Jump to content

Görlitz–Dresden railway: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
m correction of diagram
Adding local short description: "Railway line in Germany", overriding Wikidata description "German railway line"
 
(16 intermediate revisions by 10 users not shown)
Line 1: Line 1:
{{Short description|Railway line in Germany}}
{{Infobox rail line
{{Infobox rail line
| name = Görlitz–Dresden-Neustadt
| name = Görlitz–Dresden-Neustadt
Line 7: Line 8:
| maxincline = 1.9%
| maxincline = 1.9%
| minradius = {{convert|429|m|ft|0|abbr=on}}
| minradius = {{convert|429|m|ft|0|abbr=on}}
| el = <small>DD-Klotzsche–DD-Neustadt:</small><br /> [[15 kV AC railway electrification|15 kV/16.7 Hz]] AC overhead catenary
| electrification = <small>DD-Klotzsche–DD-Neustadt:</small><br /> [[15 kV AC railway electrification|15 kV/16.7 Hz]] AC overhead catenary
| speed = {{convert|120|km/h|mph|1|abbr=on}} (maximum)
| speed = {{convert|120|km/h|mph|1|abbr=on}} (maximum)
| image = <!--Streckenkarte Dresden-Görlitz.png-->
| image = Map-of-6212-Görlitz-Dresden.png
| image_width = 300px
| image_width = 300px
| caption = Section of the Saxon rail map of 1902
| caption =
| locale = [[Saxony]]
| locale = [[Saxony]]
| map_state=
| map_state= collapsed
| map = &#32;
| map =
{{BS-map|inline=1|map-title = Operating points and lines<ref name=Eisenbahnatlas >{{cite book|title=Eisenbahnatlas Deutschland (German railway atlas) |publisher= Schweers + Wall | year= 2009 |isbn= 978-3-89494-139-0}}</ref>|map=
{{routemap|inline=1|bottom = Source: German railway atlas<ref name=Eisenbahnatlas >{{cite book| title=Eisenbahnatlas Deutschland| trans-title=German railway atlas| publisher=Schweers + Wall| year=2009| isbn=978-3-89494-139-0|pages=60, 61, 73}}</ref>{{page needed|date=September 2017}}|map=
{{BS|STR|||[[Węgliniec–Görlitz railway|from (Wrocław–) Węgliniec]] and [[Zgorzelec–Wałbrzych railway|from Wałbrzych]]}}
STR~~ ~~ ~~[[Węgliniec–Görlitz railway|from (Wrocław–) Węgliniec]] and [[Zgorzelec–Wałbrzych railway|from Wałbrzych]]
{{BS|ABZlg|||[[Görlitz–Seidenberg railway|from (Zawidów–) Hagenwerder]]}}
ABZg+r~~ ~~ ~~[[Görlitz–Zawidów railway|from (Zawidów–) Hagenwerder]]
{{BS|BHF|0.000|[[Görlitz station|Görlitz]]||221 m}}
BHF~~0.000~~[[Görlitz station|Görlitz]]~~ ~~221 m
{{BS|ABZrf|||[[Schlauroth marshalling yard|to Schlauroth yard–Schlauroth junction]]}}
ABZgr~~ ~~ ~~[[Schlauroth marshalling yard|to Schlauroth yard–Schlauroth junction]]
{{BS|ABZrf|||[[Berlin–Görlitz railway|to Berlin Görlitzer Bf]]}}
ABZgr~~ ~~ ~~[[Berlin–Görlitz railway|to Berlin Görlitzer Bf]]
{{BS|BRÜCKE2|0.60{{0}}||[[Bundesstraße 99]] bridge (30 m)}}
BRÜCKE2~~0.60{{0}}~~ ~~[[Bundesstraße 99]] bridge (30 m)
{{BS|BRÜCKE2|1.20{{0}}||Rauschwalder Straße bridge (40 m)}}
BRÜCKE2~~1.20{{0}}~~ ~~Rauschwalder Straße bridge (40 m)
{{BS|HST|3.15{{0}}|Görlitz-Rauschwalde|since 1999|225 m}}
HST~~3.15{{0}}~~Görlitz-Rauschwalde~~since 1999~~225 m
{{BS|eHST|3.904|Schlauroth Hp|1907–1999|234 m}}
eHST~~3.904~~Schlauroth Hp~~1907–1999~~234 m
{{BS|eHST|4.185|Schlauroth|until 1907|234 m}}
eHST~~4.185~~Schlauroth~~until 1907~~234 m
{{BS|eABZlg|||[[Schlauroth marshalling yard|from Görlitz–Schlauroth yard]]}}
eABZg+r~~ ~~ ~~[[Schlauroth marshalling yard|from Görlitz–Schlauroth yard]]
{{BS|eBST|4.260|Schlauroth junction}}
eBST~~4.260~~Schlauroth junction
{{BS|BRÜCKE2|4.285||Görlitzer Straße LC (12 m) state road 125}}
BRÜCKE2~~4.285~~ ~~Görlitzer Straße LC (12 m) state road 125
{{BS|eBST|6.90{{0}}|Markersdorf (Bk)||245 m}}
eBST~~6.90{{0}}~~Markersdorf (Bk)~~ ~~245 m
{{BS|BRÜCKE2|8.35{{0}}||Friedersdorfer Wasser bridge (15 m)}}
BRÜCKE2~~8.35{{0}}~~ ~~Friedersdorfer Wasser bridge (15 m)
{{BS|HST|9.85{{0}}||Gersdorf b Görlitz||250 m}}
HST~~9.85{{0}}~~ ~~Gersdorf b Görlitz
{{BS|BRÜCKE2|9.943||Gersdorf bridge (20 m)}}
BRÜCKE2~~9.943~~ ~~Gersdorf bridge (20 m)
{{BS|BHF|14.04{{0}}|[[Reichenbach (Oberlausitz)|Reichenbach (OL)]]||250 m}}
BHF~~14.04{{0}}~~[[Reichenbach (Oberlausitz)|Reichenbach (OL)]]~~ ~~250 m
{{BS|STR+GRZq|14.85{{0}}||former Saxony–[[Prussia]] national border}}
STR+GRZq~~14.85{{0}}~~ ~~former [[Prussia]]–Saxony national border
{{BS|BRÜCKE2|15.550||[[Sohland am Rotstein|Sohland]] bridge (32 m)}}
BRÜCKE2~~15.550~~ ~~[[Sohland am Rotstein|Sohland]] bridge (32 m)
{{BS|HST|17.67{{0}}|Zoblitz||243 m}}
HST~~17.67{{0}}~~Zoblitz~~ ~~243 m
{{BS|BRÜCKE2|19.9{{0}}{{0}}||Rosenhainer Wasser bridge (30 m)}}
BRÜCKE2~~19.9{{0}}{{0}}~~ ~~Rosenhainer Wasser bridge (30 m)
{{BS|eBST|20.48{{0}}|Bk Rosenhain||245 m}}
eBST~~20.48{{0}}~~Bk Rosenhain~~ ~~245 m
{{BS|eHST|23.6{{0}}{{0}}|[[Löbau]] (Sachs) Ost|1945 only|260 m}}
eHST~~23.6{{0}}{{0}}~~[[Löbau]] (Sachs) Ost~~1945 only~~260 m
{{BS|WBRÜCKE|23.809||[[Löbau viaduct]] (190 m), [[Löbauer Wasser]]}}
hKRZWae~~23.809~~ ~~[[Löbau viaduct]] (190 m), [[Löbauer Wasser]]
{{BS|BHF|24.230|[[Löbau (Sachs) station|Löbau (Sachs)]]||263 m}}
BHF~~24.230~~[[Löbau (Sachs) station|Löbau (Sachs)]]~~ ~~263 m
{{BS|ABZlf|||[[Ebersbach–Löbau railway|to Ebersbach (Sachs)]] and [[Löbau–Zittau railway|to Zittau]]}}
ABZgl~~ ~~ ~~[[Ebersbach–Löbau railway|to Ebersbach (Sachs)]] and [[Zittau–Löbau railway|to Zittau]]
{{BS|eABZlf|||[[Großpostwitz–Löbau railway|to Großpostwitz]]}}
eABZgl~~ ~~ ~~[[Großpostwitz–Löbau railway|to Großpostwitz]]
{{BS|eABZrf|||[[Löbau–Radibor railway|to Radibor (Sachs)]]}}
eABZgr~~ ~~ ~~[[Löbau–Radibor railway|to Radibor (Sachs)]]
{{BS|eBST|27.26{{0}}|Laucha (Bk)||}}
eBST~~27.26{{0}}~~Laucha (Bk)
{{BS|HST|30.443|Breitendorf||259 m}}
HST~~30.443~~Breitendorf~~ ~~259 m
{{BS|BRÜCKE|33.762||Kupritz Viaduct (96 m; Niethener Viaduct)}}
hSTRae~~33.762~~ ~~Kupritz Viaduct (96 m; Niethener Viaduct)
{{BS|BHF|34.562|Pommritz||237 m}}
BHF~~34.562~~Pommritz~~ ~~237 m
{{BS|HST|39.477|[[Kubschütz]]||225 m}}
HST~~39.477~~[[Kubschütz]]~~ ~~225 m
{{BS|eBST|43.05{{0}}|Falkenberg (Bk)||}}
eBST~~43.05{{0}}~~Falkenberg (Bk)
{{BS|eABZrg|||[[Bautzen–Bad Schandau railway|from Bad Schandau]]}}
eABZg+l~~ ~~ ~~[[Bautzen–Bad Schandau railway|from Bad Schandau]]
{{BS|ABZg+nl|||[[Bombardier Transportation]] siding}}
ABZg+nl~~ ~~ ~~[[Bombardier Transportation]] siding
{{BS|BHF|45.912|[[Bautzen station|Bautzen]]||203 m}}
BHF~~45.912~~[[Bautzen railway station|Bautzen]]~~ ~~203 m
{{BS|WBRÜCKE|46.661||[[Spree]] viaduct (225 m)}}
hKRZWae~~46.661~~ ~~[[Spree (river)|Spree]] viaduct (225 m)
{{BS|eBST|47.870|Stiebitz junction (Bk)||210 m}}
eBST~~47.870~~Stiebitz junction (Bk)~~ ~~210 m
{{BS|eABZrf|47.905||[[Bautzen–Hoyerswerda railway|to Hoyerswerda]]}}
eABZgr~~47.905~~ ~~[[Bautzen–Hoyerswerda railway|to Hoyerswerda]]
{{BS|eBST|51.00{{0}}|Grubschütz junction (Bk)||224 m}}
