 22 June 2007.[permanent dead link]
  23. ^ "Railway station plans submitted". BBC News. 4 August 2007. Archived from the original on 28 January 2022. Retrieved 4 August 2007.
  24. ^ "Date set for work on Corby rail station". Northamptonshire Evening Telegraph. 22 February 2008. Retrieved 9 November 2011.
  25. ^ "Modular station opens this month". Railway Gazette International. 1 May 2008. Archived from the original on 15 April 2012. Retrieved 9 November 2011.
  26. ^ "Corby Rail Station – Design review – CABE". Commission for Architecture and the Built Environment. 23 September 2007. Archived from the original on 18 January 2011. Retrieved 9 November 2011.
  27. ^ "Corby Station - artist's impressions". Phil Hope. August 2007. Archived from the original on 8 September 2008. Retrieved 1 September 2013.
  28. ^ "Big changes to Kettering, Wellingborough and Corby train services delayed until next year | Northamptonshire Telegraph". 6 July 2020. Archived from the original on 7 July 2020. Retrieved 29 July 2020.
  29. ^ Broadbent, Steve (19 February 2014). "Switching on the Electric Spine". RAIL. No. 742. pp. 69–75.
  30. ^ "Rail electrification plans scrapped by government". BBC News. 20 July 2017. Archived from the original on 1 April 2019. Retrieved 22 July 2017.
  31. ^ "Commission accomplished! Extra rail line between Kettering and Corby enters into use" Archived 25 December 2018 at the Wayback Machine NetworkRail Media Center article 09-03-2018; Retrieved 24-12-2018
  32. ^ Duggan, Jamie (16 May 2021). "New East Midlands Railway Connect services feature electric trains between Corby and London St Pancras". Rail Advent. Archived from the original on 17 May 2021. Retrieved 17 May 2021.
  33. ^ "Spades in ground as government delivers on rail investment promise for North and Midlands". GOV.UK. Archived from the original on 5 January 2022. Retrieved 21 December 2021.
  34. ^ "Main works on next stage of Midland Main Line electrification due to begin". RailBusinessDaily. 21 December 2021. Archived from the original on 21 December 2021. Retrieved 21 December 2021.
  35. ^ "Rail industry welcomes progress on Midland Mainline electrification". www.riagb.org.uk. Archived from the original on 21 December 2021. Retrieved 21 December 2021.
  36. ^ Department for Transport (18 November 2021). Integrated Rail Plan for the North and Midlands (PDF). ISBN 978-1-5286-2947-8. Archived (PDF) from the original on 19 November 2021. Retrieved 28 January 2022. {{cite book}}: |website= ignored (help)
  37. ^ "Controversial flats development near Corby train station approved" Archived 25 December 2018 at the Wayback Machine Northamptonshire Telegraph article 16-05-2018; Retrieved 24-12-2018
  38. ^ "Erection of 150 residential units at Land off Station Road, Corby" Archived 21 January 2022 at the Wayback Machine Corby Council Planning Permission 15-05-2018; Retrieved 24-12-2018
  39. ^ "Rail Electrification" (PDF). July 2009. Archived (PDF) from the original on 5 August 2009. Retrieved 28 January 2022.
  40. ^ "HLOS CP5" (PDF). Archived (PDF) from the original on 24 December 2021. Retrieved 28 January 2022.
  41. ^ "Work to upgrade railway between Corby and Kettering enters next phase". Network Rail Media Centre. Archived from the original on 18 January 2022. Retrieved 28 February 2021.
  42. ^ "Autumn Statement 2011" (PDF). UK Government. 2011. Archived (PDF) from the original on 1 April 2014. Retrieved 28 January 2022.
  43. ^ Broadbent, Steve (6 August 2014). "The countdown begins to MML wiring". RAIL Magazine. 765: 54–59 – via Bauer Media.
  44. ^ "All bets off for £38bn rail plan". BBC News. 25 June 2015. Archived from the original on 17 January 2022. Retrieved 28 February 2021.
  45. ^ "Network Rail to restart electrification of train lines". BBC News. 30 September 2015. Archived from the original on 19 January 2022. Retrieved 28 February 2021.
  46. ^ "Midland Main Line electrification unpaused – but delayed by years". www.railtechnologymagazine.com. Archived from the original on 17 January 2022. Retrieved 20 February 2021.
  47. ^ "Work to upgrade railway between Corby and Kettering enters next phase". Network Rail Media Centre. Archived from the original on 18 January 2022. Retrieved 22 February 2021.
  48. ^ "Wayback Machine Enhancements Delivery Update Plan Sir Peter Hendy" (PDF). 4 February 2016. Archived from the original (PDF) on 4 February 2016. Retrieved 24 February 2021.
  49. ^ "Network Rail Enhancements Delivery Plan" (PDF). p. 36. Archived from the original (PDF) on 22 December 2017. Retrieved 31 December 2017.
  50. ^ "Google Maps". Google Maps. Archived from the original on 18 January 2022. Retrieved 1 March 2021.
  51. ^ "Work Starts On Rail Electricity Substation Project". HFM. 8 April 2021. Archived from the original on 18 January 2022. Retrieved 8 April 2021.
  52. ^ "Milestone Reached In Construction Of Rail Electricity Substation". HFM. 17 December 2021. Archived from the original on 17 December 2021. Retrieved 17 December 2021.
  53. ^ Gent, Alisha (11 May 2021). "EMR Connect: All electric train service launches this week". Rail Professional. Archived from the original on 11 May 2021. Retrieved 19 May 2021.
  54. ^ "Rail service could run north of town". Northamptonshire Evening Telegraph. 21 February 2008. Archived from the original on 16 January 2009. Retrieved 24 February 2008.
  55. ^ "East Midlands Railway timetable from 12 December 2021" (PDF). East Midlands Railway. Archived (PDF) from the original on 17 November 2021. Retrieved 17 November 2021.
  56. ^ "Luton Airport Express website". 31 March 2023.