Jump to content

Redcliffe Peninsula railway line: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
mNo edit summary
AnomieBOT (talk | contribs)
m Dating maintenance tags: {{Cn}}
 
(43 intermediate revisions by 28 users not shown)
Line 1: Line 1:
{{Short description|Railway line in Australia}}
{{Use dmy dates|date=November 2012}}
{{Use dmy dates|date=December 2019}}
{{Use Australian English|date=January 2012}}
{{Use Australian English|date=January 2012}}
{{Infobox rail line
{{Infobox rail line
|box_width = 22em
|box_width = 22em
|name = Redcliffe Peninsula line
|name = Redcliffe Peninsula line
|color = 08E8DE
|color = 1578BE
|logo =
|logo =
|logo_width =
|logo_width =
Line 13: Line 14:
|caption =
|caption =
|type = Commuter Rail
|type = Commuter Rail
|system =
|system =
|status = Open
|status = Open
|locale = [[Murrumba Downs, Queensland|Murrumba Downs]], [[Queensland]], [[Australia]]
|locale = [[Murrumba Downs, Queensland|Murrumba Downs]], [[Queensland]], [[Australia]]
Line 19: Line 20:
|end = Kippa Ring Station
|end = Kippa Ring Station
|stations = 6
|stations = 6
|routes =
|routes =
|daily_ridership =
|daily_ridership =
|planopen =
|planopen =
|open = 4 October 2016
|open = 4 October 2016
|close =
|close =
|owner = [[Department of Transport and Main Roads]] (will be transferred to [[Queensland Rail]] in 2019)<ref>{{cite publication|url=https://budget.qld.gov.au/files/BP2-2018-19.pdf|title=Budget Strategy and Outlook Budget Paper No.2|page=122|publisher=Queensland Government|year=2018}}</ref>
|owner = [[Queensland Rail]] <small>(from 2019)</small><ref name="Budget2018">{{cite book|url=https://budget.qld.gov.au/files/BP2-2018-19.pdf|title=Budget Strategy and Outlook Budget Paper No.2|page=122|publisher=Queensland Government|year=2018|access-date=12 June 2018|archive-url=https://web.archive.org/web/20180612162213/https://budget.qld.gov.au/files/BP2-2018-19.pdf|archive-date=12 June 2018|url-status=live}}</ref>
|operator = [[Queensland Rail]]
|operator = [[Queensland Rail]]
|character =
|character =
Line 36: Line 37:
|racksystem =
|racksystem =
|routenumber =
|routenumber =
|mapcolour =
|mapcolour = Light Blue
|electrification =
|electrification = 2016
|speed = {{convert|100|km/h|mph|abbr=on}}
|speed = {{convert|100|km/h|mph|abbr=on}}
|elevation =
|elevation =
Line 46: Line 47:
[[File:15-03-24 Moreton Bay Rail - Kippa Ring Station under construction.JPG|thumb|Kippa Ring Station under construction, project sign]]
[[File:15-03-24 Moreton Bay Rail - Kippa Ring Station under construction.JPG|thumb|Kippa Ring Station under construction, project sign]]


The '''Redcliffe Peninsula line''' is a 12&nbsp;km stretch of [[Rail profile#Australia|heavy gauge]] [[Double-track railway|dual-track]] railway between [[Petrie, Queensland|Petrie]] and [[Kippa-Ring, Queensland|Kippa-Ring]] on the [[Redcliffe City, Queensland|Redcliffe peninsula]].<ref name="TMR1">{{cite web|title=Moreton Bay Rail Link (Department of Transport and Main Roads)|work=|publisher=Queensland Government|date=15 November 2010|url=http://www.tmr.qld.gov.au/moretonbayrail|format=|accessdate=24 November 2010}}</ref> The new line is part of the [[Queensland Rail|QR]] [[Citytrain]] suburban network, branching from the [[Caboolture railway line|Caboolture line]]. It starts 200 metres north of [[Petrie railway station]], extending from ({{convert|27.5|km|mi|abbr=on}} to {{convert|40.1|km|mi|abbr=on}} north of [[Central railway station, Brisbane|Central railway station]]).
The '''Redcliffe Peninsula line''' is a {{Cvt|12|km}} stretch of [[Rail profile#Australia|heavy gauge]] [[Double-track railway|dual-track]] railway between [[Petrie, Queensland|Petrie]] and [[Kippa-Ring, Queensland|Kippa-Ring]] on the [[Redcliffe City, Queensland|Redcliffe peninsula]] in [[Queensland]], Australia.<ref name="TMR1">{{cite web|title=Moreton Bay Rail Link (Department of Transport and Main Roads)|publisher=Queensland Government|date=15 November 2010|url=http://www.tmr.qld.gov.au/moretonbayrail|archive-url=https://web.archive.org/web/20110220215928/http://www.tmr.qld.gov.au/moretonbayrail|url-status=dead|archive-date=20 February 2011|access-date=24 November 2010}}</ref> The new line is part of [[Queensland Rail]]'s [[City network|City suburban]] network, branching from the [[North Coast railway line, Queensland|North Coast line]]. It starts {{Convert|200|m||0}} north of [[Petrie railway station]], extending from ({{convert|27.5|km|mi|abbr=on}} to {{convert|40.1|km|mi|abbr=on}} north of [[Central railway station, Brisbane|Central railway station]]).


The line has six stations: [[Kallangur railway station|Kallangur]], [[Murrumba Downs railway station|Murrumba Downs]], [[Mango Hill railway station|Mango Hill]], [[Mango Hill East railway station|Mango Hill East]] (previously called Kinsellas Road), [[Rothwell railway station|Rothwell]] and [[Kippa-Ring railway station|Kippa-Ring]]. Funding for the project consisted of $742 million from the [[Government of Australia|Commonwealth Government]], $300 million from the [[Queensland Government]] (plus another $120 million for land) and $105 million from the [[Moreton Bay Regional Council]].<ref name="TMR1"/>
The line has six stations: [[Kallangur railway station|Kallangur]], [[Murrumba Downs railway station|Murrumba Downs]], [[Mango Hill railway station|Mango Hill]], [[Mango Hill East railway station|Mango Hill East]] (previously called Kinsellas Road), [[Rothwell railway station|Rothwell]] and [[Kippa-Ring railway station|Kippa-Ring]]. Funding for the project consisted of $742 million from the [[Government of Australia|Commonwealth Government]], $300 million from the [[Queensland Government]] (plus another $120 million for land) and $105 million from the [[Moreton Bay Regional Council]].<ref name="TMR1"/>


The line was officially opened on 3 October 2016, about 130 years after it was first proposed.<ref>{{cite news|last1=Schwarten|first1=Evan|title=Brisbane rail link opens 130 years late|url=http://www.news.com.au/national/breaking-news/turnbull-opens-12b-brisbane-rail-link/news-story/a886ec93107210907ef80ed279035ecc|accessdate=5 October 2016|work=News.com.au|agency=Australian Associated Press|publisher=News Corp Australia}}</ref> The first train to depart from Kippa-Ring was [[Suburban Multiple Unit (Queensland Rail)#260 series|SMU]] 285 and 295, with the Prime Minister, Queensland Premier and the first train ballot winners on board.
The line was officially opened on 3 October 2016, about 130 years after it was first proposed.<ref>{{cite news|last1=Schwarten|first1=Evan|title=Brisbane rail link opens 130 years late|url=http://www.news.com.au/national/breaking-news/turnbull-opens-12b-brisbane-rail-link/news-story/a886ec93107210907ef80ed279035ecc|access-date=5 October 2016|work=News.com.au|agency=Australian Associated Press|publisher=News Corp Australia|archive-url=https://web.archive.org/web/20161004152811/http://www.news.com.au/national/breaking-news/turnbull-opens-12b-brisbane-rail-link/news-story/a886ec93107210907ef80ed279035ecc|archive-date=4 October 2016|url-status=live}}</ref> The first train to depart from Kippa-Ring was [[Suburban Multiple Unit (Queensland Rail)#260 series|SMU]] 285 and 295, with the Prime Minister, Queensland Premier and the first train ballot winners on board.


