Line 28 (Beijing Subway): Difference between revisions
No edit summary |
Daeebachoo (talk | contribs) No edit summary |
||
Line 38: | Line 38: | ||
'''Line 28''' of the [[Beijing Subway]] ({{zh|s=北京地铁28号线|p=běijīng dìtiě èrshíbā hàoxiàn}}) is a planned [[rapid transit]] line in [[Beijing]]. It was formerly known as '''CBD line'''. |
'''Line 28''' of the [[Beijing Subway]] ({{zh|s=北京地铁28号线|p=běijīng dìtiě èrshíbā hàoxiàn}}) is a planned [[rapid transit]] line in [[Beijing]]. It was formerly known as '''CBD line'''. |
||
Construction started on July 2021.<ref>{{cite web|url=http://beijing.qianlong.com/2021/0727/6077487.shtml|date=2021-07-27|title=北京地铁28号线首站启动建设}}</ref> It is planned to open in 2025. |
|||
Construction was expected to start in 2019 and complete in 2022.<ref name=newspaper /> |
|||
==Rolling stock== |
|||
It will use 6-car Type L<sub>B</sub> [[linear motor]] rolling stock, similar to the [[Capital Airport Express]] of Beijing Subway, and [[Guangzhou Metro]]'s [[Line 4 (Guangzhou Metro)|Line 4]], [[Line 5 (Guangzhou Metro)|Line 5]] and [[Line 6 (Guangzhou Metro)|Line 6]].<ref name=newspaper>http://bj.people.com.cn/n2/2018/1201/c82840-32355186.html</ref> |
It will use 6-car Type L<sub>B</sub> [[linear motor]] rolling stock, similar to the [[Capital Airport Express]] of Beijing Subway, and [[Guangzhou Metro]]'s [[Line 4 (Guangzhou Metro)|Line 4]], [[Line 5 (Guangzhou Metro)|Line 5]] and [[Line 6 (Guangzhou Metro)|Line 6]].<ref name=newspaper>http://bj.people.com.cn/n2/2018/1201/c82840-32355186.html</ref> |
||
Revision as of 22:13, 26 July 2021
Line 28 | |
---|---|
28 | |
Overview | |
Other name(s) | M28 (planned name) CBD line |
Status | Planned[1] |
Locale | Chaoyang district Beijing |
Termini | |
Stations | 9 |
Service | |
Type | Rapid Transit |
System | Beijing Subway |
Rolling stock | 6-car Type LB |
Technical | |
Line length | 8.877 km (Phase 1)[2] |
Character | Underground |
Operating speed | 80 km/h[2] |
Line 28 of the Beijing Subway (Chinese: 北京地铁28号线; pinyin: běijīng dìtiě èrshíbā hàoxiàn) is a planned rapid transit line in Beijing. It was formerly known as CBD line.
Construction started on July 2021.[3] It is planned to open in 2025.
Rolling stock
It will use 6-car Type LB linear motor rolling stock, similar to the Capital Airport Express of Beijing Subway, and Guangzhou Metro's Line 4, Line 5 and Line 6.[1]
List of Stations
Station Name[2] | Connections | Distance km |
Location | ||
---|---|---|---|---|---|
English | Chinese | ||||
Template:BJS stations | 东大桥 | 6 17 Pinggu | Chaoyang | ||
Template:BJS stations (Jintaixizhao) | 京广桥 (金台夕照) | 10 Pinggu | |||
Template:BJS stations | 光华路 | ||||
Template:BJS stations | 核心区 | ||||
Template:BJS stations | 大望路 | 1 14 | |||
Template:BJS stations | 北京东站 | Bcr Sub-Central BOP | |||
Template:BJS stations | 大郊亭 | 7 | |||
Template:BJS stations | 广渠路 | ||||
Template:BJS stations | 广渠东路 | ||||
History
In August 2015, planning authorities proposed an underground automatic people mover (APM) line through the Central Business District (CBD).[4]
According to the most recent plan announced in August 2019, the line will run 8.877 km (5.516 mi), have 9 stations from Dongdaqiao to Guangqudonglu.[2] The line is upgraded to a subway line, not an automatic people mover (APM).[citation needed]
A feasibility study for the line was approved in October 2020.[5]
Notes
References
- ^ a b http://bj.people.com.cn/n2/2018/1201/c82840-32355186.html
- ^ a b c d "北京地铁28号线最新车站方案公布:5座车站可以换乘". 2019-08-20.
- ^ "北京地铁28号线首站启动建设". 2021-07-27.
- ^ Cao Zheng (曹政) (13 August 2015). CBD拟通'地下小火车:初步设8站 呈Z形斜穿'. Beijing Daily. Archived from the original on 26 November 2015. Retrieved 12 November 2015.
- ^ www.bjnews.com.cn. "地铁28号线可行性研究报告批复,纳入今年北京市政府重点工程". www.bjnews.com.cn. Retrieved 2020-10-21.