Jump to content

Las Vegas Monorail: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
Vegaswikian (talk | contribs)
mNo edit summary
fix use of bold; move formal name of monorail to first reference; add background on Broadbent; clarifications about Phase 3/new airport
Line 1: Line 1:
[[Image:MonorailAtSahara.JPG|right|thumb|300px|A [[monorail]] train arrives at the [[Sahara (hotel and casino)|Sahara]] Station on a [[Spring]] evening in [[Las Vegas, Nevada|Las Vegas]].]]
[[Image:MonorailAtSahara.JPG|right|thumb|300px|A [[monorail]] train arrives at the [[Sahara (hotel and casino)|Sahara]] Station on a [[Spring]] evening in [[Las Vegas, Nevada|Las Vegas]].]]


The '''Las Vegas Monorail''' is a [[Transit (transportation)|mass transit]] system located in [[Las Vegas, Nevada]], running alongside the [[Las Vegas Strip]].
The '''Robert N. Broadbent Las Vegas Monorail''' is a [[Transit (transportation)|mass transit]] system located in [[Las Vegas, Nevada]], running alongside the [[Las Vegas Strip]].


== Overview ==
== Overview ==


The '''Las Vegas Monorail''' operates from 7:00 AM until 2:00 AM daily. A person can ride the system from end to end in as little as 14 minutes. A single ride costs $3.00 one-way or $5.50 round-trip. A 24 hour unlimited travel pass can be purchased for $10.00, and a 3 day unlimited travel pass can be purchased for $25.00. Tourists who are planning a trip to Las Vegas may [http://lvmonorail.com/ride_01_gettickets.php purchase tickets in advance.] Tickets may also be purchased from automated kiosks located inside the train stations. A map of the system can be found at the [http://www.lvmonorail.com/ Official Monorail Home Page.]
The Las Vegas Monorail operates from 7:00 a.m. until 2:00 a.m. daily. A person can ride the system from end to end in as little as 14 minutes. A single ride costs [[$]]3.00 one-way or $5.50 round-trip. A 24-hour unlimited travel pass can be purchased for $10.00, and a three-day unlimited travel pass can be purchased for $25.00. Tourists who are planning a trip to Las Vegas may [http://lvmonorail.com/ride_01_gettickets.php purchase tickets in advance.] Tickets may also be purchased from automated kiosks located inside the train stations. A map of the system can be found at the [http://www.lvmonorail.com/ Official Monorail Home Page.]

It is named for [[Robert N. Broadbent]], who Las Vegas officials credit with gaining the support from the public and officials needed to bring the monorail to fruition. Broadbent, a former [[Boulder City, Nevada|Boulder City]] mayor, [[Clark County, Nevada|Clark County]] commissioner, assistant secretary of the [[United States Department of the Interior|interior]], and [[McCarran International Airport]] director, died in [[2003]], a few months before the system's scheduled opening.


== Background ==
== Background ==


After many delays, the '''Robert N. Broadbent Las Vegas Monorail''' opened on [[July 15]], [[2004]]. It begins at the [[MGM Grand Las Vegas|MGM Grand]] near the south end of the Strip, and then runs roughly parallel to the Strip on its eastern side. The [[monorail]] passes next to the [[Las Vegas Hilton]] and the [[Las Vegas Convention Center|Convention Center]], both with stations, before ending at the [[Sahara (hotel and casino)|Sahara]] at the north end of the Strip. The ride takes about 14 minutes to travel its total distance of 3.9 [[mile]]s (about 6.3 [[kilometre|kilometer]]s).
After many delays, the Las Vegas Monorail opened on [[July 15]], [[2004]]. It begins at the [[MGM Grand Las Vegas|MGM Grand]] near the south end of the Strip, and then runs roughly parallel to the Strip on its eastern side. The [[monorail]] passes next to the [[Las Vegas Hilton]] and the [[Las Vegas Convention Center|Convention Center]], both with stations, before ending at the [[Sahara (hotel and casino)|Sahara]] at the north end of the Strip. The ride takes about 14 minutes to travel its total distance of 3.9 [[mile|mi]] (about 6.3 [[kilometre|km]]).