eBST~~51.00{{0}}~~Grubschütz junction (Bk)~~ ~~224 m
{{BS|HST|53.996|[[Göda|Seitschen]]||241 m}}
HST~~53.996~~[[Göda|Seitschen]]~~ ~~241 m
{{BS|eBST|56.68{{0}}|Zockau (Bk)||}}
eBST~~56.68{{0}}~~Zockau (Bk)
{{BS|eABZg+nl|||Demitz-Thumitz granite works siding}}
eABZg+nl~~ ~~ ~~Demitz-Thumitz granite works siding
{{BS|BRÜCKE2|||Naundorfer Wasser bridge|238 m}}
BRÜCKE2~~ ~~ ~~Naundorfer Wasser bridge~~238 m
{{BS|BRÜCKE|59.856||Demitz viaduct (220 m), [[Hoyerswerdaer Schwarzwasser|Schwarzwasser]]}}
hSTRae~~59.856~~ ~~Demitz viaduct (220 m), [[Hoyerswerdaer Schwarzwasser|Schwarzwasser]]
{{BS|HST|60.323|[[Demitz-Thumitz]]||264 m}}
HST~~60.323~~[[Demitz-Thumitz]]~~ ~~264 m
{{BS|eABZlg|||[[Kamenz–Bischofswerda railway|from Kamenz (Sachs)]]}}
eABZg+r~~ ~~ ~~[[Kamenz–Bischofswerda railway|from Kamenz (Sachs)]]
{{BS|ABZrg|||[[Neukirch West–Bischofswerda railway|from Neukirch (Lausitz) West]]}}
ABZg+l~~ ~~ ~~[[Neukirch West–Bischofswerda railway|from Neukirch (Lausitz) West]]
{{BS|BHF|64.932|[[Bischofswerda railway station|Bischofswerda]]||288 m}}
BHF~~64.932~~[[Bischofswerda railway station|Bischofswerda]]~~ ~~288 m
{{BS|HST|67.85{{0}}|Weickersdorf (Sachs)||280 m}}
HST~~67.85{{0}}~~Weickersdorf (Sachs)~~ ~~280 m
{{BS|eBST|70.69{{0}}|Kleindrebnitz (Bk)||}}
eBST~~70.69{{0}}~~Kleindrebnitz (Bk)
{{BS|BRÜCKE2|71.370||[[Wesenitz]] bridge (34 m)}}
BRÜCKE2~~71.370~~ ~~[[Wesenitz]] bridge (34 m)
{{BS|HST|72.48{{0}}|Großharthau||281 m}}
HST~~72.48{{0}}~~Großharthau~~ ~~281 m
{{BS|eBST|75.71{{0}}|Seeligstadt (Bk)||}}
eBST~~75.71{{0}}~~Seeligstadt (Bk)
{{BS|eBHF|78.41{{0}}|[[Arnsdorf|Fischbach]]|until 1877|257 m}}
eBHF~~78.41{{0}}~~[[Arnsdorf|Fischbach]]~~until 1877~~257 m
{{BS|eBST|78.47{{0}}|Fischbach (Bk)||}}
eBST~~78.47{{0}}~~Fischbach (Bk)
{{BS|eABZrg|||[[Kamenz–Pirna railway|from Pirna]]}}
eABZg+l~~ ~~ ~~[[Kamenz–Pirna railway|from Pirna]]
{{BS|BHF|80.196|[[Arnsdorf bei Dresden station|Arnsdorf (Dresden)]]|since 1875|250 m}}
BHF~~80.196~~[[Arnsdorf bei Dresden station|Arnsdorf (Dresden)]]~~since 1875~~250 m
{{BS|ABZgr+r|||[[Kamenz–Pirna railway|to Kamenz]]}}
ABZgr+r~~ ~~ ~~[[Kamenz–Pirna railway|to Kamenz]]
{{BS|BRÜCKE2|83.089||Rödertal bridge (67 m)}}
BRÜCKE2~~83.089~~ ~~Rödertal bridge (67 m)
{{BS|BRÜCKE2|83.220||Rödertal bridge (57 m)}}
BRÜCKE2~~83.220~~ ~~Rödertal bridge (57 m)
{{BS|eBST|83.28{{0}}|[[Kleinwolmsdorf]]||}}
eBST~~83.28{{0}}~~[[Kleinwolmsdorf]]
{{BS|BRÜCKE2|83.884||Rödertal bridge (32 m)}}
BRÜCKE2~~83.884~~ ~~Rödertal bridge (32 m)
{{BS|BHF|85.566|[[Radeberg]]||243 m}}
BHF~~85.566~~[[Radeberg railway station|Radeberg]]~~ ~~243 m
{{BS|eBST|87.65{{0}}|Lotzdorf (Bk)||}}
eBST~~87.65{{0}}~~Lotzdorf (Bk)
{{BS|HST|90.82{{0}}|Langebrück (Sachs)||222 m}}
HST~~90.82{{0}}~~Langebrück (Sachs)~~ ~~222 m
{{BS|eBST|92.81{{0}}|[[Dresden Heath|Heide]] (Bk)||}}
eBST~~92.81{{0}}~~[[Dresden Heath|Heide]] (Bk)
{{BS|ABZlg|||[[Dresden–Straßgräbchen-Bernsdorf railway|from Straßgräbchen-Bernsdorf]]}}
ABZg+r~~ ~~ ~~[[Dresden–Straßgräbchen-Bernsdorf railway|from Straßgräbchen-Bernsdorf]]
{{BS|BST|94.0{{0}}{{0}}|Dresden-Klotzsche Bbf W4}}
BST~~94.0{{0}}{{0}}~~Dresden-Klotzsche Bbf W4
{{BS|ABZlg|||[[Dresden-Klotzsche–Dresden Airport railway|from Dresden Airport]]}}
ABZg+r~~ ~~ ~~[[Dresden-Klotzsche–Dresden Airport railway|from Dresden Airport]]
{{BS|DST|94.6{{0}}{{0}}|Dresden-Klotzsche Bbf}}
DST~~94.6{{0}}{{0}}~~Dresden-Klotzsche Bbf
{{BS|BHF|95.400|[[Dresden-Klotzsche railway station|Dresden-Klotzsche]]||191 m}}
BHF~~95.400~~[[Dresden-Klotzsche railway station|Dresden-Klotzsche]]~~ ~~191 m
{{BS|BRÜCKE2|95.480||Nesselgrund bridge (60 m)}}
BRÜCKE2~~95.480~~ ~~Nesselgrund bridge (60 m)
{{BS|eBST|98.12{{0}}|[[Hellerau]] (Bk)||}}
eBST~~98.12{{0}}~~[[Hellerau]] (Bk)
{{BS|HST|99.23{{0}}|[[Dresden Industriegelände railway station|Dresden Industriegelände]]||152 m}}
HST~~99.23{{0}}~~[[Dresden Industriegelände railway station|Dresden Industriegelände]]~~ ~~152 m
{{BS|eABZrg|||from Dresden-Albertstadt}}
eABZg+l~~ ~~ ~~from Dresden-Albertstadt
{{BS|eBST|100.425|Albertstadt (Bk)||}}
eBST~~100.425~~Albertstadt (Bk)
{{BS|eABZrf|||to Dresden-Neustadt freight yard}}
eABZgr~~ ~~ ~~to Dresden-Neustadt freight yard
{{BS|ABZlg|||[[Leipzig–Dresden railway|from Leipzig Hbf]]}}
ABZg+r~~ ~~ ~~[[Leipzig–Dresden railway|from Leipzig Hbf]]
{{BS|BHF|102.100|[[Dresden-Neustadt station|Dresden-Neustadt]]||118 m}}
BHF~~102.100~~[[Dresden-Neustadt station|Dresden-Neustadt]]~~ ~~118 m
{{BS|STR|||[[Dresden–Děčín railway|Děčín–Dresden Hbf]]}}
STR~~ ~~ ~~[[Děčín–Dresden-Neustadt railway|Děčín–Dresden Hbf]]
}}
}}
}}
}}
Line 109: Line 110:
[[File:Bahnhof Bautzen Gleise.jpg|left|thumb|[[Bautzen station]]]]
[[File:Bahnhof Bautzen Gleise.jpg|left|thumb|[[Bautzen station]]]]
[[File:RE-Dresden-Görlitz-in-Dresden-Neustadt.JPG|left|thumb|Dresden-Görlitz [[Regional-Express]] in [[Dresden-Neustadt station]]]]
[[File:RE-Dresden-Görlitz-in-Dresden-Neustadt.JPG|left|thumb|Dresden-Görlitz [[Regional-Express]] in [[Dresden-Neustadt station]]]]
A treaty between [[Prussia]] and [[Kingdom of Saxony|Saxony]] signed on 24 July 1843 authorised the construction of a cross-border railway and its proposed connection to the [[Lower Silesian-Markish Railway]] from Görlitz to [[Węgliniec]] (Kohlfurt) was the first step in the building of the railway between Dresden and Görlitz. The treaty required that construction of the line be finished within four years. The ''Saxon-Silesian Railway Company'' ({{lang-de|Sächsisch-Schlesische Eisenbahngesellschaft}}) was established for the construction of the line, with capital of six million [[Prussian thaler|thalers]]. The Saxon government owned a third of the company. The Saxon government required the company to build [[Löbau–Zittau railway|a branch from Löbau to Zittau]].<ref name=Rettig62>Rettig, 1994, p. 62</ref>
A treaty between [[Prussia]] and [[Kingdom of Saxony|Saxony]] signed on 24 July 1843 authorised the construction of a cross-border railway and its proposed connection to the [[Lower Silesian-Markish Railway]] company's line from Görlitz to [[Węgliniec]] (Kohlfurt), which was the first step in the building of a railway between Dresden and Görlitz. The treaty required the construction of the line to be finished within four years. The ''Saxon-Silesian Railway Company'' ({{lang-de|Sächsisch-Schlesische Eisenbahngesellschaft}}) was established for the construction of the line, with capital of six million [[Prussian thaler|thalers]]. The Saxon government owned a third of the company. The Saxon government required the company to build [[Zittau–Löbau railway|a branch from Löbau to Zittau]].{{sfn|Rettig|1994|p=62}}


