Jump to content

Line 28 (Beijing Subway): Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
Adding local short description: "Proposed railway line in Beijing, China", overriding Wikidata description "line of Beijing Subway that is under construction"
Line 1: Line 1:
{{Short description|Proposed railway line in Beijing, China}}
{{Infobox rail line
{{Infobox rail line
| name =
| name =

Revision as of 09:04, 3 November 2023

Line 28
 28 
Construction site in February 2021
Overview
Other name(s)M28 (planned name)
CBD line
StatusUnder construction[1]
LocaleChaoyang district
Beijing
Termini
Stations9
Service
TypeRapid Transit
SystemBeijing Subway
Rolling stock6-car Type LB
History
Planned opening2025; 1 year's time (2025) (planned)[2]
Technical
Line length8.877 km (5.516 mi) (Phase 1)[3]
CharacterUnderground
Operating speed80 km/h (50 mph)[3]
Route map

Dongdaqiao
Jintai Xizhao
Left arrow inner – outer Right arrow
Guanghualu
Hexinqu
Dawang Lu
Line 14
Beijing East railway station
Dajiaoting
Guangqulu
Guangqudonglu
Guangqudonglu depot

Line 28 of the Beijing Subway (Chinese: 北京地铁28号线; pinyin: běijīng dìtiě èrshíbā hàoxiàn) is a rapid transit line under construction in Beijing. It was formerly known as CBD line.

Construction started in July 2021.[1] It is planned to open in 2025.[2]

List of Stations

Station Name[4] Connections Distance
km
Location
English Chinese
Dongdaqiao 东大桥  6   17   Pinggu  Chaoyang
Jintai Xizhao 金台夕照  10   Pinggu 
Guanghualu 光华路
Hexinqu 核心区
Dawang Lu 大望路  1   14 
Beijing East railway station 北京东站 Sub-Central Beijing East railway station BOP
Dajiaoting 大郊亭  7 
Guangqulu 广渠路
Guangqudonglu 广渠东路

History

In August 2015, planning authorities proposed an underground automatic people mover (APM) line through the Central Business District (CBD).[5]

According to the most recent plan announced in August 2019, the line will run 8.877 km (5.516 mi), have 9 stations from Dongdaqiao to Guangqudonglu.[3] The line was redesigned into a higher capacity light metro line, not an automatic people mover (APM).[3]

A feasibility study for the line was approved in October 2020.[4]

Construction started in July 2021.[1]

Rolling stock

It will use 6-car Type LB linear motor rolling stock, similar to the Capital Airport Express of Beijing Subway, and Guangzhou Metro's Line 4, Line 5 and Line 6.[1]

References

  1. ^ a b c d "北京地铁28号线首站启动建设". 2021-07-27.
  2. ^ a b "CBD:京城老牌商务区升级之旅". 2021-01-25. Archived from the original on 2021-03-12. Retrieved 2021-03-12. 该项目已被列入2020年北京市政府重点工程计划,并计划于2025年建成
  3. ^ a b c d "北京地铁28号线最新车站方案公布:5座车站可以换乘". 2019-08-20.
  4. ^ a b www.bjnews.com.cn. "地铁28号线可行性研究报告批复,纳入今年北京市政府重点工程". www.bjnews.com.cn. Retrieved 2020-10-21.
  5. ^ Cao Zheng (曹政) (13 August 2015). CBD拟通'地下小火车:初步设8站 呈Z形斜穿'. Beijing Daily. Archived from the original on 26 November 2015. Retrieved 12 November 2015.