During testing and commissioning, the monorail suffered several malfunctions that delayed the start of passenger service for almost a year. The most severe of these problems was dropping parts on the ground under the tracks.
During testing and commissioning, the monorail suffered several malfunctions that delayed the start of passenger service for almost a year. The most severe of these problems was dropping parts on the ground under the tracks.


On [[September 8]], [[2004]] more problems with falling parts led to the closing of the monorail for nearly four months until it reopened on December 24, 2004. A number of repairs were made to the monorail cars during this shutdown. Each time the monorail system requires major engineering changes it must undergo a lengthy "commissioning" process to confirm the effectiveness and safety of the repairs. The local press reported that each day the monorail was shutdown cost the system approximately $85,000, and that over $8.3 million dollars was lost as a result of this one shutdown.
On [[September 8]], [[2004]] more problems with falling parts led to the closing of the monorail for nearly four months until it reopened on [[December 24]], 2004. A number of repairs were made to the monorail cars during this shutdown. Each time the monorail system requires major engineering changes it must undergo a lengthy "commissioning" process to confirm the effectiveness and safety of the repairs. The local press reported that each day the monorail was shutdown cost the system approximately $85,000, and that over $8.3 million dollars was lost as a result of this one shutdown.


On February 2, 2005, the monorail system had to be shut down again due to problems with the electrical system. Reportedly, a short circuit required replacement of a 30 foot section of the power rail. The system reopened about 12 hours later.
On [[February 2]], 2005, the monorail system had to be shut down again due to problems with the electrical system. Reportedly, a short circuit required replacement of a 30 [[foot (unit of length)|ft]] (9.14 [[meter|m]]) section of the power rail. The system reopened about 12 hours later.


A 2.3 mile (3.7 kilometer) extension to Fremont Street and downtown Las Vegas is planned. It was planned to begin construction in [[2005]] with service beginning in [[2008]]. However, the anticipated federal funding was not allocated in 2004, so the plans have been put on hold for at least a year.
A 2.3 mi (3.7 km) extension to Fremont Street and downtown Las Vegas is planned. It was planned to begin construction in [[2005]] with service beginning in [[2008]]. However, the anticipated federal funding was not allocated in 2004, so the plans have been put on hold for at least a year.


== Extensions ==
== Extensions ==
Line 23: Line 25:
[[Image:LasVegasMonorail.2.jpg|right|thumb|300px|The Las Vegas Monorail over Paradise Rd]]
[[Image:LasVegasMonorail.2.jpg|right|thumb|300px|The Las Vegas Monorail over Paradise Rd]]


[[List of Las Vegas monorail stations|Phase 1]] of the monorail system is now complete. During the second phase of construction, the system is to be extended from the Sahara station into Downtown Las Vegas. Phase 2 is to include a new station at [[Stratosphere Las Vegas|The Stratosphere Hotel]], as well as stops Charleston, Bonneville, and Fremont Streets. Construction was to already have begun on phase 2, but was postponed in light of the technical problems. On [[January 27]], [[2005]], it was announced that the government will not provide money for the $400 million project. The original plan for the Monorail called for the system to have opened in January 2004, and have been able to cover its debts and operating expenses by attracting 19-20 million riders. Since the system was not only delayed in opening, but later shut down for 4 months, income was not as great as organizers had hoped. This reportedly is a contributing factor for the government's denial of phase 2 funding.
[[List of Las Vegas monorail stations|Phase 1]] of the monorail system is now complete. During the second phase of construction, the system is to be extended from the Sahara station into Downtown Las Vegas. Phase 2 is to include a new station at [[Stratosphere Las Vegas|The Stratosphere Hotel]], as well as stops Charleston, Bonneville, and Fremont Streets. Construction was to already have begun on phase 2, but was postponed in light of the technical problems. On [[January 27]], [[2005]], it was announced that the government will not provide money for the $400 million project. The original plan for the Monorail called for the system to have opened in January 2004, and have been able to cover its debts and operating expenses by attracting 19 million–20 million riders. Since the system was not only delayed in opening, but later shut down for 4 months, income was not as great as organizers had hoped. This reportedly is a contributing factor for the government's denial of phase 2 funding.