The construction began on 10 May 1844 and the first section to Radeberg was opened to traffic on 17 November 1845. The line was extended to Bischofswerda on 21 December 1845, to Bautzen on 23 June 1846 and to Löbau on 23 December 1846. A test run from Bautzen on 16 December 1846 was stuck in heavy snow drifts in a cutting in Rabitz, just four kilometres beyond Bautzen. On the Prussian side, construction of earthworks began at Reichenbach in October 1845. Up to 800 men worked simultaneously on the section between Reichenbach and Gersdorf, but the snowy winter of 1846/47 brought work to take a stop. A test run between Löbau and Reichenbach was held on 29 April 1847 and the section was opened on 1 July of that year. The 102.2&nbsp;km long line from Görlitz to Dresden was formally opening on 1 September 1847, along with the line from Görlitz to Węgliniec.<ref name=Rettig62/>
The construction began on 10 May 1844 and the first section from Dresden to Radeberg was opened to traffic on 17 November 1845. The line was extended to Bischofswerda on 21 December 1845, to Bautzen on 23 June 1846 and to Löbau on 23 December 1846. A test run from Bautzen on 16 December 1846 was stuck in heavy snow drifts in a cutting in Rabitz, just four kilometres beyond Bautzen. On the Prussian side, construction of earthworks began at Reichenbach in October 1845. Up to 800 men worked simultaneously on the section between Reichenbach and Gersdorf, but the snowy winter of 1846/47 brought work to take a stop. A test run between Löbau and Reichenbach was held on 29 April 1847 and the section was opened on 1 July of that year. The 102.2&nbsp;km long line from Görlitz to Dresden was formally opening on 1 September 1847, along with the line from Görlitz to Węgliniec.{{sfn|Rettig|1994|p=62}}


