M2 (İzmir Metro): Difference between revisions
Erkinalp9035 (talk | contribs) No edit summary |
updates |
||
Line 19: | Line 19: | ||
| stations = 11 |
| stations = 11 |
||
| routes = Çamlıkule-Üçyol-Eşrefpaşa-Çamlıkule <br/> Tınaztepe-Eşrefpaşa-Üçyol-Tınaztepe (limited service) |
| routes = Çamlıkule-Üçyol-Eşrefpaşa-Çamlıkule <br/> Tınaztepe-Eşrefpaşa-Üçyol-Tınaztepe (limited service) |
||
| daily_ridership = 400000 (expected)<ref name="groundbreaking">{{Cite web |date=2022-02-14 |title=Başkan Soyer: “Ekonomik krizin tam ortasında İzmir tarihinin en büyük yatırımını başlatıyoruz” |url=https://www.izmir.bel.tr/tr/Haberler/baskan-soyer-ekonomik-krizin-tam-ortasinda-izmir-tarihinin-en-buyuk-yatirimini-baslatiyoruz/46248/156 |access-date=2022-02-17 |website=İzmir Büyükşehir Belediyesi |language=TR}}</ref> |
|||
| daily_ridership = |
|||
| ridership2 = |
| ridership2 = |
||
| open = |
| open = 2026 (expected) |
||
| yearcommenced = |
| yearcommenced = |
||
| yearcompleted = |
| yearcompleted = |
||
Line 33: | Line 33: | ||
| operator = [[İzmir Metro A.Ş.]] |
| operator = [[İzmir Metro A.Ş.]] |
||
| character = |
| character = |
||
| depot = {{ubl| |
| depot = {{ubl|Adatepe depot|Eşrefpaşa siding}} |
||
| stock = |
| stock = |
||
| linelength_km = 11.3 |
| linelength_km = 11.3 |
||
Line 61: | Line 61: | ||
| embedded = |
| embedded = |
||
}} |
}} |
||
The '''M2''' line, also referred as '''Üçyol–Çamlıkule Line''' ({{lang-tr|Üçyol–Çamlıkule Hattı}}) is a planned [[Automatic train operation|ATO]] [[rapid transit]] line in [[İzmir]], [[Turkey]].<ref name=Buca /><ref name=Izmir /> The line has a total length of {{convert|11.3|km|abbr=on}} and would begin at [[Üçyol (İzmir Metro)|Üçyol]] and run southeast into [[Buca]].<ref name=Izmir /> When completed, the line will become the third driverless metro line in Turkey, after the [[M5 (Istanbul Metro)|M5]] and [[M7 (Istanbul Metro)|M7]] lines in [[Istanbul]]. Construction is expected to begin at 2021 and the line is expected to enter service in 2024. |
The '''M2''' line, also referred as '''Üçyol–Çamlıkule Line''' ({{lang-tr|Üçyol–Çamlıkule Hattı}}) is a planned [[Automatic train operation|ATO]] [[rapid transit]] line in [[İzmir]], [[Turkey]].<ref name=Buca /><ref name=Izmir /> The line has a total length of {{convert|11.3|km|abbr=on}} and would begin at [[Üçyol (İzmir Metro)|Üçyol]] and run southeast into [[Buca]].<ref name=Izmir /> When completed, the line will become the third driverless metro line in Turkey, after the [[M5 (Istanbul Metro)|M5]] and [[M7 (Istanbul Metro)|M7]] lines in [[Istanbul]]. Construction is expected to begin at 2021 and the line is expected to enter service in 2024. |
||
It will cost $765 million, and the yearly expected profit from operation is $45 million.<ref name="groundbreaking" /> |
|||
It will cost $1 billion.<ref name="yatirim"/> |
|||
==History== |
==History== |
||
Line 71: | Line 71: | ||
===Planning=== |
===Planning=== |
||
Once the Fahrettin Altay extension of the existing metro line was completed in 2014, the city shifted its focus to the Buca metro. The line was originally planned to consist of seven stations and terminate at Buca Koop., one station before Çamlıkule. The plans were handed to the Ministry of Transport for evaluation in August 2015.<ref name=IZBEL /> The evaluation process took 12 months and was modified to extend the line from Buca Koop. to Çamlıkule as well as redesign the western end of the line as a loop.<ref name=Izmir /> West of General Asım Gündüz station, the line would split and form a loop with Üçyol placed at the top. The northeastern part of the loop would consist of a station at Zafertepe, while the southwestern part would consist of a station at Bozyaka. The two sections would meet at Üçyol.<ref name=Izmir /> A new maintenance facility in Tınaztepe was also included. The plan was finalized by the İzmir Municipality and submitted for an [[Environmental impact assessment]] in July 2017.<ref name=ESH /><ref name=ESS /> Construction is expected to begin in |