It is unclear if Phase 2 will ever become reality. The [[Associated Press]] reported that Cam Walker, head of [[Transit Systems Management]] the non-profit corporation which is charged with operating the monorail, said his company had no immediate plans to extend the monorail in any direction. The [[Associated Press|AP]] also reported that Las Vegas Mayor [[Oscar Goodman]] has been looking at cheaper, alternative funding for a [[light rail]] system or high tech busses.
It is unclear if Phase 2 will ever become reality. The [[Associated Press]] reported that Cam Walker, head of [[Transit Systems Management]] the non-profit corporation which is charged with operating the monorail, said his company had no immediate plans to extend the monorail in any direction. The [[Associated Press|AP]] also reported that Las Vegas Mayor [[Oscar Goodman]] has been looking at cheaper, alternative funding for a [[light rail]] system or high tech busses.
Line 29: Line 31:
Transit Systems Management officials have stated that the system is now in good running order and have cited, as proof of this, the good handling of crowds during the famous [[Consumer Electronics Show]] in January of 2005.
Transit Systems Management officials have stated that the system is now in good running order and have cited, as proof of this, the good handling of crowds during the famous [[Consumer Electronics Show]] in January of 2005.


Previously, a Phase 3 had been discussed, which would have extended the Monorail system south from the MGM Grand Station into [[McCarran International Airport]]. This is now unlikely since another airport is being considered, 20 or 30 km away from the main downtown core and from the "[[Las Vegas Strip|strip]]" where the monorail runs.
A Phase 3 has been discussed to extended the Monorail system south from the MGM Grand Station to [[McCarran International Airport]]. However, with planning under way to build a new airport in the Ivanpah Valley, 30 mi (48 km) south of McCarren and away from The [[Las Vegas Strip|Strip]] where the monorail runs, the likelihood of building Phase 3 to McCarren is uncertain.


[[Image:LasVegasMonorail.1.jpg|left|thumb|300px|The Las Vegas Monorail pulling into the [[Las Vegas Convention Center]] [http://www.lvmonorail.com/ride_04_stat_conv.html] Station]]
[[Image:LasVegasMonorail.1.jpg|left|thumb|300px|The Las Vegas Monorail pulling into the [[Las Vegas Convention Center]] [http://www.lvmonorail.com/ride_04_stat_conv.html] Station]]
Line 35: Line 37:
== Construction and planning==
== Construction and planning==


The monorail track was built by the [[Granite corporation]] of California, one of the largest civil contractors in the United States.
The monorail track was built by the [[Granite corporation]] of California, one of the largest civil contractors in the United States.
The Las Vegas Monorail vehicles and signals systems were developed by the [[Bombardier]] corporation, which has been blamed for problems with the system. Bombardier also constructed the famous monorail system at [[Walt Disney World]], as well as many other transit systems around the world. The company may be subject to litigation and liability for losses of income due to monorail malfuctions, though the legal responsibility lies entirely with the Transit Systems Management corporation, which inspected and accepted all the rolling equipment and the infrastructures.