For nearly 20 years the railway line was controlled by the Saxon government. Following the [[Austro-Prussian War]] of 1866, Saxony ceded control of the railway to Prussia, as Saxony had fought the war on the side of the loser, Austria. In 1867 Prussia took over the operations of the Saxon-Silesian Railway Company.<ref>Rettig, 1994, p. 62f</ref>
For nearly 20 years the railway line was controlled by the Saxon government. Following the [[Austro-Prussian War]] of 1866, in which Saxony had fought on the Austrian side, and the [[Peace of Prague (1866)|Peace of Prague]], Saxony ceded ownership of the railway section located in Prussia to Prussia, but continued to operate the whole line on a contractual basis.{{sfn|Rettig|1994|pp=62f}}


===In the Second World War ===
===In the Second World War ===
With the outbreak of the [[Second World War]] on 1 September 1939, restrictions were soon imposed on the right of the public to travel on trains.<ref>Von Polenz, 2006, p. 141f</ref>
With the outbreak of the [[Second World War]] on 1 September 1939, restrictions were soon imposed on the right of the public to travel on trains.{{sfn|von Polenz|2006|pp=141f}}


In April 1945 the line became heavily used for the passage of refugees, especially from [[Silesia]], and the retreating [[Wehrmacht]]. All military trains had first priority on the line, often preventing the movement of trains carrying refugee and the wounded for days. On 16 April the [[Eastern Front (World War II)|Eastern Front]] reached the [[Neisse]] river and the spearhead of the [[Red Army|Soviet]] 52nd Army reached the edge of [[Bautzen]] on 19 April. On 20 April the 52nd Soviet army began [[Battle of Bautzen (1945)|an attack]] on the defences of the Wehrmacht and the [[Volkssturm]] in the town centre. The German army held the Soviets off, but the Soviets broke through to the centre of the town on 24 April and heavy street fighting took place around [[Bautzen station]]. The last refugee train ran on the morning of 20 April from Bautzen towards [[Bischofswerda]]. As a result of the fighting on 24 April, the station building was completely destroyed. After the end of the war on 9 May 1945, almost all of the line was unusable, since all the bridges between Görlitz and Bautzen had been blown up or otherwise destroyed by the German Army on 7 May 1945, including the Neisse viaduct in Görlitz, the rail bridge in [[Löbau]] and the [[Spree]] viaduct in Bautzen. Furthermore, the line also lacked rolling stock, as many locomotives had been moved to the west.<ref>Von Polenz, 2006, p. 144</ref><ref>Rettig, 1994, p. 63</ref>
In April 1945 the line became heavily used for the passage of refugees, especially from [[Silesia]], and the retreating [[Wehrmacht]]. All military trains had first priority on the line, often preventing the movement of trains carrying refugee and the wounded for days. On 16 April the [[Eastern Front (World War II)|Eastern Front]] reached the [[Neisse]] river and the spearhead of the [[Red Army|Soviet]] 52nd Army reached the edge of [[Bautzen]] on 19 April. On 20 April the 52nd Soviet army began [[Battle of Bautzen (1945)|an attack]] on the defences of the Wehrmacht and the [[Volkssturm]] in the town centre. The German army held the Soviets off, but the Soviets broke through to the centre of the town on 24 April and heavy street fighting took place around [[Bautzen station]]. The last refugee train ran on the morning of 20 April from Bautzen towards [[Bischofswerda]]. As a result of the fighting on 24 April, the station building was completely destroyed. After the end of the war on 9 May 1945, almost all of the line was unusable, since all the bridges between Görlitz and Bautzen had been blown up or otherwise destroyed by the German Army on 7 May 1945, including the Neisse viaduct in Görlitz, the rail bridge in [[Löbau]] and the [[Spree (river)|Spree]] viaduct in Bautzen. Furthermore, the line also lacked rolling stock, as many locomotives had been moved to the west.{{sfn|von Polenz|2006|p=144}}{{sfn|Rettig|1994|p=63}}