==Early history==
==Early history==
A rail line to [[Redcliffe, Queensland|Redcliffe]] was first proposed in 1895 when the [[Government of Queensland|Queensland Government]]'s Minister for Railways, the Hon. [[Robert Philp]], considered three proposals, preferring a route via North Pine ([[Petrie, Queensland|Petrie]]).<ref>{{cite news | title = (Unknown title) | publisher = ''The Telegraph'' | date = 8 May 1895 | url = http://backontrack.org/mbs/index.php?topic=7.msg3209#msg3209 | accessdate = 19 January 2009 }}</ref> In more recent times, the route for a Redcliffe railway was identified in the 1970s, and the required land was purchased and preserved as a transport corridor by the state government in the 1980s.<ref name="PTKPTCS-FIASR">{{cite journal | author = GHD Pty Ltd | authorlink = GHD Group | title = Petrie to Kippa-Ring Public Transport Corridor Study – Final Impact Assessment Study Report | publisher = Queensland Transport | date = October 2003 | url = http://www.translink.com.au/qt/translin.nsf/ReferenceLookup/PKRPTCS_ExecutiveSummary.pdf/$file/PKRPTCS_ExecutiveSummary.pdf | format = [[PDF]] | accessdate = 20 January 2009 | deadurl = yes | archiveurl = https://web.archive.org/web/20081120105018/http://www.translink.com.au/qt/translin.nsf/ReferenceLookup/PKRPTCS_ExecutiveSummary.pdf/$file/PKRPTCS_ExecutiveSummary.pdf | archivedate = 20 November 2008 | df = dmy-all }} </ref> The issue of the proposed railway line seemed to be a recurrent theme during state elections, leading to scepticism the line would ever be constructed.
A rail line to [[Redcliffe, Queensland|Redcliffe]] was first proposed in 1895 when the [[Government of Queensland|Queensland Government]]'s Minister for Railways, the Hon. [[Robert Philp]], considered three proposals, preferring a route via North Pine ([[Petrie, Queensland|Petrie]]).<ref>
{{cite news |url=http://nla.gov.au/nla.news-article172662216 |title=Railway to Redcliffe. |newspaper=[[The Telegraph (Brisbane)]] |issue=7,037 |location=Queensland, Australia |date=8 May 1895 |access-date=15 September 2020 |page=5 |via=National Library of Australia}}
</ref> In more recent times, the route for a Redcliffe railway was identified in the 1970s, and the required land was purchased and preserved as a transport corridor by the state government in the 1980s.<ref name="PTKPTCS-FIASR">{{cite journal | author = GHD Pty Ltd | author-link = GHD Group | title = Petrie to Kippa-Ring Public Transport Corridor Study – Final Impact Assessment Study Report | publisher = Queensland Transport | date = October 2003 | url = http://www.translink.com.au/qt/translin.nsf/ReferenceLookup/PKRPTCS_ExecutiveSummary.pdf/$file/PKRPTCS_ExecutiveSummary.pdf | access-date = 20 January 2009 | url-status = dead | archive-url = https://web.archive.org/web/20070831100606/http://www.translink.com.au/qt/translin.nsf/ReferenceLookup/PKRPTCS_ExecutiveSummary.pdf/$file/PKRPTCS_ExecutiveSummary.pdf | archive-date = 31 August 2007 | df = dmy-all }}</ref> The issue of the proposed railway line seemed to be a recurrent theme during state elections, leading to scepticism the line would ever be constructed.{{cn|date=April 2024}}


==Petrie to Kippa-Ring Public Transport Corridor Study==
==Petrie to Kippa-Ring Public Transport Corridor Study==
In 1999, the newly elected state government commissioned an investigative study into the transport corridor between [[Petrie, Queensland|Petrie]] to [[Kippa-Ring, Queensland|Kippa-Ring]],<ref>{{cite press release | title = BUDGET BRIEFS | publisher = Government of Queensland | date = 15 September 1999 | url = http://statements.cabinet.qld.gov.au/MMS/StatementDisplaySingle.aspx?id=27277 | accessdate = 20 January 2009 }}</ref> conducted by [[GHD Group]]. Key components under investigation included the mode of transport, the route and location of stations, future public transport usage, and the timing of construction.<ref>{{cite press release | title = Public transport corridor information days to assist residents | publisher = Government of Queensland | date = 24 March 2000 | url = http://statements.cabinet.qld.gov.au/MMS/StatementDisplaySingle.aspx?id=29719 | accessdate = 20 January 2009 }}</ref>
In 1999, the newly elected state government commissioned an investigative study into the transport corridor between [[Petrie, Queensland|Petrie]] to [[Kippa-Ring, Queensland|Kippa-Ring]],<ref>{{cite press release | title = BUDGET BRIEFS | publisher = Government of Queensland | date = 15 September 1999 | url = http://statements.cabinet.qld.gov.au/MMS/StatementDisplaySingle.aspx?id=27277 | access-date = 20 January 2009 | archive-url = https://web.archive.org/web/20110610035628/http://statements.cabinet.qld.gov.au/MMS/StatementDisplaySingle.aspx?id=27277 | archive-date = 10 June 2011 | url-status = live | df = dmy-all }}</ref> conducted by [[GHD Group]]. Key components under investigation included the mode of transport, the route and location of stations, future public transport usage, and the timing of construction.<ref>{{cite press release | title = Public transport corridor information days to assist residents | publisher = Government of Queensland | date = 24 March 2000 | url = http://statements.cabinet.qld.gov.au/MMS/StatementDisplaySingle.aspx?id=29719 | access-date = 20 January 2009 | archive-url = https://web.archive.org/web/20110610035225/http://statements.cabinet.qld.gov.au/MMS/StatementDisplaySingle.aspx?id=29719 | archive-date = 10 June 2011 | url-status = live | df = dmy-all }}</ref>


The study was conducted in two parts. The first was completed in June 2000. It aimed to meet the state government's obligations to identify or forgo rights to a transport corridor running through the [[North Lakes, Queensland|North Lakes]] residential development. This first stage was to decide on the preferred mode of transport, the viability of public transport along the corridor, and the preferred alignment of the corridor.<ref name="PTKPTCS-FIASR"/> Four modes of transport were investigated: heavy rail, buses or a [[bus rapid transit|busway]], [[light rail]], and [[monorail]]. It was decided that heavy rail was the preferred mode of transport along the existing preserved corridor as it was the only option to give an acceptable level of economic efficiency. The study found that heavy rail had a [[benefit-cost ratio]] of 1.46, and would generate the highest levels of patronage due to its integration into the existing [[Citytrain]] network, requiring no change mode.<ref name="PTKPTCS-FIASR"/>
The study was conducted in two parts. The first was completed in June 2000. It aimed to meet the state government's obligations to identify or forgo rights to a transport corridor running through the [[North Lakes, Queensland|North Lakes]] residential development. This first stage was to decide on the preferred mode of transport, the viability of public transport along the corridor, and the preferred alignment of the corridor.<ref name="PTKPTCS-FIASR"/> Four modes of transport were investigated: heavy rail, buses or a [[bus rapid transit|busway]], [[light rail]], and [[monorail]]. It was decided that heavy rail was the preferred mode of transport along the existing preserved corridor as it was the only option to give an acceptable level of economic efficiency. The study found that heavy rail had a [[benefit-cost ratio]] of 1.46, and would generate the highest levels of patronage due to its integration into the existing [[Citytrain]] network, requiring no change mode.<ref name="PTKPTCS-FIASR"/>


The second part of the study was completed in October 2003. It looked at the route of the corridor between Petrie railway station and Kallangur railway station at Goodfellows Road. The original, preserved route was recommended.<ref name="PTKPTCS-FIASR"/>
The second part of the study was completed in October 2003. It looked at the route of the corridor between Petrie railway station and Kallangur railway station at Goodfellows Road. The original, preserved route was recommended.<ref name="PTKPTCS-FIASR"/>
[[File:Kippa-Ring railway station, Brisbane, Jan 2017.jpg|thumb|Kippa Ring Station]]
On 17 December 2001, the Minister for Transport announced public transport improvements between Petrie and Kippa-Ring, planned as part of a staged development of a new rail line in the area,<ref name="PTKRRC">{{cite press release | title = Petrie to Kippa-Ring Rail Corridor | publisher = Government of Queensland | date = 17 December 2001 | url = http://statements.cabinet.qld.gov.au/MMS/StatementDisplaySingle.aspx?id=11848 | access-date = 20 January 2009 | archive-url = https://web.archive.org/web/20110610035255/http://statements.cabinet.qld.gov.au/MMS/StatementDisplaySingle.aspx?id=11848 | archive-date = 10 June 2011 | url-status = live | df = dmy-all }}</ref> following the release of the recommendations of the draft report of the Petrie to Kippa-Ring Public Transport Corridor Study. The Minister also said that the government was investigating [[public-private partnership|private sector involvement]] in the construction of the project.<ref name="PTKRRC"/> On 11 July 2003, the Minister said that the government had not made a commitment on the proposed line, and that it may not go ahead because interest from the private sector in the project was negligible.<ref name="RMNBAOFPTKR">{{cite press release | title = Rail may not be an option for Petrie to Kippa-Ring | publisher = Government of Queensland | date = 11 July 2003 | url = http://statements.cabinet.qld.gov.au/MMS/StatementDisplaySingle.aspx?id=20672 | access-date = 20 January 2009 | archive-url = https://web.archive.org/web/20110610035445/http://statements.cabinet.qld.gov.au/MMS/StatementDisplaySingle.aspx?id=20672 | archive-date = 10 June 2011 | url-status = live | df = dmy-all }}</ref> This was at a time when similar passenger rail public-private partnerships such as the [[Airtrain (Brisbane)|Airtrain]] to the [[Brisbane Airport]] and [[New Southern railway line|Airport Link]] to [[Sydney Airport]] were faltering.<ref>{{cite news | title = Talks underway over future of private Airtrain operation | publisher = Australian Associated Press | date = 15 June 2002 | url = http://www.highbeam.com/doc/1P1-53656501.html | access-date = 20 January 2009 }}{{dead link|date=February 2019|bot=medic}}{{cbignore|bot=medic}}</ref><ref>{{cite news | last = Bissett | first = Kelvin | title = Fast rail plan for Sydney | newspaper = The Daily Telegraph | date = 18 December 2006 | url = http://www.news.com.au/dailytelegraph/story/0,22049,20943198-5006009,00.html | access-date = 20 January 2009 | archive-url = https://web.archive.org/web/20080517053321/http://www.news.com.au/dailytelegraph/story/0,22049,20943198-5006009,00.html | archive-date = 17 May 2008 | url-status = live | df = dmy-all }}</ref>