The Las Vegas Monorail vehicles and signals systems were developed by [[Bombardier]] Corp., which has been blamed for problems with the system. Bombardier also constructed the famous monorail system at [[Walt Disney World]], as well as many other transit systems around the world. The company may be subject to litigation and liability for losses of income due to monorail malfuctions, though the legal responsibility lies entirely with the Transit Systems Management corporation, which inspected and accepted all the rolling equipment and the infrastructures.
The technology for the monorail vehicles came directly from the well tested and safe monorail train systems running in Walt Disney World. Having an independent non-profit corporation in charge of financing, maintaining and running the entire system was a relatively new idea with very few precedents. From the start extremely high standards and great financial demands were set for what was a new, unproven management "creature" in the transit domain. The pressure to perform without losing a cent was great. It was expected that in addition to covering operating expenses and service of the debt, there would be surplus revenue which would be invested in expansion of the system. While still in the project stage Las Vegas officials were warned by experts in mass transit that no major urban transportation system in the United States operates in the black: They all run with a deficit. As reported in the [[Washington Post]] a spokesperson for the biggest association of transit utilities in the United States noted that [[New York City Transit Authority|New York city's subway system]] recovers only 67% of its costs (through fares and advertising revenue) and it is the best performer in that respect.


The technology for the monorail vehicles came directly from the well tested and safe monorail train systems running in Walt Disney World. Having an independent non-profit corporation in charge of financing, maintaining and running the entire system was a relatively new idea with very few precedents. From the start extremely high standards and great financial demands were set for what was a new, unproven management "creature" in the transit domain. The pressure to perform without losing a [[Cent (currency)|cent]] was great. It was expected that in addition to covering operating expenses and service of the debt, there would be surplus revenue which would be invested in expansion of the system. While still in the project stage Las Vegas officials were warned by experts in mass transit that no major urban transportation system in the United States operates in the black: They all run with a deficit. As reported in the [[Washington Post]] a spokesperson for the biggest association of transit utilities in the United States noted that [[New York City Transit Authority|New York city's subway system]] recovers only 67% of its costs (through fares and advertising revenue) and it is the best performer in that respect.
== See also ==


== See also ==
* [[List of Las Vegas monorail stations]]
* [[List of Las Vegas monorail stations]]


Line 56: Line 58:
[[Category:Rail transport]]
[[Category:Rail transport]]
[[Category:Public transport]]
[[Category:Public transport]]
[[Category:Monorails]]

Revision as of 12:15, 14 April 2005

A monorail train arrives at the Sahara Station on a Spring evening in Las Vegas.

The Robert N. Broadbent Las Vegas Monorail is a mass transit system located in Las Vegas, Nevada, running alongside the Las Vegas Strip.

Overview

The Las Vegas Monorail operates from 7:00 a.m. until 2:00 a.m. daily. A person can ride the system from end to end in as little as 14 minutes. A single ride costs $3.00 one-way or $5.50 round-trip. A 24-hour unlimited travel pass can be purchased for $10.00, and a three-day unlimited travel pass can be purchased for $25.00. Tourists who are planning a trip to Las Vegas may purchase tickets in advance. Tickets may also be purchased from automated kiosks located inside the train stations. A map of the system can be found at the Official Monorail Home Page.

It is named for Robert N. Broadbent, who Las Vegas officials credit with gaining the support from the public and officials needed to bring the monorail to fruition. Broadbent, a former Boulder City mayor, Clark County commissioner, assistant secretary of the interior, and McCarran International Airport director, died in 2003, a few months before the system's scheduled opening.

Background

After many delays, the Las Vegas Monorail opened on July 15, 2004. It begins at the MGM Grand near the south end of the Strip, and then runs roughly parallel to the Strip on its eastern side. The monorail passes next to the Las Vegas Hilton and the Convention Center, both with stations, before ending at the Sahara at the north end of the Strip. The ride takes about 14 minutes to travel its total distance of 3.9 mi (about 6.3 km).

During testing and commissioning, the monorail suffered several malfunctions that delayed the start of passenger service for almost a year. The most severe of these problems was dropping parts on the ground under the tracks.

