Jump to content

Pennsylvania Route 28: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
fixed ref error, minor copy edits, removed redundant phrase, condensed refs
Line 31: Line 31:
'''Pennsylvania Route 28''' ('''PA 28''') is a major [[state highway]], which runs for {{convert|98|mi|km}} from Anderson Street in [[Pittsburgh]] to [[U.S. Route 219 (Pennsylvania)|U.S. Route 219]] (US 219) in [[Brockway, Pennsylvania|Brockway]] in [[Pennsylvania]] in the United States.
'''Pennsylvania Route 28''' ('''PA 28''') is a major [[state highway]], which runs for {{convert|98|mi|km}} from Anderson Street in [[Pittsburgh]] to [[U.S. Route 219 (Pennsylvania)|U.S. Route 219]] (US 219) in [[Brockway, Pennsylvania|Brockway]] in [[Pennsylvania]] in the United States.


From Pittsburgh to [[Kittanning, Pennsylvania|Kittanning]], it is a {{convert|44.5|mi|km|adj=mid|-long}} limited access expressway that is named the '''Alexander H. Lindsay Memorial Highway''', and is also known as the '''Allegheny Valley Expressway'''. It is named after Alexander Lindsay, a lawyer who lived in South Buffalo and commuted to work in Pittsburgh: he successfully lobbied for the city to be connected to the proposed Keystone Shortway ([[I-80]]). <ref>{{cite web |title=Dream of 'nicer commute' genesis of Route 28 |url=https://archive.triblive.com/news/dream-of-nicer-commute-genesis-of-route-28/ |website=TribLive |access-date=13 October 2020}}</ref>
From Pittsburgh to [[Kittanning, Pennsylvania|Kittanning]], it is a {{convert|44.5|mi|km|adj=mid|-long}} limited access expressway that is named the '''Alexander H. Lindsay Memorial Highway''', and is also known as the '''Allegheny Valley Expressway'''. It is named after Alexander Lindsay, a lawyer who lived in South Buffalo and commuted to work in Pittsburgh; he successfully lobbied for the city to be connected to the proposed Keystone Shortway ([[I-80]]).<ref name="dream1">{{cite web |title=Dream of 'nicer commute' genesis of Route 28 |url=https://archive.triblive.com/news/dream-of-nicer-commute-genesis-of-route-28/ |website=TribLive |access-date=13 October 2020}}</ref>


==Route description==
==Route description==
{{More citations needed section|date=October 2022}}
{{More citations needed section|date=October 2022}}
[[File:PA28nRoadSign-MM3 (25587658058).jpg|thumb|right|PA 28 northbound approaching the exit for the 40th Street Bridge in Millvale]]
[[File:PA28nRoadSign-MM3 (25587658058).jpg|thumb|right|PA 28 northbound approaching the exit for the 40th Street Bridge in Millvale]]

PA 28 begins adjacent to [[Downtown Pittsburgh]] at Anderson Street near the [[Interstate 279]] (I-279)/[[I-579]] interchange and travels north/northeast along the northern bank of the [[Allegheny River]]. Until recently the route was a surface street for the first {{convert|2|mi|km|spell=in}} until the [[Washington Crossing Bridge (Pittsburgh)|40th Street Bridge]] and then an expressway from 40th Street to Kittanning. Upgrades in 2013 made it a [[limited-access highway]] throughout its {{convert|44.5|mi|km}} in the [[Pittsburgh metropolitan area]] from the route's start at I-279 to [[Rayburn Township, Pennsylvania|Rayburn Township, Armstrong County]], with Governor [[Tom Corbett]] attending the completion ceremony on November 17, 2014.<ref>{{Cite news|last=Schmitz|first=Jon|date=17 November 2014|title=After six years, Route 28 reconstruction project ends|work=Pittsburgh Post-Gazette|url=https://www.post-gazette.com/news/transportation/2014/11/17/Gov-Corbett-snips-ribbon-to-signal-end-of-Route-28-construction/stories/201411170146|access-date=12 July 2020}}</ref>
PA 28 begins adjacent to [[Downtown Pittsburgh]] at Anderson Street near the [[Interstate 279]] (I-279)/[[I-579]] interchange and travels north/northeast along the northern bank of the [[Allegheny River]]. Until recently the route was a surface street for the first {{convert|2|mi|km|spell=in}} until the [[Washington Crossing Bridge (Pittsburgh)|40th Street Bridge]] and then an expressway from 40th Street to Kittanning. Upgrades in 2013 made it a [[limited-access highway]] throughout its {{convert|44.5|mi|km}} in the [[Pittsburgh metropolitan area]] from the route's start at I-279 to [[Rayburn Township, Pennsylvania|Rayburn Township, Armstrong County]], with Governor [[Tom Corbett]] attending the completion ceremony on November 17, 2014.<ref>{{Cite news|last=Schmitz|first=Jon|date=17 November 2014|title=After six years, Route 28 reconstruction project ends|work=Pittsburgh Post-Gazette|url=https://www.post-gazette.com/news/transportation/2014/11/17/Gov-Corbett-snips-ribbon-to-signal-end-of-Route-28-construction/stories/201411170146|access-date=12 July 2020}}</ref>


Line 47: Line 48:


[[File:2022-06-06 16 35 31 View north along Pennsylvania State Route 28 at Dairy Road in Redbank Township, Clarion County, Pennsylvania.jpg|thumb|right|PA 28 northbound past PA 536 in Redbank Township]]
[[File:2022-06-06 16 35 31 View north along Pennsylvania State Route 28 at Dairy Road in Redbank Township, Clarion County, Pennsylvania.jpg|thumb|right|PA 28 northbound past PA 536 in Redbank Township]]

After crossing [[Redbank Creek]], PA 28/PA 66 enters [[Clarion County, Pennsylvania|Clarion County]] and [[New Bethlehem, Pennsylvania|New Bethlehem]]. In downtown New Bethlehem, PA 66 splits off from PA 28 and making the PA 28/PA 66 concurrency one of the longest concurrencies in [[Pennsylvania]]. After the split, PA 28 heads northeast as Broad Street paralleling Redbank Creek. In [[Hawthorn, Pennsylvania|Hawthorn]], PA 28 is called Brookville Street and meets the western terminus of [[Pennsylvania Route 536]]. North of PA 536, PA 28 begins to slide to the north instead of the northeast.
After crossing [[Redbank Creek]], PA 28/PA 66 enters [[Clarion County, Pennsylvania|Clarion County]] and [[New Bethlehem, Pennsylvania|New Bethlehem]]. In downtown New Bethlehem, PA 66 splits off from PA 28 and making the PA 28/PA 66 concurrency one of the longest concurrencies in [[Pennsylvania]]. After the split, PA 28 heads northeast as Broad Street paralleling Redbank Creek. In [[Hawthorn, Pennsylvania|Hawthorn]], PA 28 is called Brookville Street and meets the western terminus of [[Pennsylvania Route 536]]. North of PA 536, PA 28 begins to slide to the north instead of the northeast.