In June 2004, [[Queensland Transport]] released the ''Petrie to Kippa-Ring Public Transport Corridor Study's Impact Assessment Study''. It claimed that the Impact Assessment Study only looked at costs of the Petrie to Kippa-Ring corridor, and did not take into account commercial-in-confidence costs involved in operating the trains, integrating the services with the rest of the Citytrain network, higher maintenance costs, and the costs of increasing capacity between the Brisbane central business district and Petrie. Based on these higher costs, Queensland Transport deemed the construction of the railway by 2007 could not be justified. The report also said possible savings from a public-private partnership were small and would not provide value for money. Queensland Transport said that it would preserve the corridor until it was required.<ref>{{cite journal | title = Petrie to Kippa-Ring PublicTransport Corridor Study Independent assessment of IAS Report | publisher = Queensland Transport | date = June 2004 | url = http://www.wheresourrailway.org/qtassessment.pdf | access-date = 20 January 2009 | archive-url = https://web.archive.org/web/20080705185748/http://www.wheresourrailway.org/qtassessment.pdf | archive-date = 5 July 2008 | url-status = dead | df = dmy-all }}</ref> On 15 June 2004 the government announced $3 million for improving existing bus services along the corridor between Kippa-Ring (Redcliffe) and Petrie "in the short to medium term". However, it again announced the continuing preservation of the reserved corridor for future public transport use.<ref>{{cite press release | title = $3M FOR PETRIE TO KIPPA-RING PUBLIC TRANSPORT CORRIDOR | publisher = Government of Queensland | date = 15 June 2004 | url = http://statements.cabinet.qld.gov.au/MMS/StatementDisplaySingle.aspx?id=35845 | access-date = 20 January 2009 | archive-url = https://web.archive.org/web/20110610035609/http://statements.cabinet.qld.gov.au/MMS/StatementDisplaySingle.aspx?id=35845 | archive-date = 10 June 2011 | url-status = live | df = dmy-all }}</ref>
On 17 December 2001, the Minister for Transport announced public transport improvements between Petrie and Kippa-Ring, planned as part of a staged development of a new rail line in the area,<ref name="PTKRRC">{{cite press release | title = Petrie to Kippa-Ring Rail Corridor | publisher = Government of Queensland | date = 17 December 2001 | url = http://statements.cabinet.qld.gov.au/MMS/StatementDisplaySingle.aspx?id=11848 | accessdate = 20 January 2009 }}</ref> following the release of the recommendations of the draft report of the Petrie to Kippa-Ring Public Transport Corridor Study. The Minister also said that the government was investigating [[public-private partnership|private sector involvement]] in the construction of the project.<ref name="PTKRRC"/> On 11 July 2003, the Minister said that the government had not made a commitment on the proposed line, and that it may not go ahead because interest from the private sector in the project was negligible.<ref name="RMNBAOFPTKR">{{cite press release | title = Rail may not be an option for Petrie to Kippa-Ring | publisher = Government of Queensland | date = 11 July 2003 | url = http://statements.cabinet.qld.gov.au/MMS/StatementDisplaySingle.aspx?id=20672 | accessdate = 20 January 2009 }}</ref> This was at a time when similar passenger rail public-private partnerships such as the [[Airtrain (Brisbane)|Airtrain]] to the Brisbane Airport and [[New Southern railway line|Airport Link]] to Sydney Airport were faltering.<ref>{{cite news | title = Talks underway over future of private Airtrain operation | publisher = Australian Associated Press | date = 15 June 2002 | url = http://www.highbeam.com/doc/1P1-53656501.html | accessdate = 20 January 2009 }}</ref><ref>{{cite news | last = Bissett | first = Kelvin | title = Fast rail plan for Sydney | publisher = ''The Daily Telegraph'' | date = 18 December 2006 | url = http://www.news.com.au/dailytelegraph/story/0,22049,20943198-5006009,00.html | accessdate = 20 January 2009 }}</ref>

In June 2004, [[Queensland Transport]] released the ''Petrie to Kippa-Ring Public Transport Corridor Study's Impact Assessment Study''. It claimed that the Impact Assessment Study only looked at costs of the Petrie to Kippa-Ring corridor, and did not take into account commercial-in-confidence costs involved in operating the trains, integrating the services with the rest of the Citytrain network, higher maintenance costs, and the costs of increasing capacity between the Brisbane central business district and Petrie. Based on these higher costs, Queensland Transport deemed the construction of the railway by 2007 could not be justified. The report also said possible savings from a public-private partnership were small and would not provide value for money. Queensland Transport said that it would preserve the corridor until it was required.<ref>{{cite journal | title = Petrie to Kippa-Ring PublicTransport Corridor Study Independent assessment of IAS Report | publisher = Queensland Transport | date = June 2004 | url = http://www.wheresourrailway.org/qtassessment.pdf | format = [[PDF]] | accessdate = 20 January 2009 }}</ref> On 15 June 2004 the government announced $3 million for improving existing bus services along the corridor between Kippa-Ring (Redcliffe) and Petrie "in the short to medium term". However, it again announced the continuing preservation of the reserved corridor for future public transport use.<ref>{{cite press release | title = $3M FOR PETRIE TO KIPPA-RING PUBLIC TRANSPORT CORRIDOR | publisher = Government of Queensland | date = 15 June 2004 | url = http://statements.cabinet.qld.gov.au/MMS/StatementDisplaySingle.aspx?id=35845 | accessdate = 20 January 2009 }}</ref>


==Recent history==
==Recent history==

[[File:2011-02-15 Kippa Ring Station - Kenna Park.jpg|thumb|Site of [[Kippa-Ring railway station]] prior to construction.]]
[[File:2011-02-15 Kippa Ring Station - Kenna Park.jpg|thumb|Site of [[Kippa-Ring railway station]] prior to construction.]]


Frustrated by a lack of action by the Government, the [[City of Redcliffe|Redcliffe City Council]] (now [[Moreton Bay Regional Council]]) unanimously moved on 4 July 2005 to support a campaign to have the Petrie to Kippa-Ring railway built, and to write to the Minister for Transport to express concern over the decision to not proceed with its construction.<ref>{{cite web | title = MINUTES OF GENERAL PURPOSES COMMITTEE 4 JULY 2005 | work = General Purposes Committee Meeting | publisher = Redcliffe City Council | date = 4 July 2005 | url = http://www.wheresourrailway.org/rccminute.doc | format = [[DOC (computing)|DOC]] | accessdate = 20 January 2009 }}</ref> In 2007, the [[Shire of Pine Rivers|Pine Rivers Shire Council]] (now a part of Moreton Bay Regional Council along with Redcliffe City Council) purchased the old Tulip Town shopping centre land at Kallangur for $6 million, with the potential for it to be used with the proposed Kippa-Ring railway line.<ref>{{cite news|last=Dowling |first=Bernie |title=Petrie-Redcliffe line hopes |publisher=''Pine Rivers Press'' |date=21 November 2007 |url=http://www.news.com.au/couriermail/story/0,23739,22796158-3102,00.html |accessdate=20 January 2009 |deadurl=yes |archiveurl=https://web.archive.org/web/20071124023243/http://www.news.com.au/couriermail/story/0,23739,22796158-3102,00.html |archivedate=24 November 2007 }}</ref> The site is nearby, but not immediately adjacent to, the location of a Murrumba Downs railway station. On 11 August 2008, the then state member for [[Electoral district of Murrumba|Murrumba]] through whose electorate the proposed line runs, said that there were no plans to construct the railway in the foreseeable future.<ref>{{cite news | title = No rail link to Redcliffe | publisher = ''Redcliffe and Bayside Herald'' | date = 12 August 2008 | url = http://redcliffe-and-bayside-herald.whereilive.com.au/news/story/no-rail-link-to-redcliffe/ | accessdate = 20 January 2009 }}</ref>
Frustrated by a lack of action by the Government, the [[City of Redcliffe|Redcliffe City Council]] (now [[Moreton Bay Regional Council|Moreton Bay City Council]]) unanimously moved on 4 July 2005 to support a campaign to have the Petrie to Kippa-Ring railway built, and to write to the Minister for Transport to express concern over the decision to not proceed with its construction.<ref>{{cite web | title = MINUTES OF GENERAL PURPOSES COMMITTEE 4 JULY 2005 | work = General Purposes Committee Meeting | publisher = Redcliffe City Council | date = 4 July 2005 | url = http://www.wheresourrailway.org/rccminute.doc | format = [[DOC (computing)|DOC]] | access-date = 20 January 2009 | archive-url = https://web.archive.org/web/20070704122613/http://www.wheresourrailway.org/rccminute.doc | archive-date = 4 July 2007 | url-status = dead | df = dmy-all }}</ref> In 2007, the [[Shire of Pine Rivers|Pine Rivers Shire Council]] (now a part of Moreton Bay City Council, along with Redcliffe City Council) purchased the old Tulip Town shopping centre land at Kallangur for $6 million, with the potential for it to be used with the proposed Kippa-Ring railway line.<ref>{{cite news|last=Dowling |first=Bernie |title=Petrie-Redcliffe line hopes |newspaper=Pine Rivers Press |date=21 November 2007 |url=http://www.news.com.au/couriermail/story/0,23739,22796158-3102,00.html |access-date=20 January 2009 |url-status=dead |archive-url=https://web.archive.org/web/20071124023243/http://www.news.com.au/couriermail/story/0,23739,22796158-3102,00.html |archive-date=24 November 2007 }}</ref> The site is nearby, but not immediately adjacent to, the location of Murrumba Downs railway station. On 11 August 2008, the then state member for [[Electoral district of Murrumba|Murrumba]] whose electorate the proposed line would through, said that there were no plans to construct the railway in the foreseeable future.<ref>{{cite news | title = No rail link to Redcliffe | work = Redcliffe and Bayside Herald| date = 12 August 2008 | url = http://redcliffe-and-bayside-herald.whereilive.com.au/news/story/no-rail-link-to-redcliffe/ | access-date = 20 January 2009 | archive-url = https://web.archive.org/web/20080815044418/http://redcliffe-and-bayside-herald.whereilive.com.au/news/story/no-rail-link-to-redcliffe/ | archive-date = 15 August 2008 | url-status = dead | df = dmy-all }}</ref>