On September 8, 2004 more problems with falling parts led to the closing of the monorail for nearly four months until it reopened on December 24, 2004. A number of repairs were made to the monorail cars during this shutdown. Each time the monorail system requires major engineering changes it must undergo a lengthy "commissioning" process to confirm the effectiveness and safety of the repairs. The local press reported that each day the monorail was shutdown cost the system approximately $85,000, and that over $8.3 million dollars was lost as a result of this one shutdown.

On February 2, 2005, the monorail system had to be shut down again due to problems with the electrical system. Reportedly, a short circuit required replacement of a 30 ft (9.14 m) section of the power rail. The system reopened about 12 hours later.

A 2.3 mi (3.7 km) extension to Fremont Street and downtown Las Vegas is planned. It was planned to begin construction in 2005 with service beginning in 2008. However, the anticipated federal funding was not allocated in 2004, so the plans have been put on hold for at least a year.

Extensions

The Las Vegas Monorail over Paradise Rd

Phase 1 of the monorail system is now complete. During the second phase of construction, the system is to be extended from the Sahara station into Downtown Las Vegas. Phase 2 is to include a new station at The Stratosphere Hotel, as well as stops Charleston, Bonneville, and Fremont Streets. Construction was to already have begun on phase 2, but was postponed in light of the technical problems. On January 27, 2005, it was announced that the government will not provide money for the $400 million project. The original plan for the Monorail called for the system to have opened in January 2004, and have been able to cover its debts and operating expenses by attracting 19 million–20 million riders. Since the system was not only delayed in opening, but later shut down for 4 months, income was not as great as organizers had hoped. This reportedly is a contributing factor for the government's denial of phase 2 funding.

It is unclear if Phase 2 will ever become reality. The Associated Press reported that Cam Walker, head of Transit Systems Management the non-profit corporation which is charged with operating the monorail, said his company had no immediate plans to extend the monorail in any direction. The AP also reported that Las Vegas Mayor Oscar Goodman has been looking at cheaper, alternative funding for a light rail system or high tech busses.

Transit Systems Management officials have stated that the system is now in good running order and have cited, as proof of this, the good handling of crowds during the famous Consumer Electronics Show in January of 2005.

A Phase 3 has been discussed to extended the Monorail system south from the MGM Grand Station to McCarran International Airport. However, with planning under way to build a new airport in the Ivanpah Valley, 30 mi (48 km) south of McCarren and away from The Strip where the monorail runs, the likelihood of building Phase 3 to McCarren is uncertain.

File:LasVegasMonorail.1.jpg
The Las Vegas Monorail pulling into the Las Vegas Convention Center [1] Station

Construction and planning

The monorail track was built by the Granite corporation of California, one of the largest civil contractors in the United States.

The Las Vegas Monorail vehicles and signals systems were developed by Bombardier Corp., which has been blamed for problems with the system. Bombardier also constructed the famous monorail system at Walt Disney World, as well as many other transit systems around the world. The company may be subject to litigation and liability for losses of income due to monorail malfuctions, though the legal responsibility lies entirely with the Transit Systems Management corporation, which inspected and accepted all the rolling equipment and the infrastructures.

The technology for the monorail vehicles came directly from the well tested and safe monorail train systems running in Walt Disney World. Having an independent non-profit corporation in charge of financing, maintaining and running the entire system was a relatively new idea with very few precedents. From the start extremely high standards and great financial demands were set for what was a new, unproven management "creature" in the transit domain. The pressure to perform without losing a cent was great. It was expected that in addition to covering operating expenses and service of the debt, there would be surplus revenue which would be invested in expansion of the system. While still in the project stage Las Vegas officials were warned by experts in mass transit that no major urban transportation system in the United States operates in the black: They all run with a deficit. As reported in the Washington Post a spokesperson for the biggest association of transit utilities in the United States noted that New York city's subway system recovers only 67% of its costs (through fares and advertising revenue) and it is the best performer in that respect.

See also