Line 56: Line 58:


==History==
==History==
[[Image:Route28 tarentum.jpg|thumb|right|PA 28 southbound from exit 14 ([[Pennsylvania Route 366|PA 366]]).]]
[[Image:Route28 tarentum.jpg|thumb|right|PA 28 southbound from exit 14 ([[Pennsylvania Route 366|PA 366]])]]
In 1927, PA 28 was created, being signed on existing two laned roads from Pittsburgh to [[Kittanning, Pennsylvania|Kittanning]].<ref>{{cite web |title=Dream of 'nicer commute' genesis of Route 28 |url=https://archive.triblive.com/news/dream-of-nicer-commute-genesis-of-route-28/ |website=TribLive |access-date=13 October 2020}}</ref> The highway was signed to Brockway in 1928. That same year, the route was under construction from Blawnox to Cheswick, Troy Hill Road to Oakland, and Hazen to Reitz Crossing Road. Those sections were completed in 1929, at which point the section from Avella to Woodrow and from Hickory to Fort Cherry Road began construction.<ref name=":0">{{cite web | url=https://pittsburgh.pahighways.com/expressways/avexpressway.html | title=Pittsburgh Highways: Allegheny Valley Expressway }}</ref> In 1929, the segments from Blawnox to Cheswick, Troy Hill Road to Oakland, and Hazen to Reitz Crossing Road were completed.<ref name=":0"/> By 1930, the roadway had been paved from Skyline Road to PA 18, and the segment from Blawnox to Cheswick had been opened to traffic. The southern terminus was also extended from Avella to Independence.<ref name=":0"/>


In 1927, PA 28 was created, being signed on existing two laned roads from Pittsburgh to [[Kittanning, Pennsylvania|Kittanning]].<ref name="dream1"/> The highway was signed to Brockway in 1928. That same year, the route was under construction from Blawnox to Cheswick, Troy Hill Road to Oakland, and Hazen to Reitz Crossing Road. Those sections were completed in 1929, at which point the section from Avella to Woodrow and from Hickory to Fort Cherry Road began construction.<ref name=":0">{{cite web | url=https://pittsburgh.pahighways.com/expressways/avexpressway.html | title=Pittsburgh Highways: Allegheny Valley Expressway }}</ref> In 1929, the segments from Blawnox to Cheswick, Troy Hill Road to Oakland, and Hazen to Reitz Crossing Road were completed.<ref name=":0"/> By 1930, the roadway had been paved from Skyline Road to PA 18, and the segment from Blawnox to Cheswick had been opened to traffic. The southern terminus was also extended from Avella to Independence.<ref name=":0"/>


On July 15, 1960, the highway's southern terminus was moved from Independence to PA 8 in Etna. The former section of PA 28 from South Main Street in the West End Valley to the intersection of Noblestown Road and Crafton Boulevard in Crafton Heights was redesignated as PA 60. The remaining 83-mile stretch from Crafton Heights to Independence was renumbered PA 50. This designation change was made to reduce the number of concurrent routes in Pittsburgh. The changes took effect a few months later and signs were changed by spring 1961.<ref name=1960news>{{cite news|title=Designations Of Highways Are Changed|url=https://www.newspapers.com/clip/2990269/pa_380_created_july_16_1960/|access-date=August 28, 2015|work=The Evening Standard|date=July 16, 1960|location=[[Uniontown, Pennsylvania|Uniontown, PA]]|page=7|via=[[Newspapers.com]]}} {{open access}}</ref>
On July 15, 1960, the highway's southern terminus was moved from Independence to PA 8 in Etna. The former section of PA 28 from South Main Street in the West End Valley to the intersection of Noblestown Road and Crafton Boulevard in Crafton Heights was redesignated as PA 60. The remaining 83-mile stretch from Crafton Heights to Independence was renumbered PA 50. This designation change was made to reduce the number of concurrent routes in Pittsburgh. The changes took effect a few months later and signs were changed by the spring of 1961.<ref name=1960news>{{cite news|title=Designations Of Highways Are Changed|url=https://www.newspapers.com/clip/2990269/pa_380_created_july_16_1960/|access-date=August 28, 2015|work=The Evening Standard|date=July 16, 1960|location=[[Uniontown, Pennsylvania|Uniontown, PA]]|page=7|via=[[Newspapers.com]]}} {{open access}}</ref>


In 1965, PA 28 was realigned onto Courthouse Road to bypass the more congested parts of Kittanning.<ref name=":0"/>
In 1965, PA 28 was realigned onto Courthouse Road to bypass the more congested parts of Kittanning.<ref name=":0"/>
Line 66: Line 68:
In 1977, new emergency truck stopping lanes were constructed.<ref name="truck">https://archive.triblive.com/news/a-15-a-two-decade-wait-ends/ {{Bare URL inline|date=August 2024}}</ref>
In 1977, new emergency truck stopping lanes were constructed.<ref name="truck">https://archive.triblive.com/news/a-15-a-two-decade-wait-ends/ {{Bare URL inline|date=August 2024}}</ref>


In 1948, construction began on a new expressway bypass of the segment traveling through Millville. It was opened to traffic in 1950.<ref name=":info">{{cite web | url=https://triblive.com/local/valley-news-dispatch/remember-when-allegheny-valley-expressway-took-much-longer-to-build-than-anticipated/ | title=Remember when: Allegheny Valley Expressway took much longer to build than anticipated | date=4 May 2022 }}</ref> In 1957, construction began on another expressway bypass of Sharpsburg. This new alignment was opened to traffic on October 22, 1958.<ref name=":info"/><ref>https://historicpittsburgh.org/islandora/object/pitt:MSP285.B010.F21.I02 {{Bare URL inline|date=August 2024}}</ref> At the same time a reconstruction of the road to expressway standards from Sharpsburg to Etna was completed.<ref>{{cite web | url=https://www.pahighways.com/state/PA1-50.html#PA28 | title=Pennsylvania Highways: PA 1 - PA 50 }}</ref> In 1958 construction began on another stretch of freeway between PA 8 north to the Highland Park Bridge interchange. This opened to traffic in 1963, replacing the previous segment that ran through Etna.<ref name=":info"/> In 1964, the roadway to Blawnox was opened, also part of this project was the reconstruction of the segment from Brackenridge and Butler to expressway standards.<ref name=":0"/> That same year, the interchange with [[Interstate 80 in Pennsylvania|I-80]] was opened.<ref>{{cite web | url=https://www.pahighways.com/interstates/I80.html | title=Pennsylvania Highways: Interstate 80 }}</ref> In 1968, the segment to Fox Run Road was completed.<ref name=":info"/> In 1972, the segment from Exit 16 to Armstrong County and from Blawnox to PA 910 and from Exit 15 to US 422 was opened to traffic. Construction on this section began in 1968.<ref name=":0"/> In 1973, part of the roadway from Exit 11 to Exit 12 was opened. The route was also extended to end at US 19/PA 65 at Chateau Street via Western Avenue and East Ohio Street.<ref name=":0"/> On October 17, 1980, the expressway from Exit 12 to the north border of Tarentum was opened to traffic, it was also extended onto a new at-grade segment.<ref name="truck"/> The final stretch of the Allegheny Valley Expressway between Exit 13 and Exit 15 opened in 1985, PA 28 was subsequently removed from Freeport Road.<ref name=":0" />
In 1948, construction began on a new expressway bypass of the segment traveling through Millville. It was opened to traffic in 1950.<ref name=":info">{{cite web | url=https://triblive.com/local/valley-news-dispatch/remember-when-allegheny-valley-expressway-took-much-longer-to-build-than-anticipated/ | title=Remember when: Allegheny Valley Expressway took much longer to build than anticipated | date=4 May 2022 }}</ref> In 1957, construction began on another expressway bypass of Sharpsburg. This new alignment was opened to traffic on October 22, 1958.<ref name=":info"/><ref>https://historicpittsburgh.org/islandora/object/pitt:MSP285.B010.F21.I02 {{Bare URL inline|date=August 2024}}</ref> At the same time a reconstruction of the road to expressway standards from Sharpsburg to Etna was completed.<ref>{{cite web | url=https://www.pahighways.com/state/PA1-50.html#PA28 | title=Pennsylvania Highways: PA 1 - PA 50 }}</ref> In 1958, construction began on another stretch of freeway between PA 8 north to the Highland Park Bridge interchange. This opened to traffic in 1963, replacing the previous segment that ran through Etna.<ref name=":info"/> In 1964, the roadway to Blawnox was opened, also part of this project was the reconstruction of the segment from Brackenridge and Butler to expressway standards.<ref name=":0"/> That same year, the interchange with [[Interstate 80 in Pennsylvania|I-80]] was opened.<ref>{{cite web | url=https://www.pahighways.com/interstates/I80.html | title=Pennsylvania Highways: Interstate 80 }}</ref> In 1968, the segment to Fox Run Road was completed.<ref name=":info"/> In 1972, the segment from Exit 16 to Armstrong County and from Blawnox to PA 910 and from Exit 15 to US 422 was opened to traffic. Construction on this section began in 1968.<ref name=":0"/> In 1973, part of the roadway from Exit 11 to Exit 12 was opened. The route was also extended to end at US 19/PA 65 at Chateau Street via Western Avenue and East Ohio Street.<ref name=":0"/> On October 17, 1980, the expressway from Exit 12 to the north border of Tarentum was opened to traffic, it was also extended onto a new at-grade segment.<ref name="truck"/> The final stretch of the Allegheny Valley Expressway between Exit 13 and Exit 15 opened in 1985, PA 28 was subsequently removed from Freeport Road.<ref name=":0" />