The ''South East Queensland Regional Plan 2009–2031'', released in December 2008, identified the preserved corridor in its Transport Infrastructure Network Plan as a "quality rapid transit route".<ref>{{cite journal | title = Draft regional plan 2009–2031 – Part D12: Integrated transport | publisher = Government of Queensland | date = 5 December 2008 | url = http://www.dip.qld.gov.au/resources/plan/SEQ/draft-regional-plan/part-d-12-integrated-transport.pdf | format = [[PDF]] | accessdate = 20 January 2009 | deadurl = yes | archiveurl = https://web.archive.org/web/20090226111534/http://www.dip.qld.gov.au/resources/plan/SEQ/draft-regional-plan/part-d-12-integrated-transport.pdf | archivedate = 26 February 2009 | df = dmy-all }}</ref> During the [[Queensland state election, 2009|2009 Queensland state election]], the then opposition party promised to start the construction of the line in its first term if it was elected, with the first stage of the line from [[Petrie, Queensland|Petrie]] to [[Mango Hill, Queensland|Mango Hill]] commissioned in 2014, and completed to [[Kippa-Ring, Queensland|Kippa-Ring]] by 2016.<ref>{{cite news|last=Valentine |first=Alyce |title=Petrie to Kippa-Ring rail link promised by the LNP |publisher=''The Courier Mail'' |date=28 February 2009 |url=http://www.news.com.au/couriermail/story/0,23739,25114184-3102,00.html |accessdate=28 February 2009 |deadurl=yes |archiveurl=https://web.archive.org/web/20090228161110/http://www.news.com.au/couriermail/story/0,23739,25114184-3102,00.html |archivedate=28 February 2009 }}</ref> However, the incumbent government was subsequently returned to power.<ref>{{cite news |url=http://news.bbc.co.uk/2/hi/asia-pacific/7956440.stm |title=Queensland elects female premier |date=21 March 2009 |publisher=[[BBC News Online]]}}</ref>
The ''South East Queensland Regional Plan 2009–2031'', released in December 2008, identified the preserved corridor in its Transport Infrastructure Network Plan as a "quality rapid transit route".<ref>{{cite journal | title = Draft regional plan 2009–2031 – Part D12: Integrated transport | publisher = Government of Queensland | date = 5 December 2008 | url = http://www.dip.qld.gov.au/resources/plan/SEQ/draft-regional-plan/part-d-12-integrated-transport.pdf | access-date = 20 January 2009 | url-status = dead | archive-url = https://web.archive.org/web/20090226111534/http://www.dip.qld.gov.au/resources/plan/SEQ/draft-regional-plan/part-d-12-integrated-transport.pdf | archive-date = 26 February 2009 | df = dmy-all }}</ref> During the [[2009 Queensland state election]], the then opposition party promised to start the construction of the line in its first term if it was elected, with the first stage of the line from [[Petrie, Queensland|Petrie]] to [[Mango Hill, Queensland|Mango Hill]] commissioned in 2014, and completed to [[Kippa-Ring, Queensland|Kippa-Ring]] by 2016.<ref>{{cite news|last=Valentine |first=Alyce |title=Petrie to Kippa-Ring rail link promised by the LNP |newspaper=The Courier Mail |date=28 February 2009 |url=http://www.news.com.au/couriermail/story/0,23739,25114184-3102,00.html |access-date=28 February 2009 |url-status=dead |archive-url=https://web.archive.org/web/20090228161110/http://www.news.com.au/couriermail/story/0,23739,25114184-3102,00.html |archive-date=28 February 2009 }}</ref> However, the incumbent government was subsequently returned to power.<ref>{{cite news |url=http://news.bbc.co.uk/2/hi/asia-pacific/7956440.stm |title=Queensland elects female premier |date=21 March 2009 |work=[[BBC News Online]] |access-date=26 May 2010 |archive-url=https://web.archive.org/web/20110512174437/http://news.bbc.co.uk/2/hi/asia-pacific/7956440.stm |archive-date=12 May 2011 |url-status=live }}</ref>


During the [[Australian federal election, 2010|2010 federal election]], then Prime Minister [[Julia Gillard]] announced that the Kippa-Ring railway line would be fast-tracked, with the project to be complete by 2016 at a cost of $1.15 billion.<ref>{{cite news|last=Balogh|first=Stefanie|title=Gillard fast-tracks the $1.15 billion Redcliffe rail connection linking Petrie to Kippa-Ring |publisher=''The Courier Mail''|date=27 July 2010|url=http://www.couriermail.com.au/news/national/gillard-fast-tracks-the-115-billion-redcliffe-rail-connection-linking-petrie-to-kippa-ring/story-fn5z3z83-1225897194133|accessdate=24 November 2010}}</ref> On 3 December 2010, the funding agreement for the project was formalised, after being announced the day before. The agreement was signed by the Prime Minister Julia Gillard, Queensland Premier Anna Bligh and Moreton Bay mayor Allan Sutherland.<ref>{{cite news|last=Moore|first=Tony|title=Moreton Bay Rail Link remains on track |publisher=''The Brisbane Times (Fairfax Media)''|date=3 December 2010|url=http://www.brisbanetimes.com.au/queensland/moreton-bay-rail-link-remains-on-track-20101203-18il0.html/story-fn5z3z83-1225897194133|accessdate=3 December 2010}}</ref>
During the [[2010 Australian federal election|2010 federal election]], then Prime Minister [[Julia Gillard]] announced that the Kippa-Ring railway line would be fast-tracked, with the project to be complete by 2016 at a cost of $1.15 billion.<ref>{{cite news|last=Balogh|first=Stefanie|title=Gillard fast-tracks the $1.15 billion Redcliffe rail connection linking Petrie to Kippa-Ring|newspaper=The Courier Mail|date=27 July 2010|url=http://www.couriermail.com.au/news/national/gillard-fast-tracks-the-115-billion-redcliffe-rail-connection-linking-petrie-to-kippa-ring/story-fn5z3z83-1225897194133|access-date=24 November 2010|archive-url=https://web.archive.org/web/20120612034909/http://www.couriermail.com.au/news/national/gillard-fast-tracks-the-115-billion-redcliffe-rail-connection-linking-petrie-to-kippa-ring/story-fn5z3z83-1225897194133|archive-date=12 June 2012|url-status=live}}</ref> On 3 December 2010, the funding agreement for the project was formalised, after being announced the day before. The agreement was signed by the Prime Minister Julia Gillard, Queensland Premier Anna Bligh and Moreton Bay mayor Allan Sutherland.<ref>{{cite news|last=Moore|first=Tony|title=Moreton Bay Rail Link remains on track |publisher=The Brisbane Times (Fairfax Media)|date=3 December 2010|url=http://www.brisbanetimes.com.au/queensland/moreton-bay-rail-link-remains-on-track-20101203-18il0.html/story-fn5z3z83-1225897194133|access-date=3 December 2010}}</ref>


The Department of Transport and Main Roads held an industry briefing in Brisbane on 17 August 2012 to provide an update on the Moreton Bay Rail Link Project (MBRL). The Request for Proposal was advertised on 24 August 2012 with responses closing on 21 September 2012. The procurement process to select a single design-and-construct contractor utilised a modified Early Contractor Involvement (ECI) process.
The Department of Transport and Main Roads held an industry briefing in Brisbane on 17 August 2012 to provide an update on the Moreton Bay Rail Link Project (MBRL).{{cn|date=April 2024}} The Request for Proposal was advertised on 24 August 2012 with responses closing on 21 September 2012. The procurement process to select a single design-and-construct contractor utilised a modified [[Early Contractor Involvement]] (ECI) process.{{cn|date=April 2024}}


On 1 August 2013,<ref>{{cite news|author=AAP|url=http://www.theaustralian.com.au/business/breaking-news/thiess-to-lead-brisbane-rail-project/story-e6frg90f-1226689496405|title=Thiess to lead Brisbane rail project|newspaper=The Australian|date=1 August 2013}}</ref> Thiess Pty Ltd, a subsidiary of Leighton Holdings (with designers Aurecon, AECOM and geotechnical subcontractor Golder Associates) was awarded the $650 million contract for the design and construction of the new rail line. Thiess was part of the Trackstar team building the {{convert|12.6|km|mi}} Moreton Bay rail link.
On 1 August 2013,<ref>{{cite news|author=AAP|url=http://www.theaustralian.com.au/business/breaking-news/thiess-to-lead-brisbane-rail-project/story-e6frg90f-1226689496405|title=Thiess to lead Brisbane rail project|newspaper=The Australian|date=1 August 2013|access-date=1 August 2013|archive-url=https://web.archive.org/web/20130801192730/http://www.theaustralian.com.au/business/breaking-news/thiess-to-lead-brisbane-rail-project/story-e6frg90f-1226689496405|archive-date=1 August 2013|url-status=live}}</ref> Thiess Pty Ltd, a subsidiary of Leighton Holdings (with designers Aurecon, AECOM and geotechnical subcontractor Golder Associates) was awarded the $650 million contract for the design and construction of the new rail line. Thiess was part of the Trackstar team building the {{convert|12.6|km|mi}} Moreton Bay rail link.