===Reconstruction after the Second World War ===
===Reconstruction after the Second World War ===
The reconstruction of the viaducts proved to be especially difficult, therefore travellers often had to change train. New stations were established, for example, Löbau Ost station opened at the eastern end of the Löbau viaduct on 6 August 1945 for a shuttle service from Görlitz. According to the timetable of November 1945, travellers from Görlitz had to take a two km walk from Löbau Ost to Löbau station. Numerous temporary bridges were built. The temporary bridge in Bautzen was completed in September 1945 and it was followed in October by the temporary Demitz viaduct. After the completion of temporary bridges at [[Kubschütz|Blösa]] (6 November 1945) and Löbau (10 November), a continuous train service officially resumed between Görlitz and [[Dresden-Neustadt station|Dresden-Neustadt]]. Most of the temporary bridges were continuously monitored by so-called "bridge guards" of the transport police. Probably in anticipation of the subsequent dismantling of the second track, the temporary bridges were built for one track only.<ref>Rettig, 1994, p. 66</ref><ref>Von Polenz, 2006, p. 146</ref>
The reconstruction of the viaducts proved to be especially difficult, therefore travellers often had to change train. New stations were established, for example, Löbau Ost station opened at the eastern end of the Löbau viaduct on 6 August 1945 for a shuttle service from Görlitz. According to the timetable of November 1945, travellers from Görlitz had to take a two km walk from Löbau Ost to Löbau station. Numerous temporary bridges were built. The temporary bridge in Bautzen was completed in September 1945 and it was followed in October by the temporary Demitz viaduct. After the completion of temporary bridges at [[Kubschütz|Blösa]] (6 November 1945) and Löbau (10 November), a continuous train service officially resumed between Görlitz and [[Dresden-Neustadt station|Dresden-Neustadt]]. Most of the temporary bridges were continuously monitored by so-called "bridge guards" of the transport police. Probably in anticipation of the subsequent dismantling of the second track, the temporary bridges were built for one track only.{{sfn|Rettig|1994|p=66}}{{sfn|von Polenz|2006|p=146}}


In March 1946 work began on removing one track between Dresden and Görlitz to provide [[War reparations|reparations]] to the [[Soviet Union]]. Stations left with crossing loops included Breitendorf, Pommritz, Kubschütz and Seitschen stations.<ref>Von Polenz, 2006, p. 145ff</ref>
In March 1946 work began on removing one track between Dresden and Görlitz to provide [[War reparations|reparations]] to the [[Soviet Union]]. Stations left with crossing loops included Breitendorf, Pommritz, Kubschütz and Seitschen stations.{{sfn|von Polenz|2006|pp=145ff}}


===Normalisation in the 1970s and 1980s ===
===Normalisation in the 1970s and 1980s ===
In 1970, the second track was restored between Dresden-Klotsche and Bautzen. This was followed in later years by the restoration of the Bautzen–Breitendorf, Reichenbach–Gersdorf and Markersdorf–Schlauroth marshalling yard sections. Between 1980 and 1984, the Gersdorf–Markersdorf and Löbau–Zoblitz sections regained their second track. One reason for the restoration of the track was increasing coal freight traffic. Single track remained until 1993 or 2000 only on the sections between Breitendorf and Löbau and between Schlauroth and Gorlitz. In 1975 there were nine pairs of express trains, six of which ran to or from Poland. Travel time was a minimum of 92 minutes, only seven minutes less than in 1905.<ref>Rettig, 1994, pp. 62, 70</ref>
In 1970, the second track was restored between Dresden-Klotzsche and Bautzen. This was followed in later years by the restoration of the Bautzen–Breitendorf, Reichenbach–Gersdorf and Markersdorf–Schlauroth marshalling yard sections. Between 1980 and 1984, the Gersdorf–Markersdorf and Löbau–Zoblitz sections regained their second track. One reason for the restoration of the track was increasing coal freight traffic. Single track remained until 1993 or 2000 only on the sections between Breitendorf and Löbau and between Schlauroth and Görlitz. In 1975 there were nine pairs of express trains, six of which ran to or from Poland. Travel time was a minimum of 92 minutes, only seven minutes less than in 1905.{{sfn|Rettig|1994|pp=62, 70}}


===After the political changes in East Germany in 1989 ===
===After the political changes in East Germany in 1989 ===
After the political changes in Eastern Germany in 1989, reconstruction of the second track was accelerated. On 16 October 1994, the last remaining significant section of the line between Breitendorf and Löbau was restored to two tracks. Single track initially remained on short section of line between Schlauroth junction and Görlitz. During the reconstruction of the Görlitz node in 2000 this was reconstructed as double track. On 25 June 2000, two track operations commenced.<ref>{{cite web|title=Mehrgleisiger Streckenausbau in Sachsen |url=http://www.sachsenschiene.de/index.htm?http://www.sachsenschiene.de/spe/pag_spe01.shtml$http://www.google.de/url?sa=t&source=web&cd=1&ved=0CBYQFjAA&url=https%3A%2F%2Frp.liu233w.com%3A443%2Fhttp%2Fwww.sachsenschiene.de%2Fspe%2Fpag_spe01.shtml&rct=j&q=streckenausbau+dresden+g%C3%B6rlitz&ei=yAESTKSnJZKSOLfM4aEI&usg=AFQjCNFAocrL7147NhLMMzfQwM9G7VUZ0A|publisher=Eissenbahnen in Sachsen| accessdate=27 August 2010 |language=German}}</ref>
After the political changes in Eastern Germany in 1989, reconstruction of the second track was accelerated. On 16 October 1994, the last remaining significant section of the line between Breitendorf and Löbau was restored to two tracks. Single track initially remained on short section of line between Schlauroth junction and Görlitz. During the reconstruction of the Görlitz node in 2000 this was reconstructed as double track. On 25 June 2000, two track operations commenced.<ref>{{cite web| title=Mehrgleisiger Streckenausbau in Sachsen |url=http://www.sachsenschiene.de/index.htm?http://www.sachsenschiene.de/spe/pag_spe01.shtml$http://www.google.de/url?sa=t&source=web&cd=1&ved=0CBYQFjAA&url=https%3A%2F%2Frp.liu233w.com%3A443%2Fhttp%2Fwww.sachsenschiene.de%2Fspe%2Fpag_spe01.shtml&rct=j&q=streckenausbau+dresden+g%C3%B6rlitz&ei=yAESTKSnJZKSOLfM4aEI&usg=AFQjCNFAocrL7147NhLMMzfQwM9G7VUZ0A| website=Eissenbahnen in Sachsen| accessdate=27 August 2010 |language=German}}</ref>


The former express service between Dresden and Görlitz was replaced in the late 1990s by [[InterRegio]] trains. Services stopping in Bautzen, Görlitz and Löbau ran every two hours. With the progressive abolition of InterRegio trains, this service was replaced by three pairs of trains, which reversed in Görlitz to continue to Wroclaw. On 11 December 2004, long-distance trains were discontinued altogether on this line. Since then, the Dresden–Görlitz line has only been served by regional trains.
The former express service between Dresden and Görlitz was replaced in the late 1990s by [[InterRegio]] trains. Services stopping in Bautzen, Görlitz and Löbau ran every two hours. With the progressive abolition of InterRegio trains, this service was replaced by three pairs of trains, which reversed in Görlitz to continue to Wroclaw. On 11 December 2004, long-distance trains were discontinued altogether on this line. Since then, the Dresden–Görlitz line has only been served by regional trains.