In 1987, through traffic at the Highland Park interchange was restricted from two lanes to one lane, with deceleration lanes and emergency shoulders being added in their place. This was done to increase safety, as well better serve high demand for the bridge itself.
In 1987, through traffic at the Highland Park interchange was restricted from two lanes to one lane, with deceleration lanes and emergency shoulders being added in their place. This was done to increase safety, as well better serve high demand for the bridge itself.
Line 74: Line 76:
In 1993, PA 28’s northern terminus was relocated from the West End Bridge to the I-279 interchange, this made it so that the entire Allegheny Valley Expressway was signed as PA 28.<ref name=":0"/>
In 1993, PA 28’s northern terminus was relocated from the West End Bridge to the I-279 interchange, this made it so that the entire Allegheny Valley Expressway was signed as PA 28.<ref name=":0"/>


In the late 1980s, plans to reconstruct the roadway from Millvale to Etna were made. This came after the section saw 169 accidents from 1982 through 1987, 96 of such were injuries, with 4 causing fatalities. Construction began on September 6, 1988, and involved blasting 600,000 cubic yards of rock from the hillside that parallels the highway to reduce slides, widening the lanes to 12 feet each, adding 10-foot-wide shoulders, adding should pull-off areas such as on the eastern segment, and placing a Jersey barrier in the middle of the four foot median. The Etna interchange received new lights and signage. The $14.4 million project that required four lanes of traffic to squeeze into two finally came to an end December 7, 1990, due to rain hampering construction. Glare screen was erected on the Jersey barrier in 1991 to cut down on the effects of headlights from oncoming traffic. Due to the placement in the median instead of the outside due to the narrow right-of-way, the lights came online in 1995. Lighting standards were not installed because of financial uncertainty.<ref name=":0"/>
In the late 1980s, plans to reconstruct the roadway from Millvale to Etna were made. This came after the section saw 169 accidents from 1982 through 1987, 96 of such were injuries, with 4 causing fatalities. Construction began on September 6, 1988, and involved blasting 600,000 cubic yards of rock from the hillside that parallels the highway to reduce slides, widening the lanes to 12 feet each, adding 10-foot-wide shoulders, adding should pull-off areas such as on the eastern segment, and placing a Jersey barrier in the middle of the four foot median. The Etna interchange received new lights and signage. The $14.4 million project that required four lanes of traffic to squeeze into two finally came to an end on December 7, 1990, due to rain hampering construction. Glare screen was erected on the Jersey barrier in 1991 to cut down on the effects of headlights from oncoming traffic. Due to the placement in the median instead of the outside due to the narrow right-of-way, the lights came online in 1995. Lighting standards were not installed because of financial uncertainty.<ref name=":0"/>


On May 20, 1996, an act of the Pennsylvania legislature officially renamed the Allegheny Valley Expressway as the Alexander H. Lindsay Highway.<ref>https://www.legis.state.pa.us/WU01/LI/LI/US/PDF/1996/0/0031..PDF</ref>
On May 20, 1996, an act of the Pennsylvania legislature officially renamed the Allegheny Valley Expressway as the Alexander H. Lindsay Highway.<ref>https://www.legis.state.pa.us/WU01/LI/LI/US/PDF/1996/0/0031..PDF</ref>
Line 86: Line 88:
In 2004, an interchange was opened in Harwick to serve the [[Pittsburgh Mills]] shopping center.<ref name=":info"/>
In 2004, an interchange was opened in Harwick to serve the [[Pittsburgh Mills]] shopping center.<ref name=":info"/>


In Spring 2006, the 2.9 mile stretch of roadway south of exit 17 was rebuilt.<ref>https://archive.triblive.com/news/road-construction-on-route-28-slated-to-begin-in-spring-2006/ {{Bare URL inline|date=August 2024}}</ref>
In the spring of 2006, the 2.9 mile stretch of roadway south of exit 17 was rebuilt.<ref>https://archive.triblive.com/news/road-construction-on-route-28-slated-to-begin-in-spring-2006/ {{Bare URL inline|date=August 2024}}</ref>


In March 2007, a project to add a southbound truck climbing lane from Harmar and Harwick began. They would also repair the northbound roadway, install chain-link fencing, construct new catch basins, relocate the roadway in some areas, and reinforce concrete.<ref>{{cite web | url=https://www.post-gazette.com/local/neighborhoods/2007/10/20/Route-28-work-to-continue-but-the-tie-ups-will-ease/stories/200710200106 | title=Route 28 work to continue but the tie-ups will ease }}</ref> The project was completed in 2008.<ref name=":0"/>
In March 2007, a project to add a southbound truck climbing lane from Harmar and Harwick began. They would also repair the northbound roadway, install chain-link fencing, construct new catch basins, relocate the roadway in some areas, and reinforce concrete.<ref>{{cite web | url=https://www.post-gazette.com/local/neighborhoods/2007/10/20/Route-28-work-to-continue-but-the-tie-ups-will-ease/stories/200710200106 | title=Route 28 work to continue but the tie-ups will ease }}</ref> The project was completed in 2008.<ref name=":0"/>
Line 94: Line 96:
A project to rebuild the PA 8 interchange began on August 16, 1999, when the off-ramp from PA 28 southbound from PA 28 northbound was closed for a total of $4.7 million. A new ramp was constructed, it was thicker and excavated in a way to lessen the threat of falling rocks. The project was completed on January 11, 2000. On April 26, 2004, more improvements began at the PA 8 interchange. Before work began, a water line was relocated and a 1,000-foot-long retaining wall built below. Ater this was completed, the through lanes were demolished and rebuilt from the ground up, and the ramp from PA 8 south was permanently closed and replaced by a new, differently constructed one. The $26,500,000 project finished on March 17, 2005. Further work at the PA 8 interchange began on June 7, 2009. This project involved demolishing the old one lane northbound overpass and replacing it with a two-lane overpass. It opened to one lane traffic on October 27, 2009 and opened fully a month later on November 25 drawing to a close the $22.5 million project. Another $27.2 project began at the PA 8 interchange on March 15, 2010. It consisted of roadway reconstruction, bridge replacement, bridge rehabilitation, wall construction, approach roadway widening, drainage, guide rail, concrete barrier, curb, landscaping, highway lighting, signing and pavement markings, signals, and improvements between Exit 4 and Exit 5. The majority of work was completed on December 3, 2010 when two-lane northbound traffic resumed, but minor work continued.<ref name=":0"/>
A project to rebuild the PA 8 interchange began on August 16, 1999, when the off-ramp from PA 28 southbound from PA 28 northbound was closed for a total of $4.7 million. A new ramp was constructed, it was thicker and excavated in a way to lessen the threat of falling rocks. The project was completed on January 11, 2000. On April 26, 2004, more improvements began at the PA 8 interchange. Before work began, a water line was relocated and a 1,000-foot-long retaining wall built below. Ater this was completed, the through lanes were demolished and rebuilt from the ground up, and the ramp from PA 8 south was permanently closed and replaced by a new, differently constructed one. The $26,500,000 project finished on March 17, 2005. Further work at the PA 8 interchange began on June 7, 2009. This project involved demolishing the old one lane northbound overpass and replacing it with a two-lane overpass. It opened to one lane traffic on October 27, 2009 and opened fully a month later on November 25 drawing to a close the $22.5 million project. Another $27.2 project began at the PA 8 interchange on March 15, 2010. It consisted of roadway reconstruction, bridge replacement, bridge rehabilitation, wall construction, approach roadway widening, drainage, guide rail, concrete barrier, curb, landscaping, highway lighting, signing and pavement markings, signals, and improvements between Exit 4 and Exit 5. The majority of work was completed on December 3, 2010 when two-lane northbound traffic resumed, but minor work continued.<ref name=":0"/>