On 30 May 2016, The [[Government of Queensland|Queensland Government]] announced <ref>{{Cite web| title = Statement on Moreton Bay Rail Link Project | format = Text | work = Minister for Transport | accessdate = 2016-05-30| date = 2016-05-30| url = http://statements.qld.gov.au/Statement/2016/5/30/statement-on-moreton-bay-rail-link-project}}</ref> that the rail link had been delayed indefinitely from its original mid-late 2016 opening period, due to signalling system faults that had been detected at Petrie, where the new line met the existing rail system. Testing indicated that the signalling system in its current configuration was unable to handle all the simultaneous rail movements at the junction, and would cause train delays right across the entire [[Queensland Rail City network|QR City Network]].<ref>{{Cite web| title = Signalling faults delay Moreton Bay Rail Link| work = ABC News| format = Text| accessdate = 2016-05-30| date = 2016-05-30| url = http://www.abc.net.au/news/2016-05-30/moreton-bay-rail-link-delayed-by-signalling-faults/7459618}}</ref>
On 30 May 2016, The [[Government of Queensland|Queensland Government]] announced<ref>{{Cite web | title = Statement on Moreton Bay Rail Link Project | format = Text | work = Minister for Transport | access-date = 30 May 2016 | date = 30 May 2016 | url = http://statements.qld.gov.au/Statement/2016/5/30/statement-on-moreton-bay-rail-link-project | archive-url = https://web.archive.org/web/20160630030845/http://statements.qld.gov.au/Statement/2016/5/30/statement-on-moreton-bay-rail-link-project | archive-date = 30 June 2016 | url-status = live | df = dmy-all }}</ref> that the rail link had been delayed indefinitely from its original mid-late 2016 opening period, due to signalling system faults that had been detected at Petrie, where the new line met the existing rail system. Testing indicated that the signalling system in its current configuration was unable to handle all the simultaneous rail movements at the junction, and would cause train delays right across the entire [[Queensland Rail City network|QR City Network]].<ref>{{Cite web| title = Signalling faults delay Moreton Bay Rail Link| work = ABC News| format = Text| access-date = 30 May 2016| date = 30 May 2016| url = http://www.abc.net.au/news/2016-05-30/moreton-bay-rail-link-delayed-by-signalling-faults/7459618| archive-url = https://web.archive.org/web/20160602174717/http://www.abc.net.au/news/2016-05-30/moreton-bay-rail-link-delayed-by-signalling-faults/7459618| archive-date = 2 June 2016| url-status = live| df = dmy-all}}</ref>


On 31 August 2016, the Transport Minister [[Stirling Hinchliffe]] announced in Parliament that the Moreton Bay Rail Link would open on 4 October 2016, with an open day the day before.<ref>{{Cite web| title = Qld's Moreton Bay rail to open in October| work = News.com.au| format = Text| accessdate = 2016-08-31| date = 2016-08-31| url = http://www.news.com.au/national/breaking-news/qlds-moreton-bay-rail-to-open-in-october/news-story/f6375450648379ee23ebdc8cab858081}}</ref>
On 31 August 2016, the Transport Minister [[Stirling Hinchliffe]] announced in Parliament that the Moreton Bay Rail Link would open on 4 October 2016, with an open day the day before.<ref>{{Cite web| title = Qld's Moreton Bay rail to open in October| work = News.com.au| format = Text| access-date = 31 August 2016| date = 31 August 2016| url = http://www.news.com.au/national/breaking-news/qlds-moreton-bay-rail-to-open-in-october/news-story/f6375450648379ee23ebdc8cab858081| archive-url = https://web.archive.org/web/20160831060434/http://www.news.com.au/national/breaking-news/qlds-moreton-bay-rail-to-open-in-october/news-story/f6375450648379ee23ebdc8cab858081| archive-date = 31 August 2016| url-status = live| df = dmy-all}}</ref>


A shortage of drivers owing to the increased requirements created by the new line resulted in mass cancellations of services across the Brisbane rail network, with over 100 cancelled on 21 October.<ref>{{Cite web| title = Queensland Rail apologises over train cancellations| work = ABC News| format = Text| accessdate = 2016-11-01| date = 2016-10-21| url = http://www.abc.net.au/news/2016-10-21/queensland-rail-apologise-over-train-cancellations/7955500}}</ref> After an admission of fault, Queensland Rail CEO Helen Gluer resigned over the debacle, as did the chairman Michael Klug.<ref>{{Cite web| title = Former QR boss Helen Gluer receives almost $160000 payout| work = ABC News| format = Text| accessdate = 2016-11-01| date = 2016-11-01| url = http://www.abc.net.au/news/2016-11-01/former-qr-boss-helen-gluer-receives-almost-$160000-payout/7986276}}</ref> In February 2017, a commission of inquiry found that passengers were faced with train cancellations until at least the end of 2018, because no new drivers out of 200 promised had yet been fully trained. The commission also reported that QR management had not told rail operator's board, Transport Minister [[Stirling Hinchliffe]], or Treasurer Curtis Pitt about how bad the problem was. Hinchliffe resigned a minister, despite the inquiry not attributing any blame to him, finding that the difficulties were a result of structural and cultural problems within Queensland Rail.<ref>{{cite news|last1=Templeton|first1=Anthony|last2=Vogler|first2=Sarah|title=Queensland rail report warns of cancellations, risk to Gold Coast Commonwealth Games|url=http://www.couriermail.com.au/news/queensland/queensland-government/queensland-rail-report-warns-of-cancellations-risk-to-gold-coast-commonwealth-games/news-story/ad23fceb8ee3d6feca35522530c88f60|accessdate=2017-06-09|work=The Courier Mail|date=2017-02-06}}</ref><ref>{{cite news|last1=Templeton|first1=Anthony|last2=Vogler|first2=Sarah|title=Transport Minister Stirling Hinchliffe resigns|url=http://www.couriermail.com.au/news/queensland/transport-minister-stirling-hinchcliffe-resigns-as-queensland-rail-report-highlights-years-of-train-cancellations-and-no-new-drivers/news-story/6107fa981df655d36d2328d93e63548a|accessdate=2017-06-09|work=The Courier Mail|date=2017-02-06}}</ref>
A shortage of drivers owing to the increased requirements created by the new line resulted in mass cancellations of services across the Brisbane rail network, with over 100 cancelled on 21 October.<ref>{{Cite web| title = Queensland Rail apologises over train cancellations| work = ABC News| format = Text| access-date = 1 November 2016| date = 21 October 2016| url = http://www.abc.net.au/news/2016-10-21/queensland-rail-apologise-over-train-cancellations/7955500| archive-url = https://web.archive.org/web/20161103215919/http://www.abc.net.au/news/2016-10-21/queensland-rail-apologise-over-train-cancellations/7955500| archive-date = 3 November 2016| url-status = live| df = dmy-all}}</ref> After an admission of fault, Queensland Rail CEO Helen Gluer resigned over the debacle, as did the chairman Michael Klug.<ref>{{Cite web| title = Former QR boss Helen Gluer receives almost $160000 payout| work = ABC News| format = Text| access-date = 1 November 2016| date = 1 November 2016| url = http://www.abc.net.au/news/2016-11-01/former-qr-boss-helen-gluer-receives-almost-$160000-payout/7986276| archive-url = https://web.archive.org/web/20161102153524/http://www.abc.net.au/news/2016-11-01/former-qr-boss-helen-gluer-receives-almost-$160000-payout/7986276| archive-date = 2 November 2016| url-status = live| df = dmy-all}}</ref> In February 2017, a commission of inquiry found that passengers were faced with train cancellations until at least the end of 2018, because no new drivers out of 200 promised had yet been fully trained. The commission also reported that QR management had not told Transport Minister [[Stirling Hinchliffe]] or Treasurer Curtis Pitt about how bad the problem was. Hinchliffe resigned as minister, despite the inquiry not attributing any blame to him, finding that the difficulties were a result of structural and cultural problems within Queensland Rail.<ref>{{cite news|last1=Templeton|first1=Anthony|last2=Vogler|first2=Sarah|title=Queensland rail report warns of cancellations, risk to Gold Coast Commonwealth Games|url=http://www.couriermail.com.au/news/queensland/queensland-government/queensland-rail-report-warns-of-cancellations-risk-to-gold-coast-commonwealth-games/news-story/ad23fceb8ee3d6feca35522530c88f60|access-date=9 June 2017|work=The Courier Mail|date=6 February 2017}}</ref><ref>{{cite news|last1=Templeton|first1=Anthony|last2=Vogler|first2=Sarah|title=Transport Minister Stirling Hinchliffe resigns|url=http://www.couriermail.com.au/news/queensland/transport-minister-stirling-hinchcliffe-resigns-as-queensland-rail-report-highlights-years-of-train-cancellations-and-no-new-drivers/news-story/6107fa981df655d36d2328d93e63548a|access-date=9 June 2017|work=The Courier Mail|date=6 February 2017|archive-url=https://web.archive.org/web/20170208193459/http://www.couriermail.com.au/news/queensland/transport-minister-stirling-hinchcliffe-resigns-as-queensland-rail-report-highlights-years-of-train-cancellations-and-no-new-drivers/news-story/6107fa981df655d36d2328d93e63548a|archive-date=8 February 2017|url-status=live}}</ref>