In 2002 electrical contact wire was installed on the short section between Dresden-Neustadt and Dresden-Klotzsche for the [[Dresden S-Bahn|S-Bahn]] service to [[Dresden Airport]].
In 2002 electrical contact wire was installed on the short section between Dresden-Neustadt and Dresden-Klotzsche for the [[Dresden S-Bahn|S-Bahn]] service to [[Dresden Flughafen station|Dresden Airport]].
In 2003, a German–Polish agreement was signed on cooperation to improve rail links. As part of this agreement, it was agreed to upgrade the Polish border–Görlitz–Dresden section to allow speeds of 120–160&nbsp;km/h, with long-term electrification. This is intended to reduce travel times for [[EuroCity]] and [[Intercity (Deutsche Bahn)|InterCity]] trains with traditional railway vehicles to about 3 hours 45 minutes between Dresden and Wroclaw. The implementation of these measures depends on funding.<ref>{{cite web|title=Agreement between Germany and Poland of railway services |url=http://www.wedebruch.de/gesetze/inter/d_pl300403.htm |publisher=German Ministry of Transport, Building and Housing| accessdate=27 August 2010 |language=German}}</ref> This work has not yet started.
In 2003, a German–Polish agreement was signed on cooperation to improve rail links. As part of this agreement, it was agreed to upgrade the Polish border–Görlitz–Dresden section to allow speeds of 120–160&nbsp;km/h, with long-term electrification. This is intended to reduce travel times for [[EuroCity]] and [[Intercity (Deutsche Bahn)|InterCity]] trains with traditional railway vehicles to about 3 hours 45 minutes between Dresden and Wroclaw. The implementation of these measures depends on funding.<ref>{{cite web|title=Agreement between Germany and Poland of railway services |url=http://www.wedebruch.de/gesetze/inter/d_pl300403.htm |publisher=German Ministry of Transport, Building and Housing| accessdate=27 August 2010 |language=German}}</ref> This work has not yet started.


==Operations ==
==Operations==
The Dresden–Görlitz line traffic is currently served by regional transport only. Trains on the line are managed by the [[Verkehrsverbund Oberelbe]] (''Upper Elbe Transport Authority'') and the [[Verkehrsverbund Oberlausitz-Niederschlesien]] (''Upper Lusatia–Lower Silesia Transport Authority''). A few services are provided under a contract awarded in December 2008 to [[Ostdeutsche Eisenbahn]] and operated as line OE60V. All other services are operated by [[DB Regio]].
The Görlitz–Dresden line traffic is served by regional transport only. Trains on the line are managed by the [[Verkehrsverbund Oberelbe]] (''Upper Elbe Transport Authority'') and the [[Verkehrsverbund Oberlausitz-Niederschlesien]] (''Upper Lusatia–Lower Silesia Transport Authority''). A few services are provided under a contract awarded in December 2008 to [[Ostdeutsche Eisenbahn]] and operated as line OE60V. From March 2009 to December 2014, three pairs of regional trains each day were operated between Dresden and [[Wrocław Główny railway station|Wrocław Główny]] by [[DB Regio]]. Since then services have been provided by [[Vogtlandbahn]] and [[Koleje Dolnośląskie]], but were interrupted for a few months in 2015.
Since March 2009, three pairs of regional trains each day have been operated commercially between Dresden and Wrocław by [[Deutsche Bahn]].


The following table shows regional services that use all or part of the Dresden–Görlitz line (March 2009):
The following table shows regional services that use all or part of the Görlitz–Dresden line (May 2017):


{| class="wikitable float-left"
{| class="wikitable float-left"
Line 150: Line 150:
! Remarks
! Remarks
|-
|-
| RE1 || Dresden–Bischofswerda–Görlitz || 120 ||
| RE1 || Dresden – Bischofswerda – Görlitz || 120 || 3x daily to Wrocław
|-
|-
| RE2 || Dresden – Bischofswerda (– [[Zittau railway station|Zittau]] – [[Liberec]]) || 120 ||
| RE100 || Dresden–Görlitz–Wrocław || – || 3x daily
|-
| RE2 || Dresden–Bischofswerda–[[Zittau]] (–[[Liberec]]) || 120 ||
|-
|-
| RB33 || Dresden–[[Königsbrück]] || 60 (Sa/Su: 120) ||
| RB33 || Dresden – Dresden-Klotzsche (– [[Königsbrück railway station|Königsbrück]]) || 60 (Sa/Su: 120) ||
|-
|-
| RB34 || Dresden–[[Kamenz]] || 60 (Su: 120) ||
| RB34 || Dresden – Radeberg (– [[Kamenz railway station|Kamenz]]) || 60 (Su: 120) ||
|-
|-
| RB60 || Dresden–Bischofswerda–Görlitz || 120 ||
| RB60 || Dresden – Bischofswerda – Görlitz || 120 ||
|-
|-
| OE60V || Bischofswerda–Görlitz || 120 || Mo-Sa only
| OE60V || Bischofswerda – Görlitz || 120 || Mo-Sa only
|-
|-
| RB61 || Dresden–Bischofswerda–Zittau || 120 ||
| RB61 || Dresden – Bischofswerda (– Zittau) || 120 ||
|-
|-
| S2 || Pirna–[[Dresden Airport]] || 30 ||
| S2 || (Pirna –) Dresden-Neustadt – Dresden-Klotzsche (– [[Dresden Flughafen station|Dresden Airport]]) || 30 ||
|}
|}


Line 181: Line 179:
{{DEFAULTSORT:Dresden-Gorlitz railway}}
{{DEFAULTSORT:Dresden-Gorlitz railway}}
[[Category:Railway lines in Saxony]]
[[Category:Railway lines in Saxony]]
[[Category:Railway lines opened in 1845]]
[[Category:Buildings and structures in Dresden]]