In November 2009, a project began to rebuild the at-garde interchanges on East Ohio Street. The $24.8 million project included demolishing and relocating the Norfolk Southern rail lines, upgrading drainage, replacing the wired traffic signals with overhead gantry ones, utility reconstruction, and wall and bridge replacement along PA 28 from Chestnut Street to the 40th Street Bridge. Bridge pier reconstruction at the 31st Street Bridge, part of the project, involved closing the span on July 6, 2010 which gave commuters a reprieve from at least one signal until August 3, when the intersection was reopened with temporary signals.<ref name=":0"/> In 2011, the southbound lanes of PA 28 were shifted to bypass the intersection of the [[40th Street Bridge]]. The northbound lanes remained under the bridge.<ref name=ppg>{{cite news|last=Schmitz|first=Jon|title=Whole new Route 28 beginning to emerge through construction|url=http://www.post-gazette.com/pg/11271/1178066-53.stm|date=September 28, 2011|access-date=October 4, 2011|work=[[Pittsburgh Post-Gazette]] }}</ref> The American Recovery and Reinvestment Act-funded work was completed by June 2012. In August 2012, an excavation lowered the roadbed of PA 28 at the [[31st Street Bridge]], which had been partially demolished to allow this.<ref name=ppg/> All lanes were clear of lane closures and construction by November, 2014 when Governor [[Tom Corbett]] attended the official groundbreaking ceremony to celebrate all 44.5 miles being expressway-grade. The widening included a small park with a [[Esplanade|promenade]] and a [[retaining wall]] which features several murals on the city's history, including that of the [[Former Saint Nicholas Croatian Catholic Church (Pittsburgh)|Saint Nicholas Croatian Catholic Church]] on the aforementioned structure's site.<ref>[http://www.post-gazette.com/local/city/2015/06/15/Plaza-historic-marker-to-memorialize-St-Nicholas-Church/stories/201506150006 Plaza, historic marker to memorialize St. Nicholas Church in Troy Hill] ''[[Pittsburgh Post-Gazette]]'' (06/15/2015)</ref> Despite being considered complete, various utilities were not completed until May 2015.<ref>https://archive.triblive.com/news/penndot-puts-final-touches-on-route-28-construction/ {{Bare URL inline|date=August 2024}}</ref>
In November 2009, a project began to rebuild the at-garde interchanges on East Ohio Street. The $24.8 million project included demolishing and relocating the Norfolk Southern rail lines, upgrading drainage, replacing the wired traffic signals with overhead gantry ones, utility reconstruction, and wall and bridge replacement along PA 28 from Chestnut Street to the 40th Street Bridge. Bridge pier reconstruction at the 31st Street Bridge, part of the project, involved closing the span on July 6, 2010 which gave commuters a reprieve from at least one signal until August 3, when the intersection was reopened with temporary signals.<ref name=":0"/> In 2011, the southbound lanes of PA 28 were shifted to bypass the intersection of the [[40th Street Bridge]]. The northbound lanes remained under the bridge.<ref name=ppg>{{cite news|last=Schmitz|first=Jon|title=Whole new Route 28 beginning to emerge through construction|url=http://www.post-gazette.com/pg/11271/1178066-53.stm|date=September 28, 2011|access-date=October 4, 2011|work=[[Pittsburgh Post-Gazette]] }}</ref> The American Recovery and Reinvestment Act-funded work was completed by June 2012. In August 2012, an excavation lowered the roadbed of PA 28 at the [[31st Street Bridge]], which had been partially demolished to allow this.<ref name=ppg/> All lanes were clear of lane closures and construction by November, 2014 when Governor [[Tom Corbett]] attended the official groundbreaking ceremony to celebrate all 44.5 miles being expressway-grade. The widening included a small park with a [[Esplanade|promenade]] and a [[retaining wall]] which features several murals on the city's history, including that of the [[Former Saint Nicholas Croatian Catholic Church (Pittsburgh)|Saint Nicholas Croatian Catholic Church]] on the aforementioned structure's site.<ref>[http://www.post-gazette.com/local/city/2015/06/15/Plaza-historic-marker-to-memorialize-St-Nicholas-Church/stories/201506150006 Plaza, historic marker to memorialize St. Nicholas Church in Troy Hill] ''[[Pittsburgh Post-Gazette]]'' (06/15/2015)</ref> Despite being considered complete, various utilities were not completed until May 2015.<ref>https://archive.triblive.com/news/penndot-puts-final-touches-on-route-28-construction/ {{Bare URL inline|date=August 2024}}</ref>


In December 2023, the segment of roadway in Fox Chapel was reconstructed.<ref>{{cite web | url=https://triblive.com/local/valley-news-dispatch/route-28-near-fox-chapel-will-be-limited-to-single-lanes-this-week/ | title=Route 28 near Fox Chapel will be limited to single lanes this week | date=11 December 2023 }}</ref>
In December 2023, the segment of roadway in Fox Chapel was reconstructed.<ref>{{cite web | url=https://triblive.com/local/valley-news-dispatch/route-28-near-fox-chapel-will-be-limited-to-single-lanes-this-week/ | title=Route 28 near Fox Chapel will be limited to single lanes this week | date=11 December 2023 }}</ref>
Line 102: Line 104:
In April 2024, signage updates were made to reduce the likelihood of [[wrong way driving]].<ref>{{cite web | url=https://www.wtae.com/article/route-28-wrong-way-pittsburgh-millvale/60361438 | title=Route 28 wrong-way detectors scheduled for summer installation | date=April 2024 }}</ref> Also, the Brockway intersection was altered.<ref>{{cite web | url=https://www.thecourierexpress.com/news/local/penndot-work-at-busy-brockway-intersection-to-begin-april-1/article_8a59cc38-e7b2-11ee-9f41-db0882141fd1.html | title=PennDOT: Work at busy Brockway intersection to begin April 1 | date=23 March 2024 }}</ref>
In April 2024, signage updates were made to reduce the likelihood of [[wrong way driving]].<ref>{{cite web | url=https://www.wtae.com/article/route-28-wrong-way-pittsburgh-millvale/60361438 | title=Route 28 wrong-way detectors scheduled for summer installation | date=April 2024 }}</ref> Also, the Brockway intersection was altered.<ref>{{cite web | url=https://www.thecourierexpress.com/news/local/penndot-work-at-busy-brockway-intersection-to-begin-april-1/article_8a59cc38-e7b2-11ee-9f41-db0882141fd1.html | title=PennDOT: Work at busy Brockway intersection to begin April 1 | date=23 March 2024 }}</ref>