Since completion the infrastructure has been owned by the [[Department of Transport and Main Roads]] but was transferred to [[Queensland Rail]] in 2019.<ref name="Budget2018"/>


==Timeline==
==Timeline==

[[File:Mango Hill railway station at Mango Hill, Queensland.jpg|thumb|[[Mango Hill railway station]], 2016]]
[[File:Mango Hill railway station at Mango Hill, Queensland.jpg|thumb|[[Mango Hill railway station]], 2016]]
Milestones:<ref name="TMR2">{{cite news| title = TMR MBRL | work = Moreton Bay Rail Link | publisher = Queensland Government, Department of Transport and Main Roads | date = 15 June 2012 | url=http://www.tmr.qld.gov.au/moretonbayrail | accessdate=15 August 2014}}</ref>
Milestones:<ref name="TMR2">{{cite news | title = TMR MBRL | work = Moreton Bay Rail Link | publisher = Queensland Government, Department of Transport and Main Roads | date = 15 June 2012 | url = http://www.tmr.qld.gov.au/moretonbayrail | access-date = 15 August 2014 | archive-url = https://web.archive.org/web/20140728222039/http://www.tmr.qld.gov.au/moretonbayrail | archive-date = 28 July 2014 | url-status = dead | df = dmy-all }}</ref>
* 2003 Petrie to Kippa-Ring Public Transport Corridor Study completed, provided the foundation for the current project design

* July 2010 Funding agreement signed between local, state and commonwealth government
* 2003 - Petrie to Kippa-Ring Public Transport Corridor Study completed, provided the foundation for the current project design
* January 2012 Design of six new stations begins
* July 2010 - Funding agreement signed between local, state and commonwealth government
* July 2012 Construction on Kinsellas Road East bridge begins after construction contract awarded to McIlwain Civil Contractors
* January 2012 - Design of six new stations begins
* 24 August 2012 Tender process for rail design and construction begins with the release of a Request for Proposals
* July 2012 - Construction on Kinsellas Road East bridge begins after construction contract awarded to McIlwain Civil Contractors
* April 2013 Kinsellas Road East bridge completed and open to traffic
* 24 August 2012 - Tender process for rail design and construction begins with the release of a Request for Proposals
* Mid 2013 Concept designs for six new stations available
* April 2013 - Kinsellas Road East bridge completed and open to traffic
* 1 August 2013 Contract awarded to Thiess to design and construct the Moreton Bay Rail Link Project
* Mid 2013 - Concept designs for six new stations available
* Late 2013 Construction begins on the Dohles Rocks Road and Goodfellows Road bridges at Kallangur
* 1 August 2013 - Contract awarded to Thiess to design and construct the Moreton Bay Rail Link Project
* September 2013 – Pre-construction activities begin, including boundary fencing and surveying of utilities and properties
* Late 2013 - Construction begins on the Dohles Rocks Road and Goodfellows Road bridges at Kallangur
* September 2013 - Pre-construction activities begin, including boundary fencing and surveying of ground, ecology, utilities and properties
* Early 2014 – Rail corridor construction works begin (embankment, track, structures and stations)
* June 2014 Construction of rail bridges over the Bruce Highway starts
* Early 2014 - Rail corridor construction works begin (embankment, track, structures and stations)
* March 2015 Major earthworks including track foundation complete, and laying of ballast and track begins.
* June 2014 - Construction of rail bridges over the Bruce Highway starts
*[[File:Mango Hill East railway station, Brisbane, Jan 2017.jpg|thumb|Mango Hill East Station]]January 2016 Construction nearly complete. Electric current switched on, and testing of track, overhead wires, train signalling and train stabling yard begins.
* March 2015 - Major earthworks including track foundation complete, and laying of ballast and track begins.
* May 2016 – Queensland Rail advised TMR that the signalling is unsafe for handling required number of trains, and the Minister announces a delay in the completion of project.
* January 2016 - Construction nearly complete. Electric current switched on, and testing of track, overhead wires, train signalling and train stabling yard begins.
* May 2016 - Queensland Rail advised TMR that the signalling is unsafe for handling required number of trains, and the Minister announces a delay in the completion of project.
* May 2016 QR staff reported as advising that the platform at Petrie is misaligned and trains are scraping the edge as they pass through the station. There is no official confirmation of this.{{Citation needed|date=July 2016}}
* 3 October 2016 Redcliffe Peninsula Line declared open by Prime Minister [[Malcolm Turnbull]], Queensland Premier [[Annastacia Palaszczuk]] and Moreton Bay Mayor Allan Sutherland, with Moreton Bay residents enjoying free shuttle trains between stations and community events at each station.
* May 2016 - QR staff reported as advising that the platform at Petrie is misaligned and trains are scraping the edge as they pass through the station. There is no official confirmation of this.{{Citation needed|date=July 2016}}
* 4 October 2016 Redcliffe Peninsula line opened to passengers
* 3 October 2016 - Redcliffe Peninsula Line declared open by Prime Minister [[Malcolm Turnbull]], Queensland Premier [[Annastacia Palaszczuk]] and Moreton Bay Mayor Allan Sutherland, with Moreton Bay residents enjoying free shuttle trains between stations and community events at each station.
* 4 October 2016 - Redcliffe Peninsula line opened to passengers


== Line guide and services ==
== Line guide and services ==
Most services to and/from Kippa-Ring continue on to the [[Springfield railway line, Brisbane|Springfield]] line. Redcliffe Peninsula services run express between Northgate and Bowen Hills, stopping only at Eagle Junction. The typical travel time between Kippa-Ring and Brisbane City is approximately 56 minutes (to [[Central railway station, Brisbane|Central]]).<ref>{{cite web|title=Redcliffe Peninsula line timetable|work=|publisher=[[TransLink (South East Queensland)|TransLink]]|date=4 October 2016|url=http://translink.com.au/sites/default/files/assets/timetables/161004-redcliffe-peninsula.pdf|format=pdf|accessdate=2 October 2016}}{{dead link|date=April 2018 |bot=InternetArchiveBot |fix-attempted=yes }}</ref>
Most services to and/from Kippa-Ring continue on to the [[Springfield railway line, Brisbane|Springfield]] line. Redcliffe Peninsula services run express between Northgate and Bowen Hills, stopping only at Eagle Junction. The typical travel time between Kippa-Ring and Brisbane City is approximately 56 minutes (to [[Central railway station, Brisbane|Central]]).<ref>{{Queensland Timetables|Redcliffe}}</ref>


Passengers for/from the [[Caboolture railway line|Caboolture]] and [[Nambour and Gympie North railway line|Nambour and Gympie North]] lines change at Petrie, [[Shorncliffe railway line|Shorncliffe]] line at Northgate, [[Airtrain (Brisbane)|Airport]] and [[Doomben-Pinkenba railway line|Doomben]] lines at Eagle Junction, [[Ferny Grove railway line|Ferny Grove]] line at Bowen Hills, and all other lines at Central.
Passengers for/from the [[Caboolture railway line|Caboolture]] and [[Nambour and Gympie North railway line|Nambour and Gympie North]] lines change at Petrie, [[Shorncliffe railway line|Shorncliffe]] line at Northgate, [[Airtrain (Brisbane)|Airport]] and [[Doomben-Pinkenba railway line|Doomben]] lines at Eagle Junction, [[Ferny Grove railway line|Ferny Grove]] line at Bowen Hills, and all other lines at Central.