Latest revision as of 14:49, 12 August 2024

Görlitz–Dresden-Neustadt
Overview
Line number6212
LocaleSaxony
Service
Route number230
Technical
Line length102.100 km (63.442 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Minimum radius429 m (1,407 ft)
ElectrificationDD-Klotzsche–DD-Neustadt:
15 kV/16.7 Hz AC overhead catenary
Operating speed120 km/h (74.6 mph) (maximum)
Maximum incline1.9%
Route map

0.000
Görlitz
221 m
0.600
Bundesstraße 99 bridge (30 m)
1.200
Rauschwalder Straße bridge (40 m)
3.150
Görlitz-Rauschwalde
since 1999
225 m
3.904
Schlauroth Hp
1907–1999
234 m
4.185
Schlauroth
until 1907
234 m
4.260
Schlauroth junction
4.285
Görlitzer Straße LC (12 m) state road 125
6.900
Markersdorf (Bk)
245 m
8.350
Friedersdorfer Wasser bridge (15 m)
9.850
Gersdorf b Görlitz
9.943
Gersdorf bridge (20 m)
14.040
Reichenbach (OL)
250 m
14.850
former Prussia–Saxony national border
15.550
Sohland bridge (32 m)
17.670
Zoblitz
243 m
19.900
Rosenhainer Wasser bridge (30 m)
20.480
Bk Rosenhain
245 m
23.600
Löbau (Sachs) Ost
1945 only
260 m
23.809
24.230
Löbau (Sachs)
263 m
27.260
Laucha (Bk)
30.443
Breitendorf
259 m
33.762
Kupritz Viaduct (96 m; Niethener Viaduct)
34.562
Pommritz
237 m
39.477
Kubschütz
225 m
43.050
Falkenberg (Bk)
45.912
Bautzen
203 m
46.661
Spree viaduct (225 m)
47.870
Stiebitz junction (Bk)
210 m
47.905
51.000
Grubschütz junction (Bk)
224 m
53.996
Seitschen
241 m
56.680
Zockau (Bk)
Demitz-Thumitz granite works siding
Naundorfer Wasser bridge
238 m
59.856
Demitz viaduct (220 m), Schwarzwasser
60.323
Demitz-Thumitz
264 m
64.932
Bischofswerda
288 m
67.850
Weickersdorf (Sachs)
280 m
70.690
Kleindrebnitz (Bk)
71.370
Wesenitz bridge (34 m)
72.480
Großharthau
281 m
75.710
Seeligstadt (Bk)
78.410
Fischbach
until 1877
257 m
78.470
Fischbach (Bk)
80.196
Arnsdorf (Dresden)
since 1875
250 m
83.089
Rödertal bridge (67 m)
83.220
Rödertal bridge (57 m)
83.280
Kleinwolmsdorf
83.884
Rödertal bridge (32 m)
85.566
Radeberg
243 m
87.650
Lotzdorf (Bk)
90.820
Langebrück (Sachs)
222 m
92.810
Heide (Bk)
94.000
Dresden-Klotzsche Bbf W4
94.600
Dresden-Klotzsche Bbf
95.400
Dresden-Klotzsche
191 m
95.480
Nesselgrund bridge (60 m)
98.120
Hellerau (Bk)
99.230
Dresden Industriegelände
152 m
from Dresden-Albertstadt
100.425
Albertstadt (Bk)
to Dresden-Neustadt freight yard
102.100
Dresden-Neustadt
118 m
Source: German railway atlas[1][page needed]

The Görlitz–Dresden railway is a two-track main line railway in the German state of Saxony, originally built and operated by the Saxon-Silesian Railway Company. It runs through Upper Lusatia from Dresden via Bischofswerda, Bautzen and Löbau to Görlitz. The line is part of the route from Dresden to Wrocław and Pan-European Transport Corridor III. The first section of the line opened in 1845 and it is one of the oldest lines in Germany.

History

[edit]

Construction and opening

[edit]
Görlitz station
Bautzen station
Dresden-Görlitz Regional-Express in Dresden-Neustadt station

A treaty between Prussia and Saxony signed on 24 July 1843 authorised the construction of a cross-border railway and its proposed connection to the Lower Silesian-Markish Railway company's line from Görlitz to Węgliniec (Kohlfurt), which was the first step in the building of a railway between Dresden and Görlitz. The treaty required the construction of the line to be finished within four years. The Saxon-Silesian Railway Company (German: Sächsisch-Schlesische Eisenbahngesellschaft) was established for the construction of the line, with capital of six million thalers. The Saxon government owned a third of the company. The Saxon government required the company to build a branch from Löbau to Zittau.[2]

The construction began on 10 May 1844 and the first section from Dresden to Radeberg was opened to traffic on 17 November 1845. The line was extended to Bischofswerda on 21 December 1845, to Bautzen on 23 June 1846 and to Löbau on 23 December 1846. A test run from Bautzen on 16 December 1846 was stuck in heavy snow drifts in a cutting in Rabitz, just four kilometres beyond Bautzen. On the Prussian side, construction of earthworks began at Reichenbach in October 1845. Up to 800 men worked simultaneously on the section between Reichenbach and Gersdorf, but the snowy winter of 1846/47 brought work to take a stop. A test run between Löbau and Reichenbach was held on 29 April 1847 and the section was opened on 1 July of that year. The 102.2 km long line from Görlitz to Dresden was formally opening on 1 September 1847, along with the line from Görlitz to Węgliniec.[2]

For nearly 20 years the railway line was controlled by the Saxon government. Following the Austro-Prussian War of 1866, in which Saxony had fought on the Austrian side, and the Peace of Prague, Saxony ceded ownership of the railway section located in Prussia to Prussia, but continued to operate the whole line on a contractual basis.[3]

In the Second World War

[edit]

With the outbreak of the Second World War on 1 September 1939, restrictions were soon imposed on the right of the public to travel on trains.[4]

In April 1945 the line became heavily used for the passage of refugees, especially from Silesia, and the retreating Wehrmacht. All military trains had first priority on the line, often preventing the movement of trains carrying refugee and the wounded for days. On 16 April the Eastern Front reached the Neisse river and the spearhead of the Soviet 52nd Army reached the edge of Bautzen on 19 April. On 20 April the 52nd Soviet army began an attack on the defences of the Wehrmacht and the Volkssturm in the town centre. The German army held the Soviets off, but the Soviets broke through to the centre of the town on 24 April and heavy street fighting took place around Bautzen station. The last refugee train ran on the morning of 20 April from Bautzen towards Bischofswerda. As a result of the fighting on 24 April, the station building was completely destroyed. After the end of the war on 9 May 1945, almost all of the line was unusable, since all the bridges between Görlitz and Bautzen had been blown up or otherwise destroyed by the German Army on 7 May 1945, including the Neisse viaduct in Görlitz, the rail bridge in Löbau and the Spree viaduct in Bautzen. Furthermore, the line also lacked rolling stock, as many locomotives had been moved to the west.[5][6]