In erly 2024, a project to reconstruct the roadway between exit 11 and exit 13 is expected to be completed.<ref>{{cite web | url=https://www.penndot.pa.gov/regionaloffices/district-11/pages/details.aspx?newsid=7246#:~:text=Construction%20has%20included%20milling%20and,marking%2C%20and%20other%20miscellaneous%20operations. | title=Details }}</ref>
In early 2024, a project to reconstruct the roadway between exit 11 and exit 13 is expected to be completed.<ref>{{cite web | url=https://www.penndot.pa.gov/regionaloffices/district-11/pages/details.aspx?newsid=7246#:~:text=Construction%20has%20included%20milling%20and,marking%2C%20and%20other%20miscellaneous%20operations. | title=Details }}</ref>


In November 2023, a new roadway was partially completed in Goheenville.<ref>{{cite web |title=November 13-17 Lane Restrictions on Route 28 as Progress Continues on the Goheenville Safety Improvement Project in Armstrong County |url=https://www.penndot.pa.gov/regionaloffices/district-10/pages/details.aspx?newsid=1664 |website=Pennsylvania Department of Transportation |publisher=District 10 |access-date=November 13, 2023}}</ref> After the opening of the new roadway, The old roadway was then closed, the rest of its replacement is expected to be completed by mid 2024.<ref>{{cite web | url=https://www.thecourierexpress.com/the_leader_vindicator/news/local/goheenville-route-28-66-project-progresses-in-armstrong-county/article_5dc40c30-f386-11ee-ac88-1717b1a40f4d.html | title=Goheenville Route 28/66 project progresses in Armstrong County | date=11 April 2024 }}</ref>
In November 2023, a new roadway was partially completed in Goheenville.<ref>{{cite web |title=November 13-17 Lane Restrictions on Route 28 as Progress Continues on the Goheenville Safety Improvement Project in Armstrong County |url=https://www.penndot.pa.gov/regionaloffices/district-10/pages/details.aspx?newsid=1664 |website=Pennsylvania Department of Transportation |publisher=District 10 |access-date=November 13, 2023}}</ref> After the opening of the new roadway, the old roadway was then closed, with the rest of its replacement is expected to be completed by mid-2024.<ref>{{cite web | url=https://www.thecourierexpress.com/the_leader_vindicator/news/local/goheenville-route-28-66-project-progresses-in-armstrong-county/article_5dc40c30-f386-11ee-ac88-1717b1a40f4d.html | title=Goheenville Route 28/66 project progresses in Armstrong County | date=11 April 2024 }}</ref>


In June 2024, construction began on repairs to two structures in Armstrong County. This was completed in September.<ref>It was completed in September 2024.<ref>https://www.pa.gov/agencies/penndot/news-and-media/newsroom/district-10/route-28-rehabilitation-to-begin-in-armstrong-county-.html#:~:text=All%20work%20is%20weather%20dependent,visiting%20www.511PA.com.</ref>
In June 2024, construction began on repairs to two structures in Armstrong County. This was completed in September 2024.<ref>https://www.pa.gov/agencies/penndot/news-and-media/newsroom/district-10/route-28-rehabilitation-to-begin-in-armstrong-county-.html#:~:text=All%20work%20is%20weather%20dependent,visiting%20www.511PA.com.</ref>


In its 2015 transportation plan, the [[Pennsylvania Turnpike Commission]] (PTC) announced it was interested in building an extension of the Expressway to I-80. Studies for this project began in May 2019.<ref name=":0"/>
In its 2015 transportation plan, the [[Pennsylvania Turnpike Commission]] (PTC) announced it was interested in building an extension of the Expressway to I-80. Studies for this project began in May 2019.<ref name=":0"/>


The only thing keeping PA-28 from having a interstate designation are the 45-mph speed limits near the Millvale and Etna Exits, as well as the section of the southbound one-lane expressway between Exit 9 (Blawnox Exit), and Exit 8,(Waterworks Exit). If these are ever to be upgraded to [[Interstate Highway standards]], PA 28 will be up to [[Interstate Highway standards]] from its southern terminus all the way to Kittanning, and could potentially receive an [[Interstate Highway System|Interstate]] designation in the future.<ref name="Highland Park Bridge">[http://pittsburgh.cbslocal.com/2017/12/12/penndot-plans-improve-route-28-highland-park-bridge/ PennDOT Plans Improvements To Route 28 At Highland Park Bridge] [[KDKA-TV]] (12/12/2017)</ref>
The only things keeping PA-28 from having a interstate designation are the 45-mph speed limits near the Millvale and Etna Exits, as well as the section of the southbound one-lane expressway between Exit 9 (Blawnox Exit), and Exit 8 (Waterworks Exit). If these are ever to be upgraded to [[Interstate Highway standards]], PA 28 will be up to [[Interstate Highway standards]] from its southern terminus all the way to Kittanning, and could potentially receive an [[Interstate Highway System|Interstate]] designation in the future.<ref name="Highland Park Bridge">[http://pittsburgh.cbslocal.com/2017/12/12/penndot-plans-improve-route-28-highland-park-bridge/ PennDOT Plans Improvements To Route 28 At Highland Park Bridge] [[KDKA-TV]] (12/12/2017)</ref>


==Major intersections==
==Major intersections==
Line 444: Line 446:
|formed=1963
|formed=1963
|length_mi=3.3
|length_mi=3.3
|length_ref=<ref name=GMTruck>{{google maps |url=https://maps.google.com/maps?saddr=Allegheny+Blvd&daddr=Unknown+road&hl=en&ll=41.166945,-79.07192&spn=0.055567,0.111494&sll=41.167804,-79.046491&sspn=0.003473,0.006968&geocode=FT8adAIdLhBJ-w%3BFY0qdAIdxdpJ-w&mra=me&mrsp=1,0&sz=18&t=m&z=14 |title=PA Route 28 Truck |access-date=August 13, 2014}}</ref>
|length_ref=<ref name=GMTruck>{{google maps |url=https://maps.google.com/maps?saddr=Allegheny+Blvd&daddr=Unknown+road&hl=en&ll=41.166945,-79.07192&spn=0.055567,0.111494&sll=41.167804,-79.046491&sspn=0.003473,0.006968&geocode=FT8adAIdLhBJ-w%3BFY0qdAIdxdpJ-w&mra=me&mrsp=1,0&sz=18&t=m&z=14 |title=PA Route 28 Truck |access-date=August 13, 2014}}</ref>
}}
}}



Revision as of 18:14, 2 January 2025

Pennsylvania Route 28 marker
Pennsylvania Route 28
Map
Route information
Maintained by PennDOT
Length98.264 mi[1] (158.141 km)
Existed1927–present
Major junctions
South endAnderson Street in Pittsburgh[2][3]
Major intersections
North end US 219 in Brockway
Location
CountryUnited States
StatePennsylvania
CountiesAllegheny, Butler, Armstrong, Clarion, Jefferson
Highway system
PA 27 PA 29

Pennsylvania Route 28 (PA 28) is a major state highway, which runs for 98 miles (158 km) from Anderson Street in Pittsburgh to U.S. Route 219 (US 219) in Brockway in Pennsylvania in the United States.