{{Moreton Bay Rail Link|float=none}}
{|
|{{Moreton Bay Rail Link}}
|}


==References==
==References==
Line 123: Line 123:


==External links==
==External links==
*[https://web.archive.org/web/20081226150103/http://www.translink.com.au/qt/translin.nsf/index/project_pkptcs Petrie to Kippa-Ring public transport corridor study]
* [https://web.archive.org/web/20081226150103/http://www.translink.com.au/qt/translin.nsf/index/project_pkptcs Petrie to Kippa-Ring public transport corridor study]
*{{Queensland Timetables|Train Network}}
*[http://www.tmr.qld.gov.au/moretonbayrail Moreton Bay Rail Link at State of Queensland (Department of Transport and Main Roads) 2010]
*[https://translink.com.au/sites/default/files/assets/resources/plan-your-journey/maps/170109-train-network-map.pdf Translink railway network map]


{{Public transport in Queensland}}
{{Public transport in Queensland}}
Line 133: Line 132:
[[Category:3 ft 6 in gauge railways in Australia]]
[[Category:3 ft 6 in gauge railways in Australia]]
[[Category:2016 establishments in Australia]]
[[Category:2016 establishments in Australia]]
[[Category:25 kV AC railway electrification]]

Latest revision as of 03:41, 29 April 2024

Redcliffe Peninsula line
Overview
StatusOpen
OwnerQueensland Rail (from 2019)[1]
LocaleMurrumba Downs, Queensland, Australia
Termini
  • Petrie Station
  • Kippa Ring Station
Stations6
Colour on mapLight Blue
Websitequeenslandrail.com.au
Service
TypeCommuter Rail
Operator(s)Queensland Rail
History
Opened4 October 2016
Technical
Line length13 km (8.1 mi)
Number of tracksQuadruple to Northgate, triple to Petrie, double track to Kippa Ring.
Track gauge1,067 mm (3 ft 6 in)
Electrification2016
Operating speed100 km/h (62 mph)
Mango Hill Station under construction (March 2015)
Kippa Ring Station under construction, project sign

The Redcliffe Peninsula line is a 12 km (7.5 mi) stretch of heavy gauge dual-track railway between Petrie and Kippa-Ring on the Redcliffe peninsula in Queensland, Australia.[2] The new line is part of Queensland Rail's City suburban network, branching from the North Coast line. It starts 200 metres (656 ft) north of Petrie railway station, extending from (27.5 km (17.1 mi) to 40.1 km (24.9 mi) north of Central railway station).

The line has six stations: Kallangur, Murrumba Downs, Mango Hill, Mango Hill East (previously called Kinsellas Road), Rothwell and Kippa-Ring. Funding for the project consisted of $742 million from the Commonwealth Government, $300 million from the Queensland Government (plus another $120 million for land) and $105 million from the Moreton Bay Regional Council.[2]

The line was officially opened on 3 October 2016, about 130 years after it was first proposed.[3] The first train to depart from Kippa-Ring was SMU 285 and 295, with the Prime Minister, Queensland Premier and the first train ballot winners on board.

Early history

[edit]

A rail line to Redcliffe was first proposed in 1895 when the Queensland Government's Minister for Railways, the Hon. Robert Philp, considered three proposals, preferring a route via North Pine (Petrie).[4] In more recent times, the route for a Redcliffe railway was identified in the 1970s, and the required land was purchased and preserved as a transport corridor by the state government in the 1980s.[5] The issue of the proposed railway line seemed to be a recurrent theme during state elections, leading to scepticism the line would ever be constructed.[citation needed]

Petrie to Kippa-Ring Public Transport Corridor Study

[edit]

In 1999, the newly elected state government commissioned an investigative study into the transport corridor between Petrie to Kippa-Ring,[6] conducted by GHD Group. Key components under investigation included the mode of transport, the route and location of stations, future public transport usage, and the timing of construction.[7]

The study was conducted in two parts. The first was completed in June 2000. It aimed to meet the state government's obligations to identify or forgo rights to a transport corridor running through the North Lakes residential development. This first stage was to decide on the preferred mode of transport, the viability of public transport along the corridor, and the preferred alignment of the corridor.[5] Four modes of transport were investigated: heavy rail, buses or a busway, light rail, and monorail. It was decided that heavy rail was the preferred mode of transport along the existing preserved corridor as it was the only option to give an acceptable level of economic efficiency. The study found that heavy rail had a benefit-cost ratio of 1.46, and would generate the highest levels of patronage due to its integration into the existing Citytrain network, requiring no change mode.[5]

The second part of the study was completed in October 2003. It looked at the route of the corridor between Petrie railway station and Kallangur railway station at Goodfellows Road. The original, preserved route was recommended.[5]

Kippa Ring Station

On 17 December 2001, the Minister for Transport announced public transport improvements between Petrie and Kippa-Ring, planned as part of a staged development of a new rail line in the area,[8] following the release of the recommendations of the draft report of the Petrie to Kippa-Ring Public Transport Corridor Study. The Minister also said that the government was investigating private sector involvement in the construction of the project.[8] On 11 July 2003, the Minister said that the government had not made a commitment on the proposed line, and that it may not go ahead because interest from the private sector in the project was negligible.[9] This was at a time when similar passenger rail public-private partnerships such as the Airtrain to the Brisbane Airport and Airport Link to Sydney Airport were faltering.[10][11]

In June 2004, Queensland Transport released the Petrie to Kippa-Ring Public Transport Corridor Study's Impact Assessment Study. It claimed that the Impact Assessment Study only looked at costs of the Petrie to Kippa-Ring corridor, and did not take into account commercial-in-confidence costs involved in operating the trains, integrating the services with the rest of the Citytrain network, higher maintenance costs, and the costs of increasing capacity between the Brisbane central business district and Petrie. Based on these higher costs, Queensland Transport deemed the construction of the railway by 2007 could not be justified. The report also said possible savings from a public-private partnership were small and would not provide value for money. Queensland Transport said that it would preserve the corridor until it was required.[12] On 15 June 2004 the government announced $3 million for improving existing bus services along the corridor between Kippa-Ring (Redcliffe) and Petrie "in the short to medium term". However, it again announced the continuing preservation of the reserved corridor for future public transport use.[13]

Recent history

[edit]
Site of Kippa-Ring railway station prior to construction.

Frustrated by a lack of action by the Government, the Redcliffe City Council (now Moreton Bay City Council) unanimously moved on 4 July 2005 to support a campaign to have the Petrie to Kippa-Ring railway built, and to write to the Minister for Transport to express concern over the decision to not proceed with its construction.[14] In 2007, the Pine Rivers Shire Council (now a part of Moreton Bay City Council, along with Redcliffe City Council) purchased the old Tulip Town shopping centre land at Kallangur for $6 million, with the potential for it to be used with the proposed Kippa-Ring railway line.[15] The site is nearby, but not immediately adjacent to, the location of Murrumba Downs railway station. On 11 August 2008, the then state member for Murrumba whose electorate the proposed line would through, said that there were no plans to construct the railway in the foreseeable future.[16]

The South East Queensland Regional Plan 2009–2031, released in December 2008, identified the preserved corridor in its Transport Infrastructure Network Plan as a "quality rapid transit route".[17] During the 2009 Queensland state election, the then opposition party promised to start the construction of the line in its first term if it was elected, with the first stage of the line from Petrie to Mango Hill commissioned in 2014, and completed to Kippa-Ring by 2016.[18] However, the incumbent government was subsequently returned to power.[19]

During the 2010 federal election, then Prime Minister Julia Gillard announced that the Kippa-Ring railway line would be fast-tracked, with the project to be complete by 2016 at a cost of $1.15 billion.[20] On 3 December 2010, the funding agreement for the project was formalised, after being announced the day before. The agreement was signed by the Prime Minister Julia Gillard, Queensland Premier Anna Bligh and Moreton Bay mayor Allan Sutherland.[21]

The Department of Transport and Main Roads held an industry briefing in Brisbane on 17 August 2012 to provide an update on the Moreton Bay Rail Link Project (MBRL).[citation needed] The Request for Proposal was advertised on 24 August 2012 with responses closing on 21 September 2012. The procurement process to select a single design-and-construct contractor utilised a modified Early Contractor Involvement (ECI) process.[citation needed]

On 1 August 2013,[22] Thiess Pty Ltd, a subsidiary of Leighton Holdings (with designers Aurecon, AECOM and geotechnical subcontractor Golder Associates) was awarded the $650 million contract for the design and construction of the new rail line. Thiess was part of the Trackstar team building the 12.6 kilometres (7.8 mi) Moreton Bay rail link.

On 30 May 2016, The Queensland Government announced[23] that the rail link had been delayed indefinitely from its original mid-late 2016 opening period, due to signalling system faults that had been detected at Petrie, where the new line met the existing rail system. Testing indicated that the signalling system in its current configuration was unable to handle all the simultaneous rail movements at the junction, and would cause train delays right across the entire QR City Network.[24]

On 31 August 2016, the Transport Minister Stirling Hinchliffe announced in Parliament that the Moreton Bay Rail Link would open on 4 October 2016, with an open day the day before.[25]

A shortage of drivers owing to the increased requirements created by the new line resulted in mass cancellations of services across the Brisbane rail network, with over 100 cancelled on 21 October.[26] After an admission of fault, Queensland Rail CEO Helen Gluer resigned over the debacle, as did the chairman Michael Klug.[27] In February 2017, a commission of inquiry found that passengers were faced with train cancellations until at least the end of 2018, because no new drivers out of 200 promised had yet been fully trained. The commission also reported that QR management had not told Transport Minister Stirling Hinchliffe or Treasurer Curtis Pitt about how bad the problem was. Hinchliffe resigned as minister, despite the inquiry not attributing any blame to him, finding that the difficulties were a result of structural and cultural problems within Queensland Rail.[28][29]

Since completion the infrastructure has been owned by the Department of Transport and Main Roads but was transferred to Queensland Rail in 2019.[1]

Timeline

[edit]
Mango Hill railway station, 2016

Milestones:[30]