Reconstruction after the Second World War

[edit]

The reconstruction of the viaducts proved to be especially difficult, therefore travellers often had to change train. New stations were established, for example, Löbau Ost station opened at the eastern end of the Löbau viaduct on 6 August 1945 for a shuttle service from Görlitz. According to the timetable of November 1945, travellers from Görlitz had to take a two km walk from Löbau Ost to Löbau station. Numerous temporary bridges were built. The temporary bridge in Bautzen was completed in September 1945 and it was followed in October by the temporary Demitz viaduct. After the completion of temporary bridges at Blösa (6 November 1945) and Löbau (10 November), a continuous train service officially resumed between Görlitz and Dresden-Neustadt. Most of the temporary bridges were continuously monitored by so-called "bridge guards" of the transport police. Probably in anticipation of the subsequent dismantling of the second track, the temporary bridges were built for one track only.[7][8]

In March 1946 work began on removing one track between Dresden and Görlitz to provide reparations to the Soviet Union. Stations left with crossing loops included Breitendorf, Pommritz, Kubschütz and Seitschen stations.[9]

Normalisation in the 1970s and 1980s

[edit]

In 1970, the second track was restored between Dresden-Klotzsche and Bautzen. This was followed in later years by the restoration of the Bautzen–Breitendorf, Reichenbach–Gersdorf and Markersdorf–Schlauroth marshalling yard sections. Between 1980 and 1984, the Gersdorf–Markersdorf and Löbau–Zoblitz sections regained their second track. One reason for the restoration of the track was increasing coal freight traffic. Single track remained until 1993 or 2000 only on the sections between Breitendorf and Löbau and between Schlauroth and Görlitz. In 1975 there were nine pairs of express trains, six of which ran to or from Poland. Travel time was a minimum of 92 minutes, only seven minutes less than in 1905.[10]

After the political changes in East Germany in 1989

[edit]

After the political changes in Eastern Germany in 1989, reconstruction of the second track was accelerated. On 16 October 1994, the last remaining significant section of the line between Breitendorf and Löbau was restored to two tracks. Single track initially remained on short section of line between Schlauroth junction and Görlitz. During the reconstruction of the Görlitz node in 2000 this was reconstructed as double track. On 25 June 2000, two track operations commenced.[11]

The former express service between Dresden and Görlitz was replaced in the late 1990s by InterRegio trains. Services stopping in Bautzen, Görlitz and Löbau ran every two hours. With the progressive abolition of InterRegio trains, this service was replaced by three pairs of trains, which reversed in Görlitz to continue to Wroclaw. On 11 December 2004, long-distance trains were discontinued altogether on this line. Since then, the Dresden–Görlitz line has only been served by regional trains.

In 2002 electrical contact wire was installed on the short section between Dresden-Neustadt and Dresden-Klotzsche for the S-Bahn service to Dresden Airport.

In 2003, a German–Polish agreement was signed on cooperation to improve rail links. As part of this agreement, it was agreed to upgrade the Polish border–Görlitz–Dresden section to allow speeds of 120–160 km/h, with long-term electrification. This is intended to reduce travel times for EuroCity and InterCity trains with traditional railway vehicles to about 3 hours 45 minutes between Dresden and Wroclaw. The implementation of these measures depends on funding.[12] This work has not yet started.

Operations

[edit]

The Görlitz–Dresden line traffic is served by regional transport only. Trains on the line are managed by the Verkehrsverbund Oberelbe (Upper Elbe Transport Authority) and the Verkehrsverbund Oberlausitz-Niederschlesien (Upper Lusatia–Lower Silesia Transport Authority). A few services are provided under a contract awarded in December 2008 to Ostdeutsche Eisenbahn and operated as line OE60V. From March 2009 to December 2014, three pairs of regional trains each day were operated between Dresden and Wrocław Główny by DB Regio. Since then services have been provided by Vogtlandbahn and Koleje Dolnośląskie, but were interrupted for a few months in 2015.

The following table shows regional services that use all or part of the Görlitz–Dresden line (May 2017):

Line Route Frequency in minutes Remarks
RE1 Dresden – Bischofswerda – Görlitz 120 3x daily to Wrocław
RE2 Dresden – Bischofswerda (– ZittauLiberec) 120
RB33 Dresden – Dresden-Klotzsche (– Königsbrück) 60 (Sa/Su: 120)
RB34 Dresden – Radeberg (– Kamenz) 60 (Su: 120)
RB60 Dresden – Bischofswerda – Görlitz 120
OE60V Bischofswerda – Görlitz 120 Mo-Sa only
RB61 Dresden – Bischofswerda (– Zittau) 120
S2 (Pirna –) Dresden-Neustadt – Dresden-Klotzsche (– Dresden Airport) 30

Sources

[edit]

Notes

[edit]
  1. ^ Eisenbahnatlas Deutschland [German railway atlas]. Schweers + Wall. 2009. pp. 60, 61, 73. ISBN 978-3-89494-139-0.
  2. ^ a b Rettig 1994, p. 62.
  3. ^ Rettig 1994, pp. 62f.
  4. ^ von Polenz 2006, pp. 141f.
  5. ^ von Polenz 2006, p. 144.
  6. ^ Rettig 1994, p. 63.
  7. ^ Rettig 1994, p. 66.
  8. ^ von Polenz 2006, p. 146.
  9. ^ von Polenz 2006, pp. 145ff.
  10. ^ Rettig 1994, pp. 62, 70.
  11. ^ "Mehrgleisiger Streckenausbau in Sachsen". Eissenbahnen in Sachsen (in German). Retrieved 27 August 2010.
  12. ^ "Agreement between Germany and Poland of railway services" (in German). German Ministry of Transport, Building and Housing. Retrieved 27 August 2010.

References

[edit]
  • Preuß, Erich; Preuß, Rainer (1991). Sächsische Staatseisenbahnen (in German). Berlin: transpress Verlagsgesellschaft mbH.
  • von Polenz, Hans (2006). Eisenbahnen im Bautzener Land (in German). Lausitzer Druck- u. Verlagshaus. ISBN 3-00-018243-8.
  • Rettig, Wilfried (1994). Eisenbahnknoten Görlitz (in German). Bufe Fachbuch-Verlag. ISBN 3-922138-53-5.