From Pittsburgh to Kittanning, it is a 44.5-mile-long (71.6 km) limited access expressway that is named the Alexander H. Lindsay Memorial Highway, and is also known as the Allegheny Valley Expressway. It is named after Alexander Lindsay, a lawyer who lived in South Buffalo and commuted to work in Pittsburgh; he successfully lobbied for the city to be connected to the proposed Keystone Shortway (I-80).[4]

Route description

PA 28 northbound approaching the exit for the 40th Street Bridge in Millvale

PA 28 begins adjacent to Downtown Pittsburgh at Anderson Street near the Interstate 279 (I-279)/I-579 interchange and travels north/northeast along the northern bank of the Allegheny River. Until recently the route was a surface street for the first two miles (3.2 km) until the 40th Street Bridge and then an expressway from 40th Street to Kittanning. Upgrades in 2013 made it a limited-access highway throughout its 44.5 miles (71.6 km) in the Pittsburgh metropolitan area from the route's start at I-279 to Rayburn Township, Armstrong County, with Governor Tom Corbett attending the completion ceremony on November 17, 2014.[5]

In Etna, PA 28 interchanges with Pennsylvania Route 8 at exit 5 before departing the Blue Belt, which PA 28 is part of from I-279/I-579 to this point, at exit 6 near Aspinwall. Near Harmar Township, PA 28 meets Pennsylvania Route 910 at exit 11 which provided access to Interstate 76 (the Pennsylvania Turnpike).

From exit 11 to U.S. Route 422 west of Kittanning, PA 28 has eight interchanges, including exits with Pittsburgh Mills Boulevard (exit 12A), Pennsylvania Route 366 (exit 14), and Pennsylvania Route 356 (exit 17), while continuing to parallel the Allegheny to the east. Exit 18 consists of Pennsylvania Route 128 crossing or which used to be old 28 before the expressway. At exit 19, PA 28 merges with the limited-access US 422 and heads east along US 422 as it proceeds south of West Kittanning.[6]

Upon crossing the Allegheny River and entering Kittanning, US 422 and PA 28 interchange with Pennsylvania Route 66. PA 66 then joins the concurrency for two miles (3 km) to an exit with U.S. Route 422 Business southeast of downtown Kittanning. Here, US 422 leaves the freeway and heads east toward Indiana while PA 28 and PA 66 remain concurrent as they progress northward.

The 41-mile-long (66 km) freeway ends with a concurrency with Pennsylvania Route 66. In Rayburn Township, PA 28/PA 66 intersects the western terminus of Pennsylvania Route 85. After PA 85, PA 28/PA 66 head towards the northeast. In South Bethlehem, PA 28/PA 66 become North Street and Broad Street then intersecting the northern terminus of Pennsylvania Route 839.

PA 28 northbound past PA 536 in Redbank Township

After crossing Redbank Creek, PA 28/PA 66 enters Clarion County and New Bethlehem. In downtown New Bethlehem, PA 66 splits off from PA 28 and making the PA 28/PA 66 concurrency one of the longest concurrencies in Pennsylvania. After the split, PA 28 heads northeast as Broad Street paralleling Redbank Creek. In Hawthorn, PA 28 is called Brookville Street and meets the western terminus of Pennsylvania Route 536. North of PA 536, PA 28 begins to slide to the north instead of the northeast.

In Summerville, PA 28's course begins to slide towards the northeast again and in Summerville, PA 28 is called Harrison Street. In Clover and Rose townships, PA 28 parallels many railroads tracks that even cross it.

In Brookville, PA 28 has a wrong-way concurrency with U.S. Route 322 and Pennsylvania Route 36. The reason of the wrong-way concurrency is that PA 28 is heading north while PA 36 is heading south on the concurrency with US 322. In downtown Brookville, PA 36 splits off from US 322/PA 28. Then after crossing North Fork Creek, US 322/PA 28 meet the southern terminus of the former Pennsylvania Route 968.

East of here, US 322 splits off from PA 28 at a "T" interchange. East of Brookville in Pine Creek Township, PA 28 intersects Interstate 80 at exit 81 a diamond interchange. North of I-80, PA 28 continues north as a local road without intersecting another route for more than 14 miles (23 km). PA 28 passes through the many wildlife in Pennsylvania through a forest region. In Brockway, PA 28 is called Main Street before terminating (ending) at a "T" intersection with U.S. Route 219.

History

PA 28 southbound from exit 14 (PA 366)

In 1927, PA 28 was created, being signed on existing two laned roads from Pittsburgh to Kittanning.[4] The highway was signed to Brockway in 1928. That same year, the route was under construction from Blawnox to Cheswick, Troy Hill Road to Oakland, and Hazen to Reitz Crossing Road. Those sections were completed in 1929, at which point the section from Avella to Woodrow and from Hickory to Fort Cherry Road began construction.[7] In 1929, the segments from Blawnox to Cheswick, Troy Hill Road to Oakland, and Hazen to Reitz Crossing Road were completed.[7] By 1930, the roadway had been paved from Skyline Road to PA 18, and the segment from Blawnox to Cheswick had been opened to traffic. The southern terminus was also extended from Avella to Independence.[7]

On July 15, 1960, the highway's southern terminus was moved from Independence to PA 8 in Etna. The former section of PA 28 from South Main Street in the West End Valley to the intersection of Noblestown Road and Crafton Boulevard in Crafton Heights was redesignated as PA 60. The remaining 83-mile stretch from Crafton Heights to Independence was renumbered PA 50. This designation change was made to reduce the number of concurrent routes in Pittsburgh. The changes took effect a few months later and signs were changed by the spring of 1961.[8]

In 1965, PA 28 was realigned onto Courthouse Road to bypass the more congested parts of Kittanning.[7]

In 1977, new emergency truck stopping lanes were constructed.[9]

In 1948, construction began on a new expressway bypass of the segment traveling through Millville. It was opened to traffic in 1950.[10] In 1957, construction began on another expressway bypass of Sharpsburg. This new alignment was opened to traffic on October 22, 1958.[10][11] At the same time a reconstruction of the road to expressway standards from Sharpsburg to Etna was completed.[12] In 1958, construction began on another stretch of freeway between PA 8 north to the Highland Park Bridge interchange. This opened to traffic in 1963, replacing the previous segment that ran through Etna.[10] In 1964, the roadway to Blawnox was opened, also part of this project was the reconstruction of the segment from Brackenridge and Butler to expressway standards.[7] That same year, the interchange with I-80 was opened.[13] In 1968, the segment to Fox Run Road was completed.[10] In 1972, the segment from Exit 16 to Armstrong County and from Blawnox to PA 910 and from Exit 15 to US 422 was opened to traffic. Construction on this section began in 1968.[7] In 1973, part of the roadway from Exit 11 to Exit 12 was opened. The route was also extended to end at US 19/PA 65 at Chateau Street via Western Avenue and East Ohio Street.[7] On October 17, 1980, the expressway from Exit 12 to the north border of Tarentum was opened to traffic, it was also extended onto a new at-grade segment.[9] The final stretch of the Allegheny Valley Expressway between Exit 13 and Exit 15 opened in 1985, PA 28 was subsequently removed from Freeport Road.[7]

In 1987, through traffic at the Highland Park interchange was restricted from two lanes to one lane, with deceleration lanes and emergency shoulders being added in their place. This was done to increase safety, as well better serve high demand for the bridge itself.