  • 2003 – Petrie to Kippa-Ring Public Transport Corridor Study completed, provided the foundation for the current project design
  • July 2010 – Funding agreement signed between local, state and commonwealth government
  • January 2012 – Design of six new stations begins
  • July 2012 – Construction on Kinsellas Road East bridge begins after construction contract awarded to McIlwain Civil Contractors
  • 24 August 2012 – Tender process for rail design and construction begins with the release of a Request for Proposals
  • April 2013 – Kinsellas Road East bridge completed and open to traffic
  • Mid 2013 – Concept designs for six new stations available
  • 1 August 2013 – Contract awarded to Thiess to design and construct the Moreton Bay Rail Link Project
  • Late 2013 – Construction begins on the Dohles Rocks Road and Goodfellows Road bridges at Kallangur
  • September 2013 – Pre-construction activities begin, including boundary fencing and surveying of utilities and properties
  • Early 2014 – Rail corridor construction works begin (embankment, track, structures and stations)
  • June 2014 – Construction of rail bridges over the Bruce Highway starts
  • March 2015 – Major earthworks including track foundation complete, and laying of ballast and track begins.
  • Mango Hill East Station
    January 2016 – Construction nearly complete. Electric current switched on, and testing of track, overhead wires, train signalling and train stabling yard begins.
  • May 2016 – Queensland Rail advised TMR that the signalling is unsafe for handling required number of trains, and the Minister announces a delay in the completion of project.
  • May 2016 – QR staff reported as advising that the platform at Petrie is misaligned and trains are scraping the edge as they pass through the station. There is no official confirmation of this.[citation needed]
  • 3 October 2016 – Redcliffe Peninsula Line declared open by Prime Minister Malcolm Turnbull, Queensland Premier Annastacia Palaszczuk and Moreton Bay Mayor Allan Sutherland, with Moreton Bay residents enjoying free shuttle trains between stations and community events at each station.
  • 4 October 2016 – Redcliffe Peninsula line opened to passengers

Line guide and services

[edit]

Most services to and/from Kippa-Ring continue on to the Springfield line. Redcliffe Peninsula services run express between Northgate and Bowen Hills, stopping only at Eagle Junction. The typical travel time between Kippa-Ring and Brisbane City is approximately 56 minutes (to Central).[31]

Passengers for/from the Caboolture and Nambour and Gympie North lines change at Petrie, Shorncliffe line at Northgate, Airport and Doomben lines at Eagle Junction, Ferny Grove line at Bowen Hills, and all other lines at Central.

Redcliffe Peninsula line

showing distance from Central
and ticket zones

km
Zone
0.8
Roma Street
0.0
Central
1.3
Fortitude Valley
2.7
Bowen Hills
00.0
express stops
4.5
Albion
5.6
Wooloowin
6.5
Eagle Junction
Junction Road
00.0
express stops
7.8
Toombul
Sandgate Road
8.7
Nundah
9.9
Northgate
 1 
 2 
Sandgate Road
11.2
Virginia
12.4
Sunshine
13.4
Geebung
Robinson Road West
Murphy Road
14.9
Zillmere
16.6
Carseldine
Linkfield Road
20.0
Bald Hills
South Pine Road
22.4
Strathpine
23.8
Bray Park
25.8
Lawnton
 2 
 3 
27.4
Petrie
30.2
Kallangur
31.5
Murrumba Downs
33.3
Mango Hill
34.9
Mango Hill East
36.5
Rothwell
40.0
Kippa-Ring


Disabled access All stations are accessible

References

[edit]
  1. ^ a b Budget Strategy and Outlook Budget Paper No.2 (PDF). Queensland Government. 2018. p. 122. Archived (PDF) from the original on 12 June 2018. Retrieved 12 June 2018.
  2. ^ a b "Moreton Bay Rail Link (Department of Transport and Main Roads)". Queensland Government. 15 November 2010. Archived from the original on 20 February 2011. Retrieved 24 November 2010.
  3. ^ Schwarten, Evan. "Brisbane rail link opens 130 years late". News.com.au. News Corp Australia. Australian Associated Press. Archived from the original on 4 October 2016. Retrieved 5 October 2016.
  4. ^ "Railway to Redcliffe". The Telegraph (Brisbane). No. 7, 037. Queensland, Australia. 8 May 1895. p. 5. Retrieved 15 September 2020 – via National Library of Australia.
  5. ^ a b c d GHD Pty Ltd (October 2003). "Petrie to Kippa-Ring Public Transport Corridor Study – Final Impact Assessment Study Report" (PDF). Queensland Transport. Archived from the original (PDF) on 31 August 2007. Retrieved 20 January 2009. {{cite journal}}: Cite journal requires |journal= (help)
  6. ^ "BUDGET BRIEFS" (Press release). Government of Queensland. 15 September 1999. Archived from the original on 10 June 2011. Retrieved 20 January 2009.
  7. ^ "Public transport corridor information days to assist residents" (Press release). Government of Queensland. 24 March 2000. Archived from the original on 10 June 2011. Retrieved 20 January 2009.
  8. ^ a b "Petrie to Kippa-Ring Rail Corridor" (Press release). Government of Queensland. 17 December 2001. Archived from the original on 10 June 2011. Retrieved 20 January 2009.
  9. ^ "Rail may not be an option for Petrie to Kippa-Ring" (Press release). Government of Queensland. 11 July 2003. Archived from the original on 10 June 2011. Retrieved 20 January 2009.
  10. ^ "Talks underway over future of private Airtrain operation". Australian Associated Press. 15 June 2002. Retrieved 20 January 2009.[dead link]
  11. ^ Bissett, Kelvin (18 December 2006). "Fast rail plan for Sydney". The Daily Telegraph. Archived from the original on 17 May 2008. Retrieved 20 January 2009.
  12. ^ "Petrie to Kippa-Ring PublicTransport Corridor Study Independent assessment of IAS Report" (PDF). Queensland Transport. June 2004. Archived from the original (PDF) on 5 July 2008. Retrieved 20 January 2009. {{cite journal}}: Cite journal requires |journal= (help)
  13. ^ "$3M FOR PETRIE TO KIPPA-RING PUBLIC TRANSPORT CORRIDOR" (Press release). Government of Queensland. 15 June 2004. Archived from the original on 10 June 2011. Retrieved 20 January 2009.
  14. ^ "MINUTES OF GENERAL PURPOSES COMMITTEE 4 JULY 2005". General Purposes Committee Meeting. Redcliffe City Council. 4 July 2005. Archived from the original (DOC) on 4 July 2007. Retrieved 20 January 2009.
  15. ^ Dowling, Bernie (21 November 2007). "Petrie-Redcliffe line hopes". Pine Rivers Press. Archived from the original on 24 November 2007. Retrieved 20 January 2009.
  16. ^ "No rail link to Redcliffe". Redcliffe and Bayside Herald. 12 August 2008. Archived from the original on 15 August 2008. Retrieved 20 January 2009.
  17. ^ "Draft regional plan 2009–2031 – Part D12: Integrated transport" (PDF). Government of Queensland. 5 December 2008. Archived from the original (PDF) on 26 February 2009. Retrieved 20 January 2009. {{cite journal}}: Cite journal requires |journal= (help)
  18. ^ Valentine, Alyce (28 February 2009). "Petrie to Kippa-Ring rail link promised by the LNP". The Courier Mail. Archived from the original on 28 February 2009. Retrieved 28 February 2009.
  19. ^ "Queensland elects female premier". BBC News Online. 21 March 2009. Archived from the original on 12 May 2011. Retrieved 26 May 2010.
  20. ^ Balogh, Stefanie (27 July 2010). "Gillard fast-tracks the $1.15 billion Redcliffe rail connection linking Petrie to Kippa-Ring". The Courier Mail. Archived from the original on 12 June 2012. Retrieved 24 November 2010.
  21. ^ Moore, Tony (3 December 2010). "Moreton Bay Rail Link remains on track". The Brisbane Times (Fairfax Media). Retrieved 3 December 2010.
  22. ^ AAP (1 August 2013). "Thiess to lead Brisbane rail project". The Australian. Archived from the original on 1 August 2013. Retrieved 1 August 2013.
  23. ^ "Statement on Moreton Bay Rail Link Project" (Text). Minister for Transport. 30 May 2016. Archived from the original on 30 June 2016. Retrieved 30 May 2016.
  24. ^ "Signalling faults delay Moreton Bay Rail Link" (Text). ABC News. 30 May 2016. Archived from the original on 2 June 2016. Retrieved 30 May 2016.
  25. ^ "Qld's Moreton Bay rail to open in October" (Text). News.com.au. 31 August 2016. Archived from the original on 31 August 2016. Retrieved 31 August 2016.
  26. ^ "Queensland Rail apologises over train cancellations" (Text). ABC News. 21 October 2016. Archived from the original on 3 November 2016. Retrieved 1 November 2016.
  27. ^ "Former QR boss Helen Gluer receives almost $160000 payout" (Text). ABC News. 1 November 2016. Archived from the original on 2 November 2016. Retrieved 1 November 2016.
  28. ^ Templeton, Anthony; Vogler, Sarah (6 February 2017). "Queensland rail report warns of cancellations, risk to Gold Coast Commonwealth Games". The Courier Mail. Retrieved 9 June 2017.
  29. ^ Templeton, Anthony; Vogler, Sarah (6 February 2017). "Transport Minister Stirling Hinchliffe resigns". The Courier Mail. Archived from the original on 8 February 2017. Retrieved 9 June 2017.
  30. ^ "TMR MBRL". Moreton Bay Rail Link. Queensland Government, Department of Transport and Main Roads. 15 June 2012. Archived from the original on 28 July 2014. Retrieved 15 August 2014.
  31. ^ "Redcliffe Peninsula Line timetable". Translink. 2 March 2020.
[edit]