Once the Fahrettin Altay extension of the existing metro line was completed in 2014, the city shifted its focus to the Buca metro. The line was originally planned to consist of seven stations and terminate at Buca Koop., one station before Çamlıkule. The plans were handed to the Ministry of Transport for evaluation in August 2015.<ref name=IZBEL /> The evaluation process took 12 months and was modified to extend the line from Buca Koop. to Çamlıkule as well as redesign the western end of the line as a loop.<ref name=Izmir /> West of General Asım Gündüz station, the line would split and form a loop with Üçyol placed at the top. The northeastern part of the loop would consist of a station at Zafertepe, while the southwestern part would consist of a station at Bozyaka. The two sections would meet at Üçyol.<ref name=Izmir /> A new maintenance facility in Tınaztepe was also included. The plan was finalized by the İzmir Municipality and submitted for an [[Environmental impact assessment]] in July 2017.<ref name=ESH /><ref name=ESS /> Construction is expected to begin in 2022 and completed by 2026. Due to a contest notice filed by the [[9th September University]], the maintenance facility location changed to Adatepe. This also required a minor change in the location of the Kasaplar station.{{cn}} |
||
===Construction=== |
|||
The groundbreaking ceremony was held in February 2022.<ref name=groundbreaking /> |
|||
===Funding=== |
===Funding=== |
Revision as of 19:43, 17 February 2022
This article needs to be updated.(January 2021) |
Üçyol–Çamlıkule Line | |
---|---|
Overview | |
Native name | Üçyol–Çamlıkule Hattı |
Status | Construction preparations started |
Owner | İzmir Metropolitan Municipality |
Line number | 2 |
Locale | İzmir, Turkey |
Termini | |
Stations | 11 |
Service | |
Type | Rapid transit |
System | İzmir Metro |
Services | Çamlıkule-Üçyol-Eşrefpaşa-Çamlıkule Tınaztepe-Eşrefpaşa-Üçyol-Tınaztepe (limited service) |
Operator(s) | İzmir Metro A.Ş. |
Depot(s) |
|
Daily ridership | 400000 (expected)[1] |
History | |
Opened | 2026 (expected) |
Technical | |
Line length | 11.3 km (7.0 mi) |
Number of tracks | 2 |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
Minimum radius | 160 metres (520 ft) |
Electrification | 750V DC Third rail, bottom contact |
Operating speed | 100 km/h (62 mph) |
Signalling | Unattended operation with CBTC |
The M2 line, also referred as Üçyol–Çamlıkule Line (Template:Lang-tr) is a planned ATO rapid transit line in İzmir, Turkey.[2][3] The line has a total length of 11.3 km (7.0 mi) and would begin at Üçyol and run southeast into Buca.[3] When completed, the line will become the third driverless metro line in Turkey, after the M5 and M7 lines in Istanbul. Construction is expected to begin at 2021 and the line is expected to enter service in 2024. It will cost $765 million, and the yearly expected profit from operation is $45 million.[1]
History
Background
Buca is the most populous district in Izmir and is one of the city's oldest settlements. Despite this, the only form of public transportation (aside from buses) is the Southern Line of the İZBAN commuter rail system, which runs along the far west side of the district. Prior to 2006, a railway to Buca was in service which provided commuter trains to Basmane and Alsancak stations in central İzmir. The railway was closed down in 2006, due to construction of the Şirinyer Tunnel, thus leaving central Buca without any access to rail transportation.