In 1989, a freeway portion from Ninth Street to East Ohio Street was opened to traffic.[7]

In 1993, PA 28’s northern terminus was relocated from the West End Bridge to the I-279 interchange, this made it so that the entire Allegheny Valley Expressway was signed as PA 28.[7]

In the late 1980s, plans to reconstruct the roadway from Millvale to Etna were made. This came after the section saw 169 accidents from 1982 through 1987, 96 of such were injuries, with 4 causing fatalities. Construction began on September 6, 1988, and involved blasting 600,000 cubic yards of rock from the hillside that parallels the highway to reduce slides, widening the lanes to 12 feet each, adding 10-foot-wide shoulders, adding should pull-off areas such as on the eastern segment, and placing a Jersey barrier in the middle of the four foot median. The Etna interchange received new lights and signage. The $14.4 million project that required four lanes of traffic to squeeze into two finally came to an end on December 7, 1990, due to rain hampering construction. Glare screen was erected on the Jersey barrier in 1991 to cut down on the effects of headlights from oncoming traffic. Due to the placement in the median instead of the outside due to the narrow right-of-way, the lights came online in 1995. Lighting standards were not installed because of financial uncertainty.[7]

On May 20, 1996, an act of the Pennsylvania legislature officially renamed the Allegheny Valley Expressway as the Alexander H. Lindsay Highway.[14]

On March 12, 2001, a $13 million project to reconstruct the roadway between exit 6 and exit 10 began. It concluded on September 20, 2001, half a million dollars under budget.[7]

As early as 1953, there had been proposals for a bypass of Kittanning due to heavy congestion.[9] Construction on this bypass began on March 24, 2000. It was opened to traffic on December 13, 2001.[7]

In 2003, after rocks and debris fell from a common rock fall segment of the roadway, it was decided to reduce the roadway from two to one lane in the southbound direction.[7]

In 2004, an interchange was opened in Harwick to serve the Pittsburgh Mills shopping center.[10]

In the spring of 2006, the 2.9 mile stretch of roadway south of exit 17 was rebuilt.[15]

In March 2007, a project to add a southbound truck climbing lane from Harmar and Harwick began. They would also repair the northbound roadway, install chain-link fencing, construct new catch basins, relocate the roadway in some areas, and reinforce concrete.[16] The project was completed in 2008.[7]

On March 31, 2008, construction began on a new ramp to I-279 southbound. The new $7.9 million ramp opened to traffic on September 25, 2008.[7]

A project to rebuild the PA 8 interchange began on August 16, 1999, when the off-ramp from PA 28 southbound from PA 28 northbound was closed for a total of $4.7 million. A new ramp was constructed, it was thicker and excavated in a way to lessen the threat of falling rocks. The project was completed on January 11, 2000. On April 26, 2004, more improvements began at the PA 8 interchange. Before work began, a water line was relocated and a 1,000-foot-long retaining wall built below. Ater this was completed, the through lanes were demolished and rebuilt from the ground up, and the ramp from PA 8 south was permanently closed and replaced by a new, differently constructed one. The $26,500,000 project finished on March 17, 2005. Further work at the PA 8 interchange began on June 7, 2009. This project involved demolishing the old one lane northbound overpass and replacing it with a two-lane overpass. It opened to one lane traffic on October 27, 2009 and opened fully a month later on November 25 drawing to a close the $22.5 million project. Another $27.2 project began at the PA 8 interchange on March 15, 2010. It consisted of roadway reconstruction, bridge replacement, bridge rehabilitation, wall construction, approach roadway widening, drainage, guide rail, concrete barrier, curb, landscaping, highway lighting, signing and pavement markings, signals, and improvements between Exit 4 and Exit 5. The majority of work was completed on December 3, 2010 when two-lane northbound traffic resumed, but minor work continued.[7]

In November 2009, a project began to rebuild the at-garde interchanges on East Ohio Street. The $24.8 million project included demolishing and relocating the Norfolk Southern rail lines, upgrading drainage, replacing the wired traffic signals with overhead gantry ones, utility reconstruction, and wall and bridge replacement along PA 28 from Chestnut Street to the 40th Street Bridge. Bridge pier reconstruction at the 31st Street Bridge, part of the project, involved closing the span on July 6, 2010 which gave commuters a reprieve from at least one signal until August 3, when the intersection was reopened with temporary signals.[7] In 2011, the southbound lanes of PA 28 were shifted to bypass the intersection of the 40th Street Bridge. The northbound lanes remained under the bridge.[17] The American Recovery and Reinvestment Act-funded work was completed by June 2012. In August 2012, an excavation lowered the roadbed of PA 28 at the 31st Street Bridge, which had been partially demolished to allow this.[17] All lanes were clear of lane closures and construction by November, 2014 when Governor Tom Corbett attended the official groundbreaking ceremony to celebrate all 44.5 miles being expressway-grade. The widening included a small park with a promenade and a retaining wall which features several murals on the city's history, including that of the Saint Nicholas Croatian Catholic Church on the aforementioned structure's site.[18] Despite being considered complete, various utilities were not completed until May 2015.[19]

In December 2023, the segment of roadway in Fox Chapel was reconstructed.[20]

On December 12, 2017, PennDOT announced a plan to widen the roadway to have two through lanes at the Highland Park interchange, though retaining the dedicated exit and entrance lanes for the exit approaches themselves. Work started in 2021. The project was completed in March 2024.[21]

In April 2024, signage updates were made to reduce the likelihood of wrong way driving.[22] Also, the Brockway intersection was altered.[23]

In early 2024, a project to reconstruct the roadway between exit 11 and exit 13 is expected to be completed.[24]

In November 2023, a new roadway was partially completed in Goheenville.[25] After the opening of the new roadway, the old roadway was then closed, with the rest of its replacement is expected to be completed by mid-2024.[26]

In June 2024, construction began on repairs to two structures in Armstrong County. This was completed in September 2024.[27]

In its 2015 transportation plan, the Pennsylvania Turnpike Commission (PTC) announced it was interested in building an extension of the Expressway to I-80. Studies for this project began in May 2019.[7]

The only things keeping PA-28 from having a interstate designation are the 45-mph speed limits near the Millvale and Etna Exits, as well as the section of the southbound one-lane expressway between Exit 9 (Blawnox Exit), and Exit 8 (Waterworks Exit). If these are ever to be upgraded to Interstate Highway standards, PA 28 will be up to Interstate Highway standards from its southern terminus all the way to Kittanning, and could potentially receive an Interstate designation in the future.[28]

Major intersections

CountyLocationmi[1]kmExitDestinationsNotes
AlleghenyPittsburgh0.0000.000Anderson StreetSouthern terminus of PA 28
0.073–
0.111
0.117–
0.179
River AvenueNorthbound entrance / exit only
0.3750.604Chestnut StreetNorthbound exit only
0.414–
0.746
0.666–
1.201
1B

To I-279 north / East Ohio Street – PNC Park, Acrisure Stadium, Allegheny Center
No southbound entrance; signed as exit 1B southbound only
0.4580.7371A


I-579 south (Veterans Bridge) / I-279 south (Fort Pitt Bridge) to I-376 – Monroeville, Airport
Southbound exit and northbound entrance
1.497–
1.750
2.409–
2.816
231st Street BridgeStrip District
Millvale2.319–
2.456
3.732–
3.953
3A40th Street BridgeLawrencevilleInverted SPUI/continuous green T hybrid interchange; no northbound entrance (northbound traffic directed to 3B entrance)
2.647–
2.857
4.260–
4.598
3B Blue Belt – MillvaleNo southbound entrance (southbound traffic directed to 3A entrance), southern terminus of Blue Belt concurrency
Etna3.9686.3864EtnaNorthbound exit and southbound entrance
4.522–
4.539
7.277–
7.305
5A
PA 8 south (R.D. Fleming Bridge) – Sharpsburg
Northbound exit and southbound entrance
4.567–
4.813
7.350–
7.746
5B
PA 8 north – Butler, Etna
Signed as exit 5 southbound
6.218–
6.418
10.007–
10.329
6



To PA 8 south / Highland Park Bridge / Blue Belt / Green Belt – Aspinwall
Northern terminus of Blue Belt concurrency, southern terminus of Green Belt concurrency
Aspinwall6.846–
7.123
11.018–
11.463
7Delafield AvenueNo southbound exit
7.618–
7.771
12.260–
12.506
8Freeport Road, Fox Chapel Road ( Green Belt), Waterworks DriveNorthern terminus of Green Belt concurrency
Blawnox8.003–
8.029
12.880–
12.921
9BlawnoxNorthbound exit and southbound entrance
8.922–
9.250
14.359–
14.886
10R.I.D.C. Drive
Harmar Township12.038–
12.493
19.373–
20.106
11


PA 910 west / Yellow Belt to I-76 / Penna Turnpike – Harmarville, Harmar
Eastern terminus of PA 910
Cheswick13.715–
14.191
22.072–
22.838
12Cheswick, Springdale
14.990–
15.462
24.124–
24.884
12APittsburgh Mills Boulevard
Creighton16.373–
17.236
26.350–
27.739
13 Orange Belt – Russellton, CreightonNorthbound exit and southbound entrance
Tarentum18.125–
19.382
29.169–
31.192
14
PA 366 east / Red Belt – Tarentum, Brackenridge, New Kensington, Arnold, Lower Burrell, Fawn Township
Western terminus of PA 366
Harrison Township20.805–
21.226
33.482–
34.160
15Natrona Heights, Natrona, BrackenridgeBrackenridge appears on southbound signs only.
23.717–
24.147
38.169–
38.861
16Freeport, MillerstownFreeport appears on northbound signs only.
ButlerBuffalo Township25.337–
25.816
40.776–
41.547
17 PA 356 – Freeport, Butler
ArmstrongNorth Buffalo Township31.346–
31.842
50.446–
51.245
18 PA 128 – Slate Lick, Northpointe
East Franklin Township37.480–
38.000
60.318–
61.155
19
US 422 west – Butler, West Kittanning
Southern terminus of US 422 concurrency
Manor Township39.915–
40.001
64.237–
64.375
A
PA 66 south – Ford City
Southern terminus of PA 66 (southbound) concurrency; exits to PA 66 southbound only
40.256–
40.590
64.786–
65.323
B

To US 422 Bus. – Kittanning
Southern terminus of PA 66 (northbound) concurrency; no access to PA 66 southbound
41.511–
42.302
66.805–
68.078



US 422 east / US 422 Bus. west – Indiana, Kittanning
Northern terminus of US 422 concurrency; eastern terminus of US 422 Bus.
42.80668.890Northern terminus of freeway
Rayburn Township42.80668.890
PA 85 east – Rural Valley, Plumville
Western terminus of PA 85
South Bethlehem59.87196.353
PA 839 south – Mahoning Dam
Northern terminus of PA 839
ClarionNew Bethlehem60.17696.844
PA 66 north – Clarion
Northern terminus of PA 66 concurrency
Redbank Township65.661105.671
PA 536 east (Mayport Road) / Wallwork Road – Mayport
Western terminus of PA 536
JeffersonClover Township73.103117.648
PA 949 north (Summerville-Corsica Road) / Water Street – Corsica
Southern terminus of PA 949
Brookville79.500127.943




US 322 west (28th Division Highway) / PA 36 north / PA 28 Truck north (Allegheny Boulevard) to I-80 – Leeper, Clarion
Southern terminus of US 322/PA 36 concurrency; southern terminus of PA 28 Truck
80.282129.201
PA 36 south (White Street) – Punxsutawney
Northern terminus of PA 36 concurrency
Pine Creek Township81.421131.034
US 322 east – Reynoldsville
Northern terminus of US 322 concurrency
82.580–
82.696
132.900–
133.086


I-80 / PA 28 Truck south – Clarion, DuBois
Exit 81 (I-80); northern terminus of PA 28 Truck
Brockway98.264158.141 US 219 (Main Street / Cherry Street) – Ridgway, DuBoisNorthern terminus of PA 28
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

PA 28 Truck

Truck plate.svg
Pennsylvania Route 28 Truck marker
Pennsylvania Route 28 Truck
LocationBrookville, Pennsylvania
Length3.3 mi[29] (5.3 km)
Existed1963–present

Pennsylvania Route 28 Truck is a 3-mile-long (4.8 km) truck route in Brookville, Jefferson County, Pennsylvania. As Route 28 travels through the Brookville city center, it becomes a narrow main street and features a relatively sharp turn just west of the bridge over North Fork Creek. As a result, after the completion of Interstate 80, Route 28's truck traffic was shifted onto this freeway bypass from Exit 78 at Pennsylvania Route 36 (which Truck 28 is cosigned for its first 1/2 mile of existence) to Exit 81, where Route 28 meets the highway.

See also

References

  1. ^ a b Bureau of Maintenance and Operations (January 2019). Roadway Management System Straight Line Diagrams (Report) (2019 ed.). Pennsylvania Department of Transportation. Retrieved April 13, 2019.
  2. ^ Quadrant marker 10 for PA Route 28 marking the beginning of the route (Map). Google Maps. Retrieved 2014-04-28.
  3. ^ End quadrant marker for PA Route 28 marking the end of the route (Map). Google Maps. Retrieved 2014-04-28.
  4. ^ a b "Dream of 'nicer commute' genesis of Route 28". TribLive. Retrieved 13 October 2020.
  5. ^ Schmitz, Jon (17 November 2014). "After six years, Route 28 reconstruction project ends". Pittsburgh Post-Gazette. Retrieved 12 July 2020.
  6. ^ "Pennsylvania Route 28" (Map). Google Maps. Retrieved August 13, 2014.
  7. ^ a b c d e f g h i j k l m n o p q r s "Pittsburgh Highways: Allegheny Valley Expressway".
  8. ^ "Designations Of Highways Are Changed". The Evening Standard. Uniontown, PA. July 16, 1960. p. 7. Retrieved August 28, 2015 – via Newspapers.com. Open access icon
  9. ^ a b c https://archive.triblive.com/news/a-15-a-two-decade-wait-ends/ [bare URL]
  10. ^ a b c d e "Remember when: Allegheny Valley Expressway took much longer to build than anticipated". 4 May 2022.
  11. ^ https://historicpittsburgh.org/islandora/object/pitt:MSP285.B010.F21.I02 [bare URL]
  12. ^ "Pennsylvania Highways: PA 1 - PA 50".
  13. ^ "Pennsylvania Highways: Interstate 80".
  14. ^ https://www.legis.state.pa.us/WU01/LI/LI/US/PDF/1996/0/0031..PDF
  15. ^ https://archive.triblive.com/news/road-construction-on-route-28-slated-to-begin-in-spring-2006/ [bare URL]
  16. ^ "Route 28 work to continue but the tie-ups will ease".
  17. ^ a b Schmitz, Jon (September 28, 2011). "Whole new Route 28 beginning to emerge through construction". Pittsburgh Post-Gazette. Retrieved October 4, 2011.
  18. ^ Plaza, historic marker to memorialize St. Nicholas Church in Troy Hill Pittsburgh Post-Gazette (06/15/2015)
  19. ^ https://archive.triblive.com/news/penndot-puts-final-touches-on-route-28-construction/ [bare URL]
  20. ^ "Route 28 near Fox Chapel will be limited to single lanes this week". 11 December 2023.
  21. ^ "Drivers rejoice as new lanes open — and alleviate traffic — on Route 28 at the Highland Park Bridge".
  22. ^ "Route 28 wrong-way detectors scheduled for summer installation". April 2024.
  23. ^ "PennDOT: Work at busy Brockway intersection to begin April 1". 23 March 2024.
  24. ^ "Details".
  25. ^ "November 13-17 Lane Restrictions on Route 28 as Progress Continues on the Goheenville Safety Improvement Project in Armstrong County". Pennsylvania Department of Transportation. District 10. Retrieved November 13, 2023.
  26. ^ "Goheenville Route 28/66 project progresses in Armstrong County". 11 April 2024.
  27. ^ https://www.pa.gov/agencies/penndot/news-and-media/newsroom/district-10/route-28-rehabilitation-to-begin-in-armstrong-county-.html#:~:text=All%20work%20is%20weather%20dependent,visiting%20www.511PA.com.
  28. ^ PennDOT Plans Improvements To Route 28 At Highland Park Bridge KDKA-TV (12/12/2017)
  29. ^ "PA Route 28 Truck" (Map). Google Maps. Retrieved August 13, 2014.