Plans to construct a metro line to Buca were first announced in 2005, but due to problems with the construction of the Üçyol-Fahrettin Altay extension, these plans were suspended. In 2009, the İzmir Metropolitan Municipality released a master plan for public transportation in the city. Included in this plan was a tram line from Şirinyer to central Buca.[4] However, the Buca tram line was removed from the plan due to pressure from the Ministry of Transport.[5]
Planning
Once the Fahrettin Altay extension of the existing metro line was completed in 2014, the city shifted its focus to the Buca metro. The line was originally planned to consist of seven stations and terminate at Buca Koop., one station before Çamlıkule. The plans were handed to the Ministry of Transport for evaluation in August 2015.[6] The evaluation process took 12 months and was modified to extend the line from Buca Koop. to Çamlıkule as well as redesign the western end of the line as a loop.[3] West of General Asım Gündüz station, the line would split and form a loop with Üçyol placed at the top. The northeastern part of the loop would consist of a station at Zafertepe, while the southwestern part would consist of a station at Bozyaka. The two sections would meet at Üçyol.[3] A new maintenance facility in Tınaztepe was also included. The plan was finalized by the İzmir Municipality and submitted for an Environmental impact assessment in July 2017.[7][8] Construction is expected to begin in 2022 and completed by 2026. Due to a contest notice filed by the 9th September University, the maintenance facility location changed to Adatepe. This also required a minor change in the location of the Kasaplar station.[citation needed]
Construction
The groundbreaking ceremony was held in February 2022.[1]
Funding
The European Bank for Reconstruction and Development agreed to a loan of €754.5 million in January 2020 to fund the line's construction.[9]
The construction tender will take place on 14 January 2021 and the construction will continue for four years.[10][11][12][13] The metro line will consist of 11 stations and will be 13,5 km long. All of the metro route will be constructed with deep tunnel.[14]
Stations
The line will consist of eleven stations, of which ten are new and one (Üçyol) will connect to the existing line. The list of stations are as follows:
- Üçyol
- Zafertepe
- Bozyaka
- General Asım Gündüz
- Şirinyer
- Buca Belediye
- Kasaplar Meydanı
- Hasanağa Parkı
- D.E.Ü. Tınaztepe Kampüsü
- Buca Koop.
- Çamlıkule
References
- ^ a b c "Başkan Soyer: "Ekonomik krizin tam ortasında İzmir tarihinin en büyük yatırımını başlatıyoruz"". İzmir Büyükşehir Belediyesi (in Turkish). 2022-02-14. Retrieved 2022-02-17.
- ^ "Buca Metrosu". buca.bel.tr (in Turkish). Retrieved 25 December 2017.
- ^ a b c d "Üçyol-Buca Metrosu Çamlıkule'ye uzadı - son yenilikler, ne zaman başlıyor?". izmirlininsesi (in Turkish). 3 August 2016. Retrieved 25 December 2017.
- ^ "İzmir'e 28 km tramvay hattı". milliyet.com.tr (in Turkish). 28 May 2010. Retrieved 25 December 2017.
- ^ "Tramvay Geliyor". izmirmetro.com (in Turkish). Retrieved 6 November 2017.
- ^ "Buca Metrosu için ilk ihale yapıldı". izmir.bel.tr (in Turkish). 17 August 2015. Retrieved 25 December 2017.
- ^ "Üçyol- Buca Metrosu'nun yapımına 2018'de başlanacak". ensonhaber.com (in Turkish). 13 July 2017. Retrieved 25 December 2017.
- ^ "Dosya kabul edildi! Üçyol-Buca metrosu için bir adım daha!". egedensonsoz.com (in Turkish). 11 July 2017. Retrieved 25 December 2017.
- ^ "EBRD finances Izmir metro civil works". Railway Gazette International. 16 January 2020. Retrieved 31 March 2020.
- ^ "Izmir Light Rail System – Ucyol – Buca (Izmir Metro project III)". www.ebrd.com.
- ^ "Üçyol - Buca Metrosu için 80 milyon avroluk imza atıldı" (in Turkish). İzmir Büyükşehir Belediyesi. 11 December 2019. Archived from the original on 29 December 2019. Retrieved 29 December 2019.
- ^ "Tunç Soyer: Hepsinin hesabını tek tek soracağız" (in Turkish). Tele1. 27 December 2019. Archived from the original on 29 December 2019. Retrieved 29 December 2019.
- ^ "Stratejik Plan 2020-2024" (PDF) (in Turkish). İzmir Büyükşehir Belediyesi. Archived (PDF) from the original on 17 July 2020. Retrieved 17 July 2020.
- ^ "Buca Metrosu yola çıktı" (in Turkish). İzmir Büyükşehir Belediyesi. 29 December 2017. Archived from the original on 19 January 2018. Retrieved 19 